3306 results found for 'Merkur'

3306 results found for 'Merkur'
Order results by

A list of search results

  • 3 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Dominion Energy said in its third-quarter 2025 results that recently imposed US tariffs have been incorporated into the updated cost estimate for the Coastal Virginia Offshore Wind (CVOW) project. The company now places total capital costs for the 2.6 GW offshore wind farm at approximately USD 11.2 billion (approximately EUR 9.7 billion), up from about […]

  • 7 October 2025
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    The two developers that the Crown Estate selected this year to build floating offshore wind farms in the Celtic Sea, Equinor and a joint venture between EDF and ESB, have now entered into lease agreements for their floating wind projects with the UK seabed manager. Equinor and the EDF-ESB joint venture, named Gwynt Glas, were […]

  • 31 October 2025
    Business development, Contribution, Foundations, Industry, Supply Chain

    IDESA’s Modernization Journey IDESA, based in Avilés, Spain, is well known in the heavy fabrication sector for its work in offshore energy and pressure vessels. Facing growing demand and increasingly complex projects, the company sought to modernize its production line. A central focus was the rolling stage, where inefficiencies had been limiting throughput and precision. […]

  • 16 March 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    All wind turbines have been installed at the Vineyard Wind 1 offshore wind farm, according to US media and Oceantic Network, the country’s offshore renewable energy industry organisation. Located approximately 24 kilometres (15 miles) south of Nantucket, Massachusetts, the 806 MW project features 62 GE Vernova Haliade-X 13 MW wind turbines, each equipped with a […]

  • 9 October 2025
    Authorities, Business & Finance, Floating Wind, Planning & Permitting, Ports & Logistics

    The California Energy Commission (CEC) has awarded USD 20 million (approximately EUR 17 million) to the Port of Long Beach to fund the ongoing development of Pier Wind, a proposed USD 4.7 billion (approx. EUR 4 billion) terminal that would serve the floating wind industry. CEC has awarded the grant through the Offshore Wind Energy […]

  • 31 October 2025
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    The Dutch government has confirmed that no applications were submitted for the latest offshore wind tender for the 1 GW Nederwiek I-A site in the North Sea. The tender closed on 30 October without bids, the Netherlands Enterprise Agency (RVO) said in a press release issued the same day. In a letter to Parliament, Dutch […]

  • 26 January 2026
    Authorities, Fixed-Bottom, Floating Wind, Green Hydrogen, Grid Connection, Planning & Permitting, Power-to-X

    Energy ministers from nine North Sea countries signed the ‘Hamburg Declaration’ at the North Sea Summit in Hamburg on 26 January, agreeing to work towards up to 100 GW of cross-border offshore wind capacity in the North Seas by 2050, while also advancing offshore renewable hydrogen as part of a more integrated regional energy system. […]

  • 15 September 2025
    Authorities, Planning & Permitting, Ports & Logistics

    The California Legislature has allocated USD 225.7 million in the current budget bill to upgrade port infrastructure to support the development of offshore wind off the state’s coast. The legislature voted to approve Proposition 4 funding for offshore wind port development in the SB 105 budget bill. “Oceantic commends Governor Newsom, the California Legislature, and […]

  • 11 February 2026
    Fixed-Bottom, Grid Connection, Wind Farm Update

    Germany’s total offshore wind power generation in 2025 amounted to 26.1 TWh, of which 20.8 TWh came from the North Sea and 5.38 TWh from the Baltic Sea, according to TenneT Germany, the transmission system operator (TSO) in charge of the country’s North Sea grid. In this article: With onshore wind farms contributing 106.5 TWh […]

  • 10 September 2025
    Floating Wind, R&D, Technology

    US-based Ocergy has been selected by Kyuden Mirai Energy Corporation as the floater provider for an offshore wind observation project being implemented under Japan’s New Energy and Industrial Technology Development Organization (NEDO) programme. The floating wind project is being developed by Kyuden Mirai Energy, Kobe University, Rera Tech, and Cosmo Eco Power. Ocergy’s OCG-data floating platform […]

  • 9 September 2025
    Authorities, Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    Cerulean Winds has submitted offshore consent applications to the Scottish Government for its 1 GW Aspen project, one of three floating offshore wind farms the company is developing in the Central North Sea. Lodged with the Scottish government’s Marine Directorate Licensing Operations Team, the applications are a key statutory milestone in securing offshore consent for […]

  • 10 September 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The first wind turbine foundation has been installed at the 496 MW Dieppe Le Tréport offshore wind farm in France, developed by Eoliennes en Mer Dieppe Le Tréport (EMDT), a joint venture between Ocean Winds, Sumitomo Corporation, and Banque des Territoires. The foundations are steel jackets fabricated in Spain, being delivered by a consortium of […]

  • 21 November 2025
    Innovation, Technology, Vessels

    As offshore wind expands into new frontiers, jack-up vessels face increasingly difficult working environments. Beyond the sandy soils of the North Sea, projects are now being built on dense tills, coral limestone, and even exposed bedrock. These hard seabeds are testing the limits of conventional jack-up design and installation practices — and calling for new […]

  • 29 September 2025
    Business development, Collaboration, Equipment, Foundations, Industry, Outlook & Strategy, Technology

    In the fast-moving world of wind energy manufacturing, innovation isn’t optional — it’s essential. For years, HAIZEA GROUP has been at the forefront of change, consistently pushing boundaries to stay ahead of market demands. As global demand for offshore wind power skyrocketed, Haizea made a bold move: expanding its production portfolio beyond onshore and offshore […]

  • 3 September 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    China’s CNOOD-Wenchong Heavy Industries (CWHI) has sent off the first 8 XXL monopiles for the 1.1 GW Inch Cape offshore wind farm off the east coast of Scotland. Manufactured at CWHI’s Qinzhou yard, the monopiles were shipped on 31 August aboard the COSCO vessel XIAN TAI KOU. The shipment is en route to Forth Ports […]

  • 1 January 2026
    Business & Finance, Supply Chain, Technology, Wind Turbines

    In offshoreWIND.biz‘s 2024 annual wind turbine overview, you could have read about the first 16 MW floating wind platform installed offshore and a 26 MW prototype under construction, both in China, and a 21 MW prototype being assembled in Europe. Wind turbine generator (WTG) technology did not stop progressing in 2025, with Chinese OEMs still leading capacity-wise, […]

  • 3 September 2025
    R&D, Technology

    Dongfang Electric Corporation has completed the installation of a 26 MW offshore wind turbine, which the Chinese company claims is the world’s largest in terms of single-unit capacity and rotor diameter. The offshore wind turbine was installed at the Wind Power Equipment Testing and Certification Innovation Base in Dongying, Shandong province, China. The unit features […]

  • 28 August 2025
    Business development, Equipment, Industry, Innovation, Project Updates, Research & Development, Technology

    We are pleased to share a milestone in the important collaboration between Davi and GS Entec in the wind energy sector: the successful completion of the Factory Acceptance Tests (FAT) for the two massive plate rolling machines ordered by the Korean company. The FAT took place a few weeks ago at our facilities and was […]

  • 2 September 2025
    Business & Finance, Business development, Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif Group, is facing a delay in the ramp-up of production at its new monopile production facility at Maasvlakte 2 in Rotterdam and expects to achieve this in the first half of 2026, instead of this year. Also in this article: In its half-year results for 2025, the company reported a […]

  • 7 August 2025
    Authorities, Planning & Permitting

    The UK government has launched this year’s Contracts for Difference (CfD) Allocation Round 7 (AR7), with the application window open until 27 August. The CfD and its predecessor investment contracts have already delivered 10 GW of renewable capacity, with a further 23 GW contracted to become operational by 2030. AR7 will run to one of […]

  • 8 August 2025
    Project Updates, Vessels

    DEME’s new wind turbine installation vessel (WTIV) Norse Wind has completed a full-height jacking test at Yantai CIMC Raffles Offshore’s shipyard as part of the vessel’s commissioning phase, before it is delivered to DEME in the fourth quarter of this year. During the test, the vessel’s legs were extended to their full length of 124 […]

  • 24 July 2025
    Business & Finance, Fixed-Bottom, Floating Wind

    Subsea7 and Saipem have signed a binding merger agreement, kicking off the process of combining the two companies, which is expected to be completed in the second half of 2026 and result in a new offshore energy player named Saipem7. The companies revealed plans to merge in February this year, when they signed a memorandum […]

  • 5 August 2025
    Business development, R&D, Research & Development, Supply Chain, Technology, Wind Turbines

    The ultra-long blades for what will be the world’s most powerful offshore wind turbine have been shipped from Yantai Port in China’s northeastern Shandong province and are en route to a test base. Three blades, each measuring 153 metres long and weighing 83.5 tonnes, were loaded at the Port of Yantai on 1 August. The […]

  • 11 August 2025
    Authorities, Business & Finance, Green Hydrogen, Planning & Permitting, Power-to-X, Project Updates, Wind Farm Update

    The completion date for Vattenfall and Copenhagen Infrastructure Partners’ offshore wind farm at the IJmuiden Ver Beta site in the Netherlands has been pushed from late 2029 to 2032 due to the delayed completion of the Delta Rhine Corridor (DRC). In addition, the 2 GW offshore wind project will now be built in two phases. […]

  • 6 August 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    The European Commission has approved an EUR 11 billion French scheme to support the construction and operation of three floating offshore wind farms with a total generating capacity of 1.5 GW. The 20-year scheme was approved under the Clean Industrial Deal State Aid Framework (CISAF) and is said to contribute to France meeting its 2030 […]

  • 30 July 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Geotechnical surveys have commenced for the Lillebælt Syd offshore wind farm in Denmark, owned by TotalEnergies, European Energy, and Danish utility company SONFOR. In the coming months, a jack-up will conduct test drilling for the eleven turbine locations at the Lillebælt Syd wind farm site. The purpose of these surveys is to obtain detailed knowledge […]