Search results for: Haliade-X 12MW

149 results

A list of search results

  • 29 May 2024
    Authorities, Business & Finance, Planning & Permitting

    Danish renewable energy developer Ørsted will pay New Jersey USD 125 million (approximately EUR 115 million) to settle claims over the company’s cancellation of two offshore wind farm projects, Ocean Wind 1 and Ocean Wind 2, last year. The state’s Board of Public Utilities (BPU) said the USD 125 million it will receive will be […]

  • 2 January 2024
    Fixed-Bottom, Floating Wind, Market Outlooks, Supply Chain, Wind Turbines

    The biggest wind turbines also make for some of the biggest news on offshoreWIND.biz. In 2023, wind turbine OEMs continued making headlines with their models in development and on the path to commercialisation, and by announcing brand new wind turbine generators (WTGs) that further raise the bar in generation capacity and size. Here, we are […]

  • 1 November 2023
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Danish renewable energy developer Ørsted has decided to cease the development of the Ocean Wind 1 and Ocean Wind 2 offshore wind projects in New Jersey. In addition, the company, together with Eversource, has taken a final investment decision (FID) on the 704 MW Revolution Wind, Rhode Island and Connecticut’s first utility-scale offshore wind farm. […]

  • 21 September 2023
    Contracts & Tenders, Equipment, Foundations, Jobs & Recruitment, Manufacturing, Supply Chain, Wind Turbines

    Riggs Distler, a subsidiary of infrastructure company Centuri Group, has been selected as a tier 1 secondary steel contractor for 1.1 GW Ocean Wind 1, New Jersey’s first offshore wind project. Riggs Distler will provide onshore heavy civil, mechanical, and electrical services focused on the construction, assembly, inspection, and onshore installation of advanced foundation components. […]

  • 12 November 2019
    Technology

    GE Renewable Energy has posted a video showing the installation time-lapse of the Haliade-X 12MW wind turbine at Maasvlakte, the Port of Rotterdam. This content is available after accepting the cookies. Change cookie-settings View on Youtube. The GE Haliade-X 12MW prototype wind turbine produced its first power at the beginning of November. It features three […]

  • 14 October 2019
    Technology

    The first blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, according to the live webcam feed at the Port of Rotterdam. LM Wind Power is producing the 107m blades, the world’s largest, at its plant in Cherbourgh, France. The first piece was rolled out in June. To remind, GE Renewable Energy announced in March last year that […]

  • 13 August 2019
    Technology

    GE Renewable Energy has sent off the nacelle of the Haliade-X 12MW offshore wind turbine from its production site in Saint-Nazaire, France, to Rotterdam, the Netherlands. The Haliade-X 12MW components will be assembled in Rotterdam-Maasvlakte, after which the turbine will be installed onshore to facilitate access for testing during the initial period of operations. This initial phase is expected […]

  • 13 November 2019
    Technology

    GE Renewable Energy has signed a cooperation agreement with State Power Investment Corp (SPIC) to bring the Haliade-X 12MW offshore wind turbine to China. GE announced in March last year that it will invest more than USD 400 million to develop and deploy Haliade-X 12MW, the world’s most powerful offshore wind turbine. The first unit was installed […]

  • 26 April 2019
    Business & Finance

    GE Renewable Energy is holding a series of supply chain engagement events in the UK for its Haliade-X 12MW offshore wind turbine. The events are part of GE’s supply chain plan for the world’s most powerful offshore wind turbine and will welcome potential suppliers that have suitable products or services that could support its production. GE […]

  • 16 October 2019
    Technology

    The third and final 107m blade has arrived in the Port of Rotterdam and is awaiting to be installed on the prototype GE Haliade-X 12MW offshore wind turbine. To remind, the first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day […]

  • 5 June 2018
    R&D, Technology

    A full prototype Haliade-X 12 MW wind turbine will be installed at a yet-to-be-determined site in 2019, GE Renewable Energy said.

  • 17 October 2019
    Technology

    The third and final 107m blade has been installed on the prototype GE Haliade-X 12MW offshore wind turbine in Maasvlakte, the Port of Rotterdam. The first blade was installed on the Haliade-X 12MW turbine located at Sif’s Maasvlakte 2 terminal on 14 October, with the second piece following the day later. LM Wind Power manufactured the 107m blades, the world’s largest, at its […]

  • 18 June 2020
    Technology

    GE’s Haliade-X 12 MW offshore wind turbine prototype has obtained a provisional type certificate by DNV GL. According to GE, this certification demonstrates that the Haliade-X prototype has the highest safety and quality standards. The company expects the full type certificate in the coming months. “This is a very important milestone for us as it confirms […]

  • 15 August 2019
    Technology

    The first LM 107.0 P blade for GE’s Haliade-X 12MW turbine has arrived at Offshore Renewable Energy (ORE) Catapult’s testing site in Blyth, the UK. Over the coming months, the blade will undergo advanced testing procedures, with static and fatigue tests to demonstrate its ability to withstand peak wind conditions and simulate its readiness for […]

  • 18 April 2019
    R&D

    LM Wind Power has produced the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to LM Wind Power, the 107m long blade, the world’s largest, has completed the molding process. The LM 107.0 P will now proceed with post-molding finishing touches, before undergoing testing and validation to demonstrate its ability […]

  • 3 July 2019
    R&D, Technology

    GE Renewable Energy has installed three out of four tower sections which will support the prototype Haliade-X 12 MW wind turbine at Maasvlakte in the Port of Rotterdam, the Netherlands. The final tower section will be installed once the nacelle arrives at Maasvlakte during the summer, GE Renewable Energy said. The Haliade-X 12 MW nacelle […]

  • 14 August 2019
    Business & Finance

    LM Wind Power has sent off the first 107m long blade for GE’s Haliade-X 12MW turbine from its factory in Cherbourg, France, to the UK where it will undergo testing. The LM 107.0 P blade, the world’s largest, was loaded onto a vessel on 13 August in the Cherbourg harbor and began its journey to the […]

  • 12 April 2019
    Ports & Logistics

    GE Renewable Energy is currently preparing the site in Maasvlakte, the Netherlands, for installation of its Haliade-X 12MW wind turbine prototype. Preparations of the site which will host the world’s most powerful offshore wind turbine are being carried out in partnership with Future Wind. The two companies signed an agreement at the beginning of the year […]

  • 16 May 2019
    Business & Finance, Technology

    Vattenfall and GE Renewable Energy plan to join forces in the deployment of GE’s new wind turbine, the Haliade-X 12 MW, in Europe. With a capacity of 12MW, the Haliade-X is the largest offshore wind turbine on the market to date. Development and production of the new 12MW turbine will mostly take place in France. […]

  • 1 March 2018
    Business & Finance, R&D, Technology

    GE Renewable Energy GE will invest more than USD 400 million over the next three to five years to develop and deploy the largest, most powerful offshore wind turbine – the Haliade-X 12 MW.

  • 17 July 2019
    Grid Connection, Technology

    Visser & Smit Hanab has completed the cable connection which will link the prototype Haliade-X 12 MW wind turbine at Maasvlakte 2 in the Port of Rotterdam to the Stedin high-voltage station. The 1.5-kilometre, 66kV connection was tested on 16 and 17 July, after which it was put into operation, Visser & Smit Hanab said. GE Renewable […]

  • 21 June 2019
    Ports & Logistics

    LM Wind Power has rolled out the first blade for GE’s Haliade-X 12MW offshore wind turbine at its factory in Cherbourg, France. According to the company, the 107m long blade, the world’s largest, has made its first trip outside the factory. Final preparations for the shipment of the LM 107.0 P blade to Maasvlakte-Rotterdam in the Netherlands are now […]

  • 22 July 2019
    Technology

    GE Renewable Energy has revealed the first nacelle of the Haliade-X 12 MW offshore wind turbine at its production site in Saint-Nazaire, France. The nacelle will be shipped from Saint-Nazaire to Rotterdam-Maasvlakte in the Netherlands over the coming weeks, where its components will be assembled into the Haliade-X 12 MW prototype to be tested there. […]

  • 11 June 2019
    Ports & Logistics, Technology

    Spanish turbine tower manufacturer GRI has shipped out the four tower sections that will be part of GE’s Haliade-X 12 MW prototype to be installed later this summer in Maasvlakte-Rotterdam. The four segments at GRI’s site in Seville will be arriving in the Netherlands before the end of the month, GE Renewable Energy said. Upon arrival […]

  • 17 December 2019
    Business & Finance

    Dutch energy company Eneco is set to purchase all the electricity generated by GE’s Haliade-X 12MW offshore wind turbine prototype. This was announced during the inauguration ceremony for the prototype held today, 17 December, at the port of Maasvlakte-Rotterdam. According to GE, the Haliade-X 12MW prototype set a new world record the past weekend by […]

  • 20 June 2019
    Ports & Logistics, R&D, Technology

    The four tower sections that will be part of GE’s Haliade-X 12 MW wind turbine prototype have arrived in Rotterdam. The four segments left GRI’s site in Seville, Spain, earlier this month. After unloading the tower segments, a series of pre-assembly works will take place, including the installation of some tower segments, GE Renewable Energy said. The […]