1031 results found for 'third round'

1031 results found for 'third round'
Order results by

A list of search results

  • 16 September 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Synera Renewable Energy (SRE) has partnered with Siemens Gamesa for the third time, selecting the company to supply 35 14 MW turbines for the Formosa 4 offshore wind farm in Taiwan. The turbines will be provided by Siemens Gamesa’s industrial nacelle factory in Taichung, Taiwan. The wind turbine foundations will be supplied by the local […]

  • 7 October 2025
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    The two developers that the Crown Estate selected this year to build floating offshore wind farms in the Celtic Sea, Equinor and a joint venture between EDF and ESB, have now entered into lease agreements for their floating wind projects with the UK seabed manager. Equinor and the EDF-ESB joint venture, named Gwynt Glas, were […]

  • 29 September 2025
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    The consortium between Denmark’s Semco Maritime and Vietnam’s PTSC Mechanical & Construction (PTSC M&C) has secured an Engineering, Procurement, and Construction (EPC) contract with Synera Renewable Energy (SRE) for the offshore substation of the Formosa 4 offshore wind farm in Taiwan. Following extensive negotiation rounds, the consortium was awarded the EPC contract in late August […]

  • 19 June 2025
    Authorities, Contracts & Tenders, Floating Wind, Planning & Permitting, Supply Chain

    The Crown Estate has selected Equinor and Gwynt Glas, a joint venture between EDF Renewables UK and ESB, as preferred bidders in the seabed leasing round for floating wind projects in the Celtic Sea. Selected on 12 June, each of the two developers was awarded 1.5 GW of capacity in their respective project development area (PDA) […]

  • 26 June 2025
    Authorities, Industry, Market Outlooks, Outlook & Strategy, Planning & Permitting

    The Welsh government has launched a comprehensive action plan which aims to maximise the country’s offshore wind potential and secure long-term economic benefits. The action plan, prepared by a task and finish group established earlier this year, outlines that Wales’ pipeline exceeds 15 GW of offshore wind projects around its coastline, in Welsh, English, and […]

  • 3 July 2025
    Business & Finance, Contracts & Tenders, Foundations, Supply Chain

    Synera Renewable Energy (SRE) has awarded a contract to Century Wind Power (CWP) to supply wind turbine foundations for the 495 MW Formosa 4 offshore wind farm in Taiwan. Under the contract, the Taiwan-based company will supply 35 jacket foundations for Formosa 4 and be responsible for the overall coordination of the foundation package in […]

  • 8 August 2025
    Business & Finance, Vessels

    Synera Renewable Energy (SRE) has awarded a 15-year contract to Dong Fang Offshore (DFO) to support the operations and maintenance (O&M) of SRE’s fleet of assets, starting with the Formosa 4 offshore wind project in Taiwan. Under the contract, which is the longest of its type in Taiwan’s offshore wind sector to date, DFO will […]

  • 13 August 2025
    Project Updates, Wind Farm Update

    A nearshore geophysical survey and a drop-down video survey are starting this month at the two Norfolk Vanguard offshore wind sites, located 50 to 80 kilometres off the coast of Norfolk in the UK, where RWE plans to build offshore wind farms with an installed capacity of 1.4 GW each. The environmental drop-down video (DDV) […]

  • 28 October 2025
    Business & Finance, Fixed-Bottom, Supply Chain, Transition, Vessels

    [CORRECTION NOTE: The article initially implied that the jack-up rig would be deployed on Dogger Bank Wind Farm for GE Vernova. The updated article notes two projects in the UK North Sea in which GE Vernova is currently engaged: Sofia and Dogger Bank Wind Farm.] Valaris has been awarded a contract for one of its […]

  • 2 July 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    Denmark’s Cadeler has received a notice of termination from Ørsted in relation to the long-term agreement for one of its wind farm installation vessels. A long-term charter agreement for an A-Class wind farm installation vessel was disclosed by Ørsted on April 8, 2024, securing operational capacity from the first quarter of 2027 through to the […]

  • 8 September 2025
    Business & Finance, Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    Ørsted’s Greater Changhua 2b offshore wind project in Taiwan will be commissioned in the third quarter of 2026 instead of later this year due to a damaged export cable. The 300 MW offshore wind farm is part of the 920 MW Greater Changhua 2b and 4 project, currently under construction 35-60 kilometres off the coast of Changhua […]

  • 3 September 2025
    Cables, Project Updates, Vessels, Wind Farm Update

    DEME’s cable-laying vessel (CLV) Viking Neptun is scheduled to start installing the first inter-array cables at the Dogger Bank C offshore wind farm site in the UK on or around 7 September. The vessel will lay the inter-array cable onto the seabed, where the cable will remain exposed until trenching is performed, which is scheduled […]

  • 27 May 2025
    Business & Finance, Business development, Collaboration, Outlook & Strategy, Research & Development

    Energy companies from Singapore, Malaysia, and Vietnam have signed a joint development agreement to explore cross-border renewable energy links, focusing on exporting offshore wind power from Vietnam. Through this agreement, Malaysia, as represented by MY Energy Consortium, a consortium established by Tenaga Nasional Berhad and Petroliam Nasional Berhad, will collaborate with a consortium comprising PetroVietnam […]

  • 16 September 2025
    Authorities, Contracts & Tenders, Planning & Permitting

    The Dutch government will announce the return of subsidies for offshore wind this afternoon (16 September), during Budget Day, national media reports. According to news from the Netherlands, the government will earmark around EUR 1 billion to support offshore wind next year. The revived subsidy scheme – which was not employed over the past few […]

  • 16 July 2025
    Contracts & Tenders, Fixed-Bottom, Ports & Logistics, Project Updates, Supply Chain, Wind Farm Update

    Ørsted has selected Steel River Quay on the Teesworks site on the south bank of the River Tees in the northeast of England as the construction base for the Hornsea 3 offshore wind farm. Ørsted signed a lease agreement for up to 300,000 square metres at Steel River Quay, which will be used to collect […]

  • 29 May 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Copenhagen Infrastructure Partners (CIP) has signed an agreement with ACEN, the listed energy company of the Ayala Group, to sell a 25 per cent minority stake in the up to 1 GW San Miguel Bay offshore wind farm in the Philippines. CIP said that the company and its Growth Market Fund II have sought a […]

  • 27 May 2025
    Business & Finance, Cables, Contracts & Tenders, Equipment, Grid Connection, Outlook & Strategy, Vessels

    Norway’s VARD has selected Brunvoll’s extensive propulsion and manoeuvring system for a new offshore subsea construction vessel (OSCV) it is building for Taiwan-based Dong Fang Offshore (DFO). The 121.3-metre-long vessel of VARD 3 39 design is said to be a highly versatile platform designed and equipped for subsea operation duties, offshore wind operations and maintenance […]

  • 3 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Dominion Energy said in its third-quarter 2025 results that recently imposed US tariffs have been incorporated into the updated cost estimate for the Coastal Virginia Offshore Wind (CVOW) project. The company now places total capital costs for the 2.6 GW offshore wind farm at approximately USD 11.2 billion (approximately EUR 9.7 billion), up from about […]

  • 27 August 2025
    Authorities, Planning & Permitting

    The Australian government has issued preliminary feasibility licences for three offshore wind projects in the Bunbury zone off the coast of Western Australia. Declared in September 2024, the Bunbury offshore wind zone covers an area of 3,995 square kilometres and has the potential to generate up to 11.4 GW of renewable energy. In June, Federal […]

  • 14 July 2025
    Authorities, Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update, Wind Turbines

    The Town and County of Nantucket in Massachusetts and GE Vernova have reached a settlement agreement worth USD 10.5 million (approximately EUR 9 million), which the wind turbine OEM will pay to compensate the Town and local businesses for losses resulting from the failure of a turbine blade on the Vineyard Wind 1 offshore wind […]

  • 4 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Ørsted has entered into an agreement with Apollo-managed funds (Apollo) for a 50 per cent equity ownership share in the company’s 2.9 GW Hornsea 3 offshore wind farm in the UK. The total value of the transaction is approximately DKK 39 billion (about EUR 5.2 billion), and the total project investment remains in the range of […]

  • 15 May 2025
    Operations & Maintenance

    German transmission system operator (TSO) 50Hertz has unveiled its plans to build a new operating site in Rostock on the Baltic Sea to support its offshore operations. The 90-million facility is scheduled to be completed in 2028. The investment costs for the new location amount to around EUR 90 million, with Germany’s federal state of […]

  • 6 May 2025
    Grid Connection, Offshore Platforms

    The topside for the Hollandse Kust West Beta offshore substation has been loaded out and is en route to its final location, around 50 kilometres off the coast of Egmond aan Zee, the Netherlands. Over the weekend, the loadout of the Hollandse Kust West Beta offshore substation topside took place at Equans’ yard in Hoboken, […]

  • 2 September 2025
    Business & Finance, Business development, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif Group, is facing a delay in the ramp-up of production at its new monopile production facility at Maasvlakte 2 in Rotterdam and expects to achieve this in the first half of 2026, instead of this year. Also in this article: In its half-year results for 2025, the company reported a […]

  • 5 May 2025
    Business & Finance, Vessels

    Vard has signed a contract with Taiwan-based Dong Fang Offshore (DFO) for the design and construction of a Commissioning Service Operation Vessel (CSOV), a sister vessel to the two ships Vard contracted with DFO in May 2024. After sealing the contract for two CSOVs in May last year, DFO is adding a third vessel of […]

  • 2 June 2025
    Business development, Industry, Innovation, Technology, Transition

    Digitalisation is a core strength of Norway’s offshore wind industry. Many Norwegian companies offer advanced digital solutions for operational efficiency, safety and sustainability. At Global Offshore Wind 2025 in London, June 17–18, Norwegian offshore wind companies will gather in one place to show why they are global leaders in digitalisation. Norway is recognised for leveraging […]