6470 results found for 'Gemini'

6470 results found for 'Gemini'
Order results by

A list of search results

  • 28 August 2025
    Cables, Grid Connection, Offshore Platforms

    Denmark’s NKT has finalised the installation of a 320 kV high-voltage DC (HVDC) power cable system at the 900 MW BorWin5 offshore grid connection in Germany. The pull-in work to the offshore platform was carried out by the company’s NKT Victoria vessel. NKT was responsible for the delivery and installation of 230 kilometres of 320 […]

  • 26 August 2025
    Business & Finance

    Mingyang Smart Energy has confirmed it is no longer involved in the 300 MW Waterkant offshore wind farm, developed by Luxcara, which just signed an agreement with Siemens Gamesa for a 1.5 GW project and said it was considering the same technology for Waterkant.  Luxacra entered into a preferred supplier agreement with Mingyang for the […]

  • 25 August 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain, Wind Turbines

    Luxcara has signed a capacity reservation agreement with Siemens Gamesa for the delivery of 97 15 MW turbines for its Waterekke offshore wind project in Germany. The Hamburg-based company is also examining the use of the same Siemens Gamesa turbines for the 300 MW Waterkant offshore wind farm. The approval documents for the 1.5 GW […]

  • 14 January 2026
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates

    HSI, a joint venture between HSM Offshore Energy, Smulders and Iv, has installed the Jasmund offshore substation (OSS), which will connect the Windanker offshore wind farm to the German electricity grid, at its designated location in the Baltic Sea. The Jasmund platform is part of the Ostwind 3 grid connection project, which will collect 300 MW […]

  • 13 October 2025
    Contracts & Tenders, Grid Connection, Supply Chain

    50Hertz has launched an EUR 11.7 million call for tenders for marine warranty surveyor (MWS) services for offshore wind energy projects in both the Baltic Sea and the North Sea. The German TSO is looking to award a framework agreement(s) for MWS services through four lots, with the contract for each lot worth a little […]

  • 21 November 2025
    Floating Wind, Foundations, Supply Chain, Technology

    BayWa r.e. has received concept certification from DNV for its BayFloat floating wind semi-submersible concrete substructure and mooring system design. The design was validated using the 22 MW generic reference turbine “IEA-22-280-RWT”. The certification process was conducted in accordance with DNV-SE-0422:2021-09 “Certification of floating wind turbines” scheme, including DNV-ST-0119:2021-06 “Floating wind turbine structures” as the […]

  • 28 January 2026
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    Skyborn Renewables and the German transmission system operator (TSO) 50Hertz, which is leading the development of the grid connection (OST-6-1) for the 976.5 MW Gennaker offshore wind farm, have signed an agreement that clears the way for the commissioning of the entire system by mid‑2028.  The contract governs the legally compliant cooperation for the construction […]

  • 15 October 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Swedish energy company Vattenfall has removed three unexploded sea mines dating from World War II in the area where it will build its Nordlicht offshore wind cluster in the German North Sea. The mines, each with an explosive force comparable to 200-300 kilogrammes of TNT, were first located as anomalies during prior geophysical surveys of […]

  • 6 October 2025
    Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The first of two platforms for the 976.5 MW Gennaker offshore wind farm, developed by Skyborn Renewables, has been moved out of the construction hall at the Smulders yard in Vlissingen, the Netherlands. OSS Darß, which was transported out of the construction hall in September, currently weighs 3,800 tonnes. The unit is 48 metres long, […]

  • 10 February 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    CS Wind Offshore has received the Final Notice to Proceed for the Nordlicht 2 transition pieces (TPs) from Vattenfall, which made the full final investment decision (FID) for its Nordlicht offshore wind projects in January. For the 1.6 GW Nordlicht cluster, CS Wind Offshore will deliver 68 TPs for the 980 MW Nordlicht 1 and […]

  • 13 March 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Germany’s RWE has completed the sale of the F.E.W. Baltic II offshore wind project in the Polish Baltic Sea to PGE Polska Grupa Energetyczna (PGE), making the Polish utility the sole owner of the 350 MW project. The offshore wind farm is planned to be built around 50 kilometres north of the Polish town of […]

  • 22 September 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    Glamox has secured contracts to provide connected marine lighting and light management systems for eleven offshore High-Voltage Direct Current (HVDC) converter platforms, being built for the Dutch/German transmission system operator (TSO) TenneT. The contracts represent Glamox’s largest marine lighting project to date, in which it will provide more than 38,000 marine lights with advanced systems […]

  • 18 November 2025
    Grid Connection, Offshore Platforms

    Both the topside and the jacket foundation of the 300 MW Jasmund offshore substation have been loaded out and are ready to set sail to the Baltic Sea for offshore installation. The topside, constructed at HSM Offshore Energy’s Stormpolder yard in the Netherlands, measures 48 metres long, 33 metres wide, and 17.5 metres high, and […]

  • 10 December 2025
    Fixed-Bottom, Foundations, Supply Chain

    Davi has reached another milestone in the project it’s carrying on with Titan Wind Energy, completing the Factory Acceptance Test (FAT) for four heavy-duty plate rolls designed for offshore wind tower and monopile manufacturing. The FAT took place in Week 46 at Davi’s headquarters in Cesena, Italy, where a delegation from Titan Wind Energy visited […]

  • 13 March 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates

    Belgian offshore contractor Jan De Nul plans to install three subsea power cables and a fibre optic cable simultaneously on several upcoming offshore grid connection projects for TenneT, introducing what the company describes as the industry’s first such installation. The work relates to the BalWin4, LanWin1, LanWin5 and BalWin5 grid connection projects in the German […]

  • 1 October 2025
    Business & Finance, Business development, Operations & Maintenance, Vessels

    Vard has delivered the first commissioning service operation vessel (CSOV) to Windward Offshore, Windward Athens, which marks the German company’s entry into the offshore wind operations & maintenance (O&M) market. Windward Offshore has three more CSOVs under construction at Vard. Built by Vard in Norway and delivered on schedule at Vard Brattvaag, the vessel is […]

  • 12 November 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Eneco has selected Deutsche Windtechnik as its new maintenance partner for the 120 MW Prinses Amalia offshore wind farm in the Netherlands. The contract will run from January 2026 until the offshore wind farm’s end of life. Under the agreement, Deutsche Windtechnik will provide full-scope maintenance and troubleshooting, including the deployment of permanent staff, supply […]

  • 2 February 2026
    Grid Connection, Manufacturing, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    The HSI Joint Venture, comprising HSM Offshore Energy, Smulders, and Iv, has rolled out the topside of the second offshore substation (OSS) for the German offshore wind farm Gennaker at HSM Offshore Energy’s yard in Schiedam, the Netherlands. The joint venture will now work toward the upcoming load-out, sail-away, and offshore installation. The substation, named […]

  • 10 February 2026
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    Chantiers de l’Atlantique has completed the construction and integration of two offshore electrical substations for the 660 MW Nordseecluster A offshore wind farm, currently under construction off the German coast. Each of the topsides is approximately 40 metres long and 22 metres high, with one weighing about 1,800 tonnes, while the other one comes in […]

  • 6 August 2025
    Authorities, Planning & Permitting

    Germany’s latest 2.5 GW offshore wind auction failed to attract any bids, leading the German Offshore Wind Energy Association (BWO) to call for a fundamental overhaul of the auction design. The auction, which ended on 1 August without an award, covered two sites, N-10.1 and N-10.2. A total capacity of 2.5 GW was planned to […]

  • 5 December 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The HSI consortium, comprising HSM Offshore Energy, Smulders, and Iv, has sent off the Jasmund offshore substation (OSS), which will connect the Windanker offshore wind farm in the Baltic Sea to the German electricity grid. The 4,500-tonne OSS topside, measuring 48 metres in length, 33 metres in width, 17.5 metres in height, has sailed out […]

  • 15 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    EnBW has decided to withdraw from the Mona and Morgan offshore wind projects in the UK after not securing Contracts for Difference (CfDs) in the UK’s seventh allocation round. The company says that in a challenging investment environment, the two projects are no longer economically viable as per EnBW’s criteria. EnBW has been developing the […]

  • 9 March 2026
    Vessels

    This article was updated to add information about Mitsui O.S.K.’s (MOL) acquisition of a stake in Deutsche Offshore Schifffahrt and shares in the company’s C-CSOVs. The first steel has been cut for the first of Deutsche Offshore Schifffahrt’s (DO) four construction commissioning service operation vessels (C‑CSOVs), ordered by Schoeller Holdings. The vessel, named DO Joule, […]

  • 10 March 2026
    Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    RWE has placed a firm wind turbine order with Vestas for its 1,380 MW Vanguard East offshore wind project in the UK, shortly after confirming a firm order for Vanguard West, which will have the same installed capacity.  For Vanguard East, Vestas will supply, deliver, and commission 92 of its V236-15.0 MW wind turbines, and […]

  • 4 December 2025
    Business & Finance, Contracts & Tenders, Ports & Logistics

    China-based manufacturer of offshore wind foundations, Dajin Heavy Industry, and Briese Schiffahrts, a German operator of heavy lift vessels and owner of a terminal in the Port of Cuxhaven, have signed a Memorandum of Understanding (MOU) for offshore wind marshalling services at the German port. Signed on 26 November, the MOU will facilitate creating an international offshore […]

  • 19 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    After EnBW decided to exit the Morgan and Mona offshore wind projects in the UK, totalling 3 GW, the company’s joint venture partner, JERA Nex BP, is acquiring EnBW’s stake in 1.5 GW Mona, while the joint venture will not continue with the Morgan offshore wind project. On 15 January, EnBW announced it was withdrawing […]