10000 results found for 'wind'

10000 results found for 'wind'
Order results by

A list of search results

  • 4 September 2025
    Business & Finance, Cables, Energy Islands, Grid Connection, Onshore Infrastructure

    NKT has signed a contract with the Danish transmission system operator (TSO) Energinet to deliver a high-voltage direct current (HVDC) power cable system for the offshore interconnector linking the Bornholm Energy Island to the power grid on Zealand in Denmark. NKT’s scope of work includes the delivery of a 525 kV HVDC onshore and offshore […]

  • 18 August 2025
    Business & Finance, Operations & Maintenance, Technology

    Japanese offshore wind developer ENEOS Renewable Energy (ERE) has entered into an agreement with Shoreline Wind, a Norwegian provider of SaaS solutions for the wind energy industry, to deploy Shoreline’s AI-powered platform to optimise construction and O&M of its offshore wind projects. According to Shoreline, its digital platform is designed to manage the full lifecycle […]

  • 14 August 2025
    Business & Finance, Collaboration, Fixed-Bottom, Outlook & Strategy, Project Updates, Wind Farm Update

    Enefit Green has agreed with Japan’s Sumitomo Corporation to terminate their partnership in the development of the Liivi Bay offshore wind farm in Estonia. The decision follows thorough joint discussions on the offshore wind outlook in Estonia and assessment of the current market and regulatory conditions. In recent months, both parties started to work on […]

  • 21 October 2025
    Grid Connection, Offshore Platforms

    Fugro completed land and marine investigations for TenneT Germany’s LanWin1 and LanWin2 grid connections, which are part of the transmission system operator’s (TSO) 2 GW programme. The LanWin2 cable route required a range of onshore and nearshore investigation activities to support project development. Fugro’s new GroundIQ service enabled low-impact geophysical surveys, including electrical resistivity profiling and […]

  • 3 September 2025
    Cables, Project Updates, Vessels, Wind Farm Update

    DEME’s cable-laying vessel (CLV) Viking Neptun is scheduled to start installing the first inter-array cables at the Dogger Bank C offshore wind farm site in the UK on or around 7 September. The vessel will lay the inter-array cable onto the seabed, where the cable will remain exposed until trenching is performed, which is scheduled […]

  • 29 August 2025
    Business & Finance, Cables, Contracts & Tenders, Floating Wind, Grid Connection, Onshore Infrastructure, Project Updates, Supply Chain, Wind Farm Update

    The renewable energy consultancy OWC has been awarded a contract to provide cable engineering support to the Green Volt floating offshore wind farm in Scotland, developed by Flotation Energy and Vårgrønn. OWC’s scope of work includes cable engineering for both offshore and onshore cables. The subsea scope focuses primarily on the export cable, but OWC […]

  • 14 August 2025
    Business & Finance, Business development, Cables, Floating Wind, Grid Connection, Infrastructure, Innovation, Outlook & Strategy, Research & Development, Technology

    The US subsea engineering and applied technology firm Oceaneering International has secured a GBP 400,000 (around EUR 465,000) grant from Scotland’s economic development agency Scottish Enterprise for a project that aims to add manufacturing capacity for subsea power cables destined for Scottish offshore wind. Oceaneering’s Rosyth umbilical and cable manufacturing facility, which has been operating at […]

  • 11 August 2025
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting

    Massachusetts Department of Energy Resources (DOER) does not expect the Round 5 Request for Proposals (RFP) for offshore wind to be issued until next year, at the earliest, due to uncertainty at the federal level. In a letter to the state’s Department of Public Utilities (DPU), dated 7 August, DOER noted that it is required […]

  • 28 August 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    Belgium-headquartered G-Tec has won a contract to conduct a geophysical survey for ELWIND, the Estonian-Latvian cross-border offshore wind project. The company, under a contract worth a little over EUR 3.6 million, will perform a geophysical survey and ground model development for the ELWIND offshore wind farm areas. The objective of the survey is to enhance […]

  • 1 September 2025
    Authorities, Fixed-Bottom, Planning & Permitting

    The Danish Energy Agency (DEA) has revised the applications for feasibility study permits under the open-door scheme, for which the process was suspended in 2023 and reactivated last year. The DEA has now made new decisions in the cases and maintains the rejection of all 37 applications. The DEA put the processing of cases under […]

  • 13 August 2025
    Project Updates, Wind Farm Update

    A nearshore geophysical survey and a drop-down video survey are starting this month at the two Norfolk Vanguard offshore wind sites, located 50 to 80 kilometres off the coast of Norfolk in the UK, where RWE plans to build offshore wind farms with an installed capacity of 1.4 GW each. The environmental drop-down video (DDV) […]

  • 2 September 2025
    Business & Finance, Business development, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif Group, is facing a delay in the ramp-up of production at its new monopile production facility at Maasvlakte 2 in Rotterdam and expects to achieve this in the first half of 2026, instead of this year. Also in this article: In its half-year results for 2025, the company reported a […]

  • 12 August 2025
    Floating Wind, Foundations, Manufacturing, Supply Chain

    Aikido Technologies, which recently secured a spot at a Norwegian offshore demo site, has released an RFI for its 15 MW ‘AO60’ floating wind platform to offshore wind fabricators. The California-based floating wind foundation developer said on social media that it had issued the RFI to more than ten “top-tier offshore wind fabricators from around […]

  • 11 August 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The offshore substation for the Taipower Offshore Wind Project Phase II (TPC Phase II) has been installed at the site in Taiwan. The topside, which left Vietnam in July, was placed on top of its jacket foundation by Shinfox Far East Energy’s SFE Hercules. The launching ceremony for the offshore substation was held at the […]

  • 3 September 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    China’s CNOOD-Wenchong Heavy Industries (CWHI) has sent off the first 8 XXL monopiles for the 1.1 GW Inch Cape offshore wind farm off the east coast of Scotland. Manufactured at CWHI’s Qinzhou yard, the monopiles were shipped on 31 August aboard the COSCO vessel XIAN TAI KOU. The shipment is en route to Forth Ports […]

  • 1 September 2025
    Business & Finance, Fixed-Bottom

    Equinor plans to participate in Ørsted’s upcoming rights issue, worth around EUR 8 billion, and maintain its 10 per cent ownership stake in the Danish offshore wind developer. On 1 September, Equinor said that, subject to the final terms of the rights issue, it intends to subscribe for new shares at a consideration of up […]

  • 15 August 2025
    Fixed-Bottom, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    Century Wind Power has delivered all three-legged jacket foundations for the 1 GW Hai Long offshore wind project in Taiwan. The delivered wind turbine jacket foundations are the largest and heaviest ever produced for a Taiwanese offshore wind farm, according to Hai Long Offshore Wind. Each stands over 90 metres tall and weighs approximately 2,000 […]

  • 13 August 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    Colombia’s Ministry of Mines and Energy has issued a new resolution launching the country’s first offshore wind bidding round, which will operate under a contract for differences (CfD) scheme. The round is designed to promote strategic technologies that strengthen the resilience and sustainability of the National Interconnected System, according to the ministry. Colombia guarantees prices […]

  • 5 September 2025
    Business & Finance, Contracts & Tenders, Energy Islands, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    The transmission system operators (TSOs), Energinet and 50Hertz, have placed a joint order with Siemens Energy for the construction and turnkey delivery of four converter stations and other technical components that will connect the Bornholm Energy Island project to the mainland grids of Denmark and Germany. The major contract covers the design, completion, transport, installation, […]

  • 8 September 2025
    Foundations, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    The first steel has been cut for the jacket foundation that will support the BalWin delta offshore converter platform in the German North Sea. The jacket foundation, which weighs around 13,000 tonnes, will be delivered under a contract GE Vernova and McDermott International signed with the German transmission system operator (TSO) TenneT in 2023. Under […]

  • 8 August 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    Scanel Green Energy has been awarded a contract by CS Wind Offshore for the electrical outfitting of transition pieces for Vattenfall’s Nordlicht 1 offshore wind farm in the German North Sea. As part of the agreement, Scanel will be responsible for the entire electrical installation scope. CS Wind Offshore signed a contract with Vattenfall for […]

  • 14 August 2025
    Supply Chain, Training & Education

    Brazil’s Centre for Gas Technologies and Renewable Energies (CTGAS-ER), part of the country’s SENAI Institute for Innovation in Renewable Energy, and the UK-based Ocean Energy Pathway have launched the first joint training programme focused on offshore wind energy in Brazil. Later this month, SENAI will also launch a postgraduate course in offshore wind. The Basic […]

  • 8 August 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Five of the 76 planned Vestas V236-15.0 MW turbines have been installed at Baltic Power, the first Polish offshore wind farm, jointly developed by Orlen and Canada’s Northland Power. The installation of each turbine is preceded by the deployment of monopile foundations and transition pieces, a stage of the project that is now nearing its […]

  • 8 August 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    Japan’s Ministry of Economy, Trade and Industry (METI) and the Ministry of Land, Infrastructure, Transport, and Tourism (MLIT) have designated two areas off the southern coast of Hokkaido as promotion zones for the country’s upcoming offshore wind auctions. The areas, one off the coast of Matsumae and one off the coast of Hiyama, were designated […]

  • 11 August 2025
    Authorities, Business & Finance, Green Hydrogen, Planning & Permitting, Power-to-X, Project Updates, Wind Farm Update

    The completion date for Vattenfall and Copenhagen Infrastructure Partners’ offshore wind farm at the IJmuiden Ver Beta site in the Netherlands has been pushed from late 2029 to 2032 due to the delayed completion of the Delta Rhine Corridor (DRC). In addition, the 2 GW offshore wind project will now be built in two phases. […]

  • 27 August 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    The initial section of the first export cable for the Inch Cape offshore wind farm has left the Port of Blyth and is currently en route for installation off the coast of Scotland. The cable-lay vessel, CMOS Installer, has left the port with the 28-kilometre section of the 220 kV, three-phase export cable. Each of […]