3326 results found for 'Merkur'

3326 results found for 'Merkur'
Order results by

A list of search results

  • 23 December 2025
    Equipment, Fixed-Bottom, Foundations, Project Updates, Supply Chain, Technology, Wind Farm Update

    Van Oord, which recently started installing monopiles at the Ecowende offshore wind farm in the Netherlands, will soon deploy two pieces of equipment that allow monopiles to be installed using vibration technology and minimise noise disturbance for underwater life. The technology will be used during installation work at selected locations. Van Oord’s offshore installation vessel […]

  • 16 March 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    All wind turbines have been installed at the Vineyard Wind 1 offshore wind farm, according to US media and Oceantic Network, the country’s offshore renewable energy industry organisation. Located approximately 24 kilometres (15 miles) south of Nantucket, Massachusetts, the 806 MW project features 62 GE Vernova Haliade-X 13 MW wind turbines, each equipped with a […]

  • 26 January 2026
    Authorities, Fixed-Bottom, Floating Wind, Green Hydrogen, Grid Connection, Planning & Permitting, Power-to-X

    Energy ministers from nine North Sea countries signed the ‘Hamburg Declaration’ at the North Sea Summit in Hamburg on 26 January, agreeing to work towards up to 100 GW of cross-border offshore wind capacity in the North Seas by 2050, while also advancing offshore renewable hydrogen as part of a more integrated regional energy system. […]

  • 11 February 2026
    Fixed-Bottom, Grid Connection, Wind Farm Update

    Germany’s total offshore wind power generation in 2025 amounted to 26.1 TWh, of which 20.8 TWh came from the North Sea and 5.38 TWh from the Baltic Sea, according to TenneT Germany, the transmission system operator (TSO) in charge of the country’s North Sea grid. In this article: With onshore wind farms contributing 106.5 TWh […]

  • 13 April 2026
    Authorities, Business & Finance, Planning & Permitting

    The Polish government has introduced a new “local content” framework designed to increase the share of domestically generated value in large-scale investments, including energy projects, by modifying procurement practices and evaluation criteria. Speaking on 10 April, Prime Minister Donald Tusk stated that the government would strive to ensure that, wherever possible, Polish companies are prioritised […]

  • 3 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Dominion Energy said in its third-quarter 2025 results that recently imposed US tariffs have been incorporated into the updated cost estimate for the Coastal Virginia Offshore Wind (CVOW) project. The company now places total capital costs for the 2.6 GW offshore wind farm at approximately USD 11.2 billion (approximately EUR 9.7 billion), up from about […]

  • 24 April 2026
    Authorities, Industry, Market Outlooks, Outlook & Strategy, Planning & Permitting

    “The European offshore wind industry is gearing up to deliver”, WindEurope said on 23 April as energy ministers from the North Sea countries, together with the industry, transmission system operators (TSOs), and NATO, met in Madrid to discuss the next steps on implementing the Hamburg Declaration, signed in January. The European wind energy organisation also […]

  • 27 October 2025
    Business & Finance, Fixed-Bottom, Grid Connection, Offshore Platforms

    Following the termination of Petrofac’s scope of work on the 2 GW offshore grid connection programme in the Netherlands by the Dutch TSO TenneT, the UK engineering and consultancy provider has filed for administration. In an update on 27 October, Petrofac said the Directors of Petrofac Limited, the Group’s ultimate holding company, applied to the […]

  • 21 October 2025
    Authorities, Jobs & Recruitment

    The UK government has set out its first Clean Energy Jobs Plan, outlining how it intends to recruit and train workers to meet growing demand across the clean power sector, including thousands of new roles in offshore wind. The Department for Energy Security and Net Zero (DESNZ) said the clean energy workforce could rise from […]

  • 21 November 2025
    Innovation, Technology, Vessels

    As offshore wind expands into new frontiers, jack-up vessels face increasingly difficult working environments. Beyond the sandy soils of the North Sea, projects are now being built on dense tills, coral limestone, and even exposed bedrock. These hard seabeds are testing the limits of conventional jack-up design and installation practices — and calling for new […]

  • 31 October 2025
    Business development, Contribution, Foundations, Industry, Supply Chain

    IDESA’s Modernization Journey IDESA, based in Avilés, Spain, is well known in the heavy fabrication sector for its work in offshore energy and pressure vessels. Facing growing demand and increasingly complex projects, the company sought to modernize its production line. A central focus was the rolling stage, where inefficiencies had been limiting throughput and precision. […]

  • 1 January 2026
    Business & Finance, Supply Chain, Technology, Wind Turbines

    In offshoreWIND.biz‘s 2024 annual wind turbine overview, you could have read about the first 16 MW floating wind platform installed offshore and a 26 MW prototype under construction, both in China, and a 21 MW prototype being assembled in Europe. Wind turbine generator (WTG) technology did not stop progressing in 2025, with Chinese OEMs still leading capacity-wise, […]

  • 31 October 2025
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    The Dutch government has confirmed that no applications were submitted for the latest offshore wind tender for the 1 GW Nederwiek I-A site in the North Sea. The tender closed on 30 October without bids, the Netherlands Enterprise Agency (RVO) said in a press release issued the same day. In a letter to Parliament, Dutch […]

  • 7 October 2025
    Business & Finance, Contracts & Tenders, Project Updates, Supply Chain, Wind Farm Update

    Spain’s EOLOS Floating LiDAR Solutions has been awarded a contract to carry out in-situ measurement campaigns for ELWIND, the Estonian-Latvian offshore wind project. The measurement campaign for each site is divided into three phases: preparatory, execution, and data validation and reporting. The campaign aims to provide data on the metocean (meteorological and oceanographic) conditions for […]

  • 13 October 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Ignitis Renewables has signed a sale and purchase agreement with Ocean Winds to acquire full ownership of the Curonian Nord offshore wind project in Lithuania. Ignitis Renewables, an Ignitis Group subsidiary, plans to acquire 49 per cent of Ocean Winds’ shares at a nominal price in the company developing the 700 MW offshore wind project. […]

  • 16 October 2025
    Authorities, Planning & Permitting

    The tender for the 1 GW Nederwiek I-A offshore wind energy site, located in the North Sea, has been opened, with the winner expected to be announced in the spring of 2026. The wind farm will be located approximately 95 kilometres off the coast of the northernmost tip of the province of North Holland, in […]

  • 30 September 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    The joint venture between Ørsted and PGE has awarded Acteon’s geo-services business line, UTEC, a structural monitoring contract for the Baltica 2 offshore wind farm, which the joint venture is building in Poland. Under the contract, Acteon is responsible for the design, engineering, procurement, installation and commissioning of measurement and associated data acquisition systems for […]

  • 6 October 2025
    Authorities, Planning & Permitting

    The Brazilian government has taken the next step towards realising its plan to establish a regulatory framework that will facilitate planning and permitting offshore wind projects, as the country’s National Energy Policy Council (CNPE) approved a resolution to form an Offshore Wind Working Group (GT-EO). The Offshore Wind Working Group, to be coordinated by the […]

  • 9 October 2025
    Business & Finance, Jobs & Recruitment

    Ørsted will lay off around 500 people by the end of this year and a total of approximately 2,000 towards the end of 2027. Of the 500 employees who will be made redundant in Q4 2025, some 235 are in Denmark. The company said on 9 October that the move to reduce the number of […]

  • 29 September 2025
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    More than half of the total 100 wind turbines are now in place at RWE’s Sofia offshore wind farm site in the UK. The project’s SG 14-222 DD wind turbines are being installed by Cadeler’s vessel Wind Peak, which put the first turbine in place in March. Wind Peak, operating from the port of Hull, is carrying components […]

  • 9 October 2025
    Authorities, Business & Finance, Floating Wind, Planning & Permitting, Ports & Logistics

    The California Energy Commission (CEC) has awarded USD 20 million (approximately EUR 17 million) to the Port of Long Beach to fund the ongoing development of Pier Wind, a proposed USD 4.7 billion (approx. EUR 4 billion) terminal that would serve the floating wind industry. CEC has awarded the grant through the Offshore Wind Energy […]

  • 23 September 2025
    Project Updates, Wind Farm Update

    Iberdrola has launched floating LiDAR and metocean measuring equipment at its Aurora Green offshore wind project site, located within the Gippsland offshore wind area in Australia. The equipment will collect data on wind, waves, currents, and other atmospheric and oceanographic parameters for 12-24 months. The measurement campaign will inform project development and design, allowing Iberdrola […]

  • 1 October 2025
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Vessels, Wind Farm Update

    The first monopile has been installed at the Windanker offshore wind project site in the German Baltic Sea, marking the start of construction on Iberdrola’s third large-scale offshore wind project in the region, the company said via social media on 1 October. The monopiles are being installed by Van Oord using its heavy-lift installation vessel […]

  • 7 October 2025
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    The two developers that the Crown Estate selected this year to build floating offshore wind farms in the Celtic Sea, Equinor and a joint venture between EDF and ESB, have now entered into lease agreements for their floating wind projects with the UK seabed manager. Equinor and the EDF-ESB joint venture, named Gwynt Glas, were […]

  • 1 October 2025
    Business & Finance, Business development, Operations & Maintenance, Vessels

    Vard has delivered the first commissioning service operation vessel (CSOV) to Windward Offshore, Windward Athens, which marks the German company’s entry into the offshore wind operations & maintenance (O&M) market. Windward Offshore has three more CSOVs under construction at Vard. Built by Vard in Norway and delivered on schedule at Vard Brattvaag, the vessel is […]

  • 30 September 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    Eiffage, through Smulders, has been awarded a contract by the French transmission system operator (TSO) RTE to develop and build three substations for the Bretagne Sud, Narbonnaise Sud-Hérault, and Golfe de Fos French offshore wind farms. Overall, the engineering, procurement, construction, installation, and commissioning contract is worth more than EUR 1.5 billion. The contract covers […]