2915 results found for 'Hywind Scotland'

2915 results found for 'Hywind Scotland'
Order results by

A list of search results

  • 3 February 2026
    Cables, Grid Connection, Vessels

    Dutch shipbuilder and designer Neptune Marine has launched the hull of the dual-fuel cable installation and repair vessel destined for compatriot N-Sea Group. The hull of the 100-metre-long cable-laying vessel (CLV) Altera hit the water last weekend, starting its journey from the shipyard in Poland to the Netherlands. The Polish-built vessel is expected in the […]

  • 4 December 2025
    Business & Finance, Contracts & Tenders, Ports & Logistics

    China-based manufacturer of offshore wind foundations, Dajin Heavy Industry, and Briese Schiffahrts, a German operator of heavy lift vessels and owner of a terminal in the Port of Cuxhaven, have signed a Memorandum of Understanding (MOU) for offshore wind marshalling services at the German port. Signed on 26 November, the MOU will facilitate creating an international offshore […]

  • 10 March 2026
    Contracts & Tenders, Fixed-Bottom, Floating Wind, Supply Chain

    Interocean Marine Services has signed a master services agreement with JERA Nex BP to provide marine consultancy and assurance services in support of offshore wind operations in the North Sea and globally. Under the agreement, Interocean will deliver a range of marine services from its base in Aberdeen, Scotland, including marine assurance, engineering, offshore operations […]

  • 15 October 2025
    Business & Finance, Fixed-Bottom, Grid Connection

    The UK’s energy regulator, Ofgem, has selected Equitix as the preferred bidder to acquire and operate the offshore transmission assets for the 448 MW Nearth na Gaoithe offshore wind farm in Scotland. Equitix has been selected in a GBP 450 million (approximately EUR 516 million) tender round for an Offshore Transmission Owner (OFTO). As an asset […]

  • 25 March 2026
    Business & Finance, Business development, Manufacturing, Supply Chain, Wind Turbines

    Vestas plans to build a nacelle and hub assembly facility in Scotland to support offshore wind projects in the UK and across Europe. The proposed factory would require a capital investment of more than EUR 250 million and is planned to manufacture nacelles and hubs for the company’s V236-15.0 MW offshore wind turbine. The new […]

  • 28 October 2025

    Several industry organisations expressed dissatisfaction with the UK government’s offshore wind budget for Contracts for Difference (CfD) Allocation Round 7 (AR7), with WindEurope calling it “disappointing”. WindEurope described the UK government’s GBP 1.08 billion budget as disappointing, saying it undermines the growth of the country’s offshore wind sector and could affect the wider European industry. […]

  • 14 October 2025
    Authorities, Business & Finance, Environment, Fixed-Bottom, Floating Wind, Planning & Permitting

    Greenpeace UK has said it plans to take legal action against the Crown Estate, accusing the public body of “monopoly profiteering” from the auctioning of seabed rights for offshore wind projects, a system Greenpeace claims is pushing up energy costs and slowing Britain’s transition to clean power. The environmental group argues that the Crown Estate, […]

  • 2 March 2026
    Business & Finance, Vessels

    OEG has taken the delivery of a multi-purpose crew transfer vessel (CTV), named Fulmar, which recently completed sea trials and will soon be deployed on the Inch Cape offshore wind farm in Scotland. Fulmar will be supporting the offshore construction of the 1.1 GW offshore wind farm under a contract OEG was awarded last year. At […]

  • 4 March 2026
    Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    Aventus Energy, a specialist inspection, repair and maintenance provider to the offshore energy industry, has secured a contract for the Inch Cape offshore wind farm, with the year-long scope covering foundation acceptance at the Port of Leith. The Scotland-based company, which says this is its largest single contract award to date, is delivering the work […]

  • 10 November 2025
    Business & Finance, Business development, R&D, Research & Development, Technology

    Mingyang Smart Energy and the UK’s Offshore Renewable Energy (ORE) Catapult have signed a contract to provide testing and validation of the main bearing for Mingyang Smart Energy’s 18.5 MW offshore wind turbine. The test piece is scheduled to arrive at ORE Catapult’s National Renewable Energy Centre in Blyth, Northumberland, in the coming months and […]

  • 6 November 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    ARB Wind has been awarded a multi-year contract for above water foundation inspections and Balance of Plant (BoP) services by Neart na Gaoithe (NnG) Offshore Wind Limited for the 450 MW offshore wind farm in Scotland. ARB Wind will provide dedicated BoP technicians to deliver a wide range of services across NnG’s offshore and onshore […]

  • 14 January 2026
    Authorities, Floating Wind, Planning & Permitting

    The UK government has awarded a record 8.4 GW of offshore wind capacity in the Contracts for Difference Allocation Round 7 (AR7), including two floating wind projects. The biggest winner of the UK’s latest CfD round is RWE, which secured contracts for almost 7 GW of offshore wind projects. RWE has been awarded CfDs at a strike price […]

  • 26 November 2025
    Business & Finance, Floating Wind, Project Updates, Wind Farm Update

    BW Ideol Projects Company (BWIPC), owned by BW Ideol (75 per cent) and ADEME Investissement (25 per cent), has taken a minority equity stake in Eoliennes Méditerranée Grand Large, the developer behind the upcoming Méditerranée Grand Large floating offshore wind farm in France. Under the deal with the joint venture between EDF Power Solutions and […]

  • 21 January 2026
    Environment, Fixed-Bottom, Project Updates, Research & Development, Wind Farm Update

    The Neart na Gaoithe (NnG) offshore wind farm in Scotland is launching what the project owner says is the country’s largest seabird monitoring study, aimed at gathering detailed data on bird behaviour around offshore wind turbines. The 450 MW wind farm, located around 15.5 kilometres off the Fife coast in the Outer Firth of Forth, […]

  • 26 November 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Operations & Maintenance, Supply Chain

    Føn Energy Services has secured a five-year contract to provide inspection, repair and maintenance services across six Dutch offshore wind farms after winning a combined tender issued by their owners, the company revealed on 26 November at the Offshore Energy Exhibition & Conference (OEEC) in Amsterdam. The award covers Borssele 3&4, owned by the Blauwwind […]

  • 25 March 2026
    Cables, Contracts & Tenders, Grid Connection, Offshore Platforms, Operations & Maintenance

    The UK energy regulator Ofgem has unveiled its shortlist of bidders under the Offshore Transmission Owner (OFTO) Tender Round 13, in which five companies and consortia will compete to own and operate the offshore electricity transmission links for the East Anglia Three, Inch Cape and Dogger Bank C offshore wind farms.   Ofgem said on 24 March that this was […]

  • 11 March 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    Seaway7 is scheduled to start installing monopile transition pieces (TPs) at the Inch Cape offshore wind farm site in Scotland this month. At the beginning of March, the first jacket foundations for the project, which will comprise a combination of monopile and jacket foundations, arrived in the Port of Leith. Heavy-lift vessel Seaway Alfa Lift […]

  • 28 October 2025
    Authorities, Fixed-Bottom, Floating Wind, Planning & Permitting

    The UK government has set a total budget of GBP 1.08 billion (approximately EUR 1.24 billion) for offshore wind and floating wind in the Contracts for Difference (CfD) Allocation Round 7 (AR7) renewables auction. A total of GBP 900 million has been set for fixed-bottom projects in Pot 3, with delivery years of 2028/29, 2029/30, […]

  • 24 March 2026
    Project Updates, Technology, Vessels

    Stillstrom has partnered with Faber Group and Prysmian to develop an offshore charging solution aimed at reducing emissions from vessels operating in the offshore wind sector. The first demonstration trial is scheduled for the fourth quarter of 2026 in Esbjerg. The companies will pilot a system that enables hybrid and electric service operation vessels (SOVs) […]

  • 26 March 2026
    Authorities, Contracts & Tenders, Fixed-Bottom, Floating Wind, Planning & Permitting

    The UK Low Carbon Contracts Company (LCCC) has signed Contracts for Difference (CfD) with more than 200 projects awarded in the Allocation Round 7 (AR7), covering a total capacity of around 14.7 GW, with 8.4 GW offshore wind projects accounting for the biggest share of the contracted capacity. LCCC is the single counterparty to the […]

  • 26 February 2026
    Authorities, Contracts & Tenders, Grid Connection, Planning & Permitting

    The government of Nova Scotia has introduced legislation that would set bid fees and levies for offshore wind developers as part of the Canadian province’s broader offshore wind licensing regime. On 24 February, Premier of Nova Scotia, Tim Houston, tabled the Powering the Economy Act, which creates an Offshore Renewable Energy Revenue Act. The new […]

  • 18 November 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    NKT has completed a turnkey repair of one of the 220 kV high-voltage AC subsea export cables connecting the Beatrice offshore wind farm in the Scottish Moray Firth to the Aberdeenshire coast. In April 2025, an unplanned transmission outage occurred on one of two of Beatrice’s Transmission Capital Partner (TCP) -owned export cables, bringing renewable […]

  • 12 November 2025
    Floating Wind, Foundations, Supply Chain, Technology

    Norwegian floating wind platform developer Odfjell Oceanwind has received a Basic Design Approval (BDA) from DNV for its Deepsea Star semi-submersible floater design. The BDA covers the use of the design with the SG 14‑236 DD 15 MW turbine from Siemens Gamesa in a wide range of offshore conditions. The approval was granted in accordance […]

  • 23 October 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    The first of the two 85-kilometre export cables for the Scottish Inch Cape offshore wind farm has been installed by Enshore Subsea using the cable laying vessel (CLV) CMOS Installer. Operating from the Port of Blyth, the vessel laid the 220 kV, three-phase cable manufactured by Ningbo Orient Wires & Cables (Orient Cable) in three […]

  • 27 January 2026
    Business development, Floating Wind, Innovation, Research & Development

    The European Marine Energy Centre (EMEC) in Scotland is working on setting up a deepwater and floating wind test facility off Orkney. After securing a 50 per cent match funding through The Crown Estate’s Supply Chain Accelerator, the organisation has commenced an 18‑month project to move the development of the test facility, named DeepWind, from […]

  • 30 March 2026
    Business & Finance, Ports & Logistics

    An investment of over GBP 30 million (around EUR 35 million) in new facilities that will support offshore wind construction at the Port of Nigg in Scotland has received final approval by Maraen, a new integrated energy infrastructure brand launched by Mitsui & Co. Europe and Mitsui O.S.K. Lines (MOL), which acquired Port of Nigg, […]