10000 results found for 'Poland'

10000 results found for 'Poland'
Order results by

A list of search results

  • 29 May 2025
    Infrastructure, Ports & Logistics

    Windar Renovables has laid the cornerstone for a planned offshore wind turbine tower factory in Szczecin, Poland. The facility is scheduled to go into operation in 2026 and will directly create 450 jobs. The factory will serve domestic and global demand and play a key role in supporting the Polish offshore wind sector, said Windar […]

  • 24 January 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    Grupa Przemysłowa Baltic Sp. z o.o. (GPB) has completed the construction of two offshore substation topsides for the 1.2 GW Baltic Power offshore wind farm in Poland’s Baltic Sea. Under a contract signed in 2023, GPB manufactured the two offshore substation topsides that will be installed at the Baltic Power site some 23 kilometres off […]

  • 20 May 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Equinor and Polenergia have taken a final investment decision for the Bałtyk 2 and Bałtyk 3 offshore wind farms, which will have 1.44 GW of installed capacity in Poland. The total investment of the project is approximately PLN 27 billion (approximately EUR 6.28 billion) in the construction, excluding financing costs, according to the joint venture […]

  • 19 May 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    PGE Polska Grupa Energetyczna (PGE) and Ørsted have signed a contract with Smulders for the manufacturing of suspended internal platform cages for the 1.5 GW Baltica 2 offshore wind farm in Poland. The additional steel structures for the foundations allow operational crews access to the wind turbine and the distribution box for technical interventions. The […]

  • 30 January 2025
    Business & Finance, Business development, Contracts & Tenders, Fixed-Bottom, Research & Development, Supply Chain

    Norway-headquartered DeepOcean has been awarded a subsea survey contract for the Bałtyk 2 and Bałtyk 3 offshore wind projects in Poland, which are jointly developed by Equinor and Polenergia. Under the contract, DeepOcean will carry out geophysical seabed surveys of the export and inter-array cable corridors, utilising a dedicated survey remotely operated vehicle (SROV). The […]

  • 25 March 2025
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The 1.2 GW Baltic Power offshore wind project, a joint venture between Orlen and Northland Power, has obtained the first design conformity certificates for its turbines and offshore substations, issued by DNV. The certificates, issued by DNV, verify that the construction designs of the wind turbines and the offshore substations are in compliance with international […]

  • 3 April 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Smulders has completed the first loadouts of the transition pieces (TPs) to be installed at the 1.2 GW Baltic Power offshore wind farm in Poland. The loadouts started in January 2025 from the Smulders yard in Newcastle, the UK. Each TP weighs 350 tonnes and is 27 metres high. According to Smulders, this marks a […]

  • 7 July 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The first of 76 Vestas 15 MW turbines has been installed at the Baltic Power offshore wind farm in Poland, developed by a joint venture between the Orlen Group and Northland Power. Cadeler has been selected as the transport and installation contractor by the joint venture. The O-Class jack-up vessel Wind Osprey will lead the […]

  • 11 June 2025
    Authorities, Fixed-Bottom, Planning & Permitting

    Poland is set to hold its first auction for offshore wind farms in December 2025, the country’s Energy Regulatory Office (ERO) announced this week. Equinor and Polenergia have submitted a pre-qualification application to ERO for the Bałtyk 1 offshore wind farm project to participate in the first offshore auction in Poland. The first auction for […]

  • 31 March 2025
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain, Wind Farm Update

    Ocean Winds has selected CRIST Offshore to deliver the offshore substation for the BC-Wind offshore wind farm in Poland. According to Ocean Winds, this is the first Tier 1 agreement the developer concluded with a Polish supplier for its 390 MW BC-Wind project. Under the agreement, CRIST Offshore will be responsible for the design, construction and […]

  • 17 March 2025
    Project Updates, Vessels

    The hull of the second commissioning service operation vessel (CSOV) for Bernhard Schulte Offshore arrived at Ulstein Verft in Norway from Poland on 11 March. The first CSOV Bernhard Schulte Offshore ordered at Ulstein was launched on 23 February and is planned for delivery in the second quarter of this year. The hull was built […]

  • 10 January 2025
    Business & Finance, Contracts & Tenders, Infrastructure, Operations & Maintenance, Supply Chain

    PGE Baltica, owned by PGE Polska Grupa Energetyczna, has appointed Sweco Polska as a contract engineer for the construction of an operational and maintenance (O&M) base in Ustka, Poland. The contract engineer is responsible for the supervision over the detailed design and construction of the O&M base, including the buildings, quay reconstruction, and the entire […]

  • 21 May 2025
    Operations & Maintenance

    Baltic Power, a joint venture between Orlen and Northland Power, has launched Poland’s first operations and maintenance (O&M) base dedicated to offshore wind projects. The facility will support the 1.2 GW Baltic Power offshore wind farm for its entire lifecycle of approximately 30 years. Construction of the Łeba base began in January 2024 and was completed […]

  • 25 June 2025
    Contracts & Tenders, Fixed-Bottom, Ports & Logistics, Supply Chain

    Ocean Winds has signed a reservation agreement for the use of the T5 terminal at the Port of Gdańsk for its BC-Wind offshore wind project in Poland. Under the agreement, Ocean Winds will use the T5 terminal as a base for the installation of BC-Wind turbines in 2028. This is the second Polish port, after […]

  • 21 April 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Grid Connection, Onshore Infrastructure, Supply Chain

    Ocean Winds has awarded P&Q a contract to build the onshore substation for its 390 MW BC-Wind offshore wind project in the Polish Baltic Sea. The contract covers the design, construction, installation, and commissioning of an onshore substation for integration into the national power system in the Choczewo municipality in the northern Pomeranian province. The […]

  • 29 January 2025
    Business & Finance, Business development, Research & Development, Vessels

    Poland’s Tele-Fonika Kable (TFK) and the Industrial Development Agency (ARP) have signed a letter of intent to collaborate on the construction of a cable laying vessel (CLV) for the installation and maintenance of subsea cables in offshore wind farms, mainly in the Baltic Sea. On 28 January, the two companies signed a letter of intent […]

  • 7 February 2025
    Business & Finance, Vessels

    Ocean Winds and Cadeler have signed a vessel reservation agreement for the installation of the turbines at the BC-Wind offshore wind farm in the Polish Baltic Sea. The potential value of the contract to be negotiated during the pendency of the reservation agreement is estimated to be between EUR 48 million and EUR 56 million. […]

  • 30 January 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Ørsted and PGE Polska Grupa Energetyczna (PGE) have taken the final investment decision (FID) on the 1.5 GW Baltica 2, which is the first stage of the Baltica Offshore Wind Farm in the Polish Baltic Sea. Located approximately 40 kilometres off the Polish coast near Ustka, Baltica 2 has a 25-year inflation-protected contract for difference […]

  • 28 May 2025
    Business & Finance, Contracts & Tenders, Equipment, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    PGE Polska Grupa Energetyczna (PGE) and Ørsted have signed a contract with Grupa Przemysłowa Baltic for the production and delivery of additional secondary steel structures for the Baltica 2 foundations that will be installed in the Polish Baltic Sea. Grupa Przemysłowa Baltic will manufacture the platforms for mooring service vessels and anode cages in the Gdańsk […]

  • 6 February 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Offshore construction has begun on the up to 1.2 GW Baltic Power wind farm, a joint venture between PKN Orlen and Northland Power, with the installation of the first monopiles. Preparatory and trial operations for offshore construction began in January, with several vessels involved, including Van Oord’s heavy-lift ship Svanen. On 6 February, Baltic Power, […]

  • 28 April 2025
    Authorities, Environment, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Equinor and Polenergia have secured the final environmental decision, issued by the Regional Director for Environmental Protection (RDOŚ) in Gdańsk, for the Bałtyk 1 offshore wind farm as the project is being prepared for auction in Poland in 2025. “This is an extremely important moment for the Bałtyk 1 project, bringing us closer to participating […]

  • 24 June 2025
    Business & Finance, Vessels

    PGE Baltica, a subsidiary of the PGE Group, has signed a letter of intent with CRIST, its special-purpose company WIKE, and the Baltic Industrial Group to cooperate on the construction of offshore wind installation and service vessels. CRIST, WIKE, and the Baltic Industrial Group signed a letter of intent on 24 June, saying they plan […]

  • 9 July 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The vessel Olympic Electra has begun relocating boulders at the Baltica 2 project site, marking the start of the preparatory work ahead of offshore construction of what will be the biggest offshore wind farm in Poland. Boulder relocation is a key stage in preparing for the installation of foundations and underwater infrastructure, Ørsted, which owns […]

  • 3 June 2025
    Business development, Fixed-Bottom, Project Updates, Research & Development, Wind Farm Update

    Poland’s Orlen Group has selected three local companies to explore the geological conditions of the seabed within the Baltic East offshore wind farm concession area in the Baltic Sea. A consortium of three companies, MEWO, Orlen Petrobaltic, and Geofizyka Toruń, will conduct geological engineering, seismic, and laboratory tests for Orlen. They will assess the strength […]

  • 10 June 2025
    Business & Finance, Contracts & Tenders, Ports & Logistics, Supply Chain

    Ocean Winds has signed a lease agreement with ORLEN Neptun to use its offshore wind installation terminal at Świnoujście Port in Poland for the BC-Wind project. Under the agreement, Ocean Winds, a joint venture between ENGIE and EDP Renewables, will start operations at the terminal in 2027. The terminal at Świnoujście Port will be used […]

  • 23 May 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Equinor and Polenergia have reached financial close for the Bałtyk 2 and Bałtyk 3 offshore wind farms in Poland, for which the joint venture partners secured two project financing packages of over EUR 3 billion for each wind farm, including ancillary facilities. The finance packages will fund the capital investment and other expenses of each […]