10000 results found for 'first'

10000 results found for 'first'
Order results by

A list of search results

  • 24 March 2026
    Project Updates, Technology, Vessels

    Stillstrom has partnered with Faber Group and Prysmian to develop an offshore charging solution aimed at reducing emissions from vessels operating in the offshore wind sector. The first demonstration trial is scheduled for the fourth quarter of 2026 in Esbjerg. The companies will pilot a system that enables hybrid and electric service operation vessels (SOVs) […]

  • 24 February 2026
    Floating Wind, Project Updates, Wind Farm Update

    Renexia has deployed an AXYS FLiDAR WindSentinel in the Strait of Sicily, at the site of its proposed Med Wind floating wind farm, for a twelve-month measurement campaign. The metocean data will support the layout design of Med Wind and provide essential inputs for engineering structures, moorings, installation planning, and future maintenance activities, the developer […]

  • 18 February 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Supply Chain, Wind Farm Update

    DEME has awarded Hellenic Cables with a contract for the supply of inter-array cables for the 390 MW BC-Wind offshore wind project in Poland, developed by Ocean Winds. Under the contract, the Greece-based manufacturer will be responsible for the design, engineering, manufacturing, testing, and supply of approximately 70 kilometres, including spares, of 66 kV inter-array […]

  • 24 April 2026
    Business development, Innovation, Technology, Vessels

    Stillstrom, part of A.P. Moller – Maersk, has introduced two new standalone offshore charging solutions aimed at supporting vessel electrification in offshore wind operations. The new systems, Power Hub and Power Tower, are designed as monopile-based structures that can be deployed independently of wind turbine infrastructure. The solutions are intended to provide flexible offshore charging […]

  • 13 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    The slower-than-expected turbine commissioning at the Hai Long offshore wind farm in Taiwan could impact Northland Power’s pre-completion revenues by approximately CAD 150 million to CAD 200 million in 2026, the company announced in its third-quarter 2025 results. Over half of the turbines are now in place at the 1 GW Hai Long offshore wind […]

  • 25 March 2026
    Cables, Contracts & Tenders, Grid Connection, Offshore Platforms, Operations & Maintenance

    The UK energy regulator Ofgem has unveiled its shortlist of bidders under the Offshore Transmission Owner (OFTO) Tender Round 13, in which five companies and consortia will compete to own and operate the offshore electricity transmission links for the East Anglia Three, Inch Cape and Dogger Bank C offshore wind farms.   Ofgem said on 24 March that this was […]

  • 20 April 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    The Fraunhofer Institute for Wind Energy Systems (IWES) has completed a site condition monitoring campaign in Liivi Bay, Estonia, for the Liivi offshore wind farm project, commissioned by Enefit. The campaign, conducted from October 2024 to December 2025, involved the deployment of the Stage 3+ Wind LiDAR Buoy together with co-deployed oceanographic sensors to collect […]

  • 27 March 2026
    Business & Finance, Floating Wind, Ports & Logistics

    The UK government has announced up to GBP 64 million (approximately EUR 74 million) in funding to develop Port Talbot in South Wales into a major hub for floating offshore wind in the Celtic Sea. The investment, led by the Department for Energy Security and Net Zero (DESNZ), aims to establish the port as the […]

  • 3 March 2026
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    Ocean Winds has entered into an agreement for lease with the Crown Estate for a 1.5 GW floating offshore wind project, for which the developer secured a site in the Round 5 seabed auction last year. Offshore Wind Leasing Round 5, the UK’s first dedicated floating wind seabed leasing round, was launched in February 2024, offering three […]

  • 24 October 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The offshore substation topside for the East Anglia Three offshore wind farm has been installed, with commissioning work expected to start at the beginning of November. According to a weekly notice of operations issued by ScottishPower Renewables, which is building the 1.4 GW offshore wind farm, the semi-submersible crane vessel (SSCV) Sleipnir departed from the […]

  • 13 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    The German Federal Maritime and Hydrographic Agency (BSH) has confirmed the permit for Vattenfall’s Nordlicht 2 offshore wind farm. With the permit now irrevocable, the developer has taken the full final investment decision (FID) for the Nordlicht offshore wind cluster, comprising Nordlicht 1 and Nordlicht  2, with construction expected to start this year on the first […]

  • 12 February 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The US government will fight the federal court decisions to grant preliminary injunctions in cases challenging the stop-work orders for offshore wind projects under construction, issued on 22 December 2025. The injunctions allowed the construction to resume while the underlying lawsuits are underway. The US Secretary of the Interior, Doug Burgum, told Bloomberg Television the […]

  • 19 November 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Ørsted has completed the 2025 foundation installation campaign at the Sunrise Wind offshore project site in the US and is now commencing cable installation works on both its projects under construction in the Northeast US, Revolution Wind and Sunrise Wind. According to the latest Notice to Mariners from the developer, Bokalift 2 and Bokalift 1 […]

  • 25 February 2026
    Business & Finance, Equipment, Technology, Vessels

    Norway’s Kongsberg Maritime has been appointed to deliver an integrated technology package for what is said to be South Korea’s first specialised HVDC installation vessel, being built in Türkiye. South Korean subsea cable installation company LS Marine Solution signed a contract with Türkiye’s Tersan Shipyard for the construction of the ultra-large cable laying vessel (CLV) at […]

  • 7 January 2026
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Ørsted will submit a motion for a preliminary injunction against the recently imposed construction halt for its Sunrise Wind project in the US, the company said on 7 January, several days after announcing the same legal action in relation to Revolution Wind, which the developer is building through a joint venture with Skyborn Renewables. For Sunrise Wind, Ørsted […]

  • 19 December 2025
    Fixed-Bottom, Grid Connection, Onshore Infrastructure, Project Updates, Wind Farm Update

    Four transformers and other high-voltage power equipment necessary for power transfer to the Polish national grid have been delivered to the construction site of the onshore substation for the Baltica 2 offshore wind farm, being built by a joint venture of PGE and Ørsted in the Polish Baltic Sea. The onshore infrastructure for the offshore […]

  • 9 December 2025
    Business & Finance, Business development, Cables, Grid Connection, Innovation, Outlook & Strategy, Research & Development, Transition

    The European Investment Bank (EIB) has approved a EUR 300 million financing package for Prysmian that will support the Italian cabling giant’s research and development (R&D) activities with the ultimate goal of accelerating energy security and digitalization in Europe. The financing will support Prysmian’s European research and development activities for the 2025–2028 period, accelerating the […]

  • 18 December 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The 100 MW Hanlim Offshore Wind Power Project in South Korea has been commissioned, according to the news from the country’s Ministry of Climate, Energy and Environment (MCEE), which attended a completion ceremony on 15 December. The project is built in the waters off Suwon-ri, Hallim-eup, Jeju, and is currently the largest offshore wind farm […]

  • 7 November 2025
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    All monopile foundations for the wind turbines have been installed at Nordseecluster A, the first phase of the 1.6 GW Nordseecluster offshore wind development in Germany, owned by RWE and Norges Bank Investment Management. Each of the 44 monopile foundations measures approximately 85 metres in length and weighs an average of 1,500 tonnes. Before installation, […]

  • 29 October 2025
    Business & Finance, Floating Wind, Project Updates, Wind Farm Update

    IX Renewables has signed a cooperation agreement with Asia Cement Corporation (ACC) for the 180 MW Rui Li 1 floating offshore wind project in Taiwan. According to IX Renewables, this adds new momentum to a sector that has, until recently, been slowing, as the country works to advance its energy transition and net-zero ambitions. “This […]

  • 10 March 2026
    Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    RWE has placed a firm wind turbine order with Vestas for its 1,380 MW Vanguard East offshore wind project in the UK, shortly after confirming a firm order for Vanguard West, which will have the same installed capacity.  For Vanguard East, Vestas will supply, deliver, and commission 92 of its V236-15.0 MW wind turbines, and […]

  • 23 February 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    RWE has placed a firm order with Vestas for its 1,380 MW Norfolk Vanguard West offshore wind project in the UK, after the developer secured a Contract for Difference (CfD) for the project in Allocation Round 7 (AR7) in January and announced that the global investment firm KKR would become its partner on the two Norfolk […]

  • 29 October 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    Both offshore substations, the first ever in Polish waters of the Baltic Sea, have been installed at the 1.2 GW Baltic Power offshore wind farm, developed by a joint venture between ORLEN Group and Northland Power. OSS West and OSS East are located approximately 20 kilometres from the shore of Choczewo. They gather energy generated […]

  • 30 December 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    The output of the 495 MW Formosa 4 offshore wind farm in Taiwan has been fully subscribed, according to its developer Synera Renewable Energy (SRE) Group, which signed three corporate power purchase agreements (CPPAs) this month. “With this milestone, the ready-to-build Formosa 4 now calls for support from the government and local financial institutions to […]

  • 18 March 2026
    Industry

    The Global Wind Energy Council (GWEC) and the Japan Wind Power Association (JWPA) have signed a Memorandum of Understanding (MoU) to strengthen cooperation and accelerate offshore wind development in Japan. The agreement establishes a framework for collaboration between the two organisations, aimed at promoting knowledge exchange, enhancing industry and supply chain networks, and supporting the […]

  • 17 December 2025
    Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Star of the South, said to be Australia’s “most advanced offshore wind project”, has submitted its Environmental Impact Statement (EIS) for approval, the primary environmental approval required for the project to proceed. According to the developer, this comes off the back of a few other milestones the project recently achieved, one of which is the […]