Search results for: DolWin3

338 results

A list of search results

  • 10 December 2013

    DolWin Beta’s topside was placed onto the substructure yesterday. The jacking up of DolWin Beta’s topsides started on December 5. Drydocks World lifted the 10,000-tonne topside of the platform structure to a height of 52.8 metres from the dock bottom. On Saturday, the substructure was moved in position under the topside. Aibel is designing and […]

  • 7 March 2023
    Authorities, Grid Connection

    After filing the documents for the public planning procedure for the section of the BorWin4 offshore grid connection that lies in the Exclusive Economic Zone (EEZ) in 2021, German transmission system operator Amprion has now announced that the approval process at the Federal Maritime and Hydrographic Agency (BSH) has started. In the spring of 2021, Amprion […]

  • 17 November 2014
    Business & Finance

    Offshore WIND’s photo of the day: Aibel employees doing their job on the DolWin beta converter station.  “Small people, great effort,” says Aibel AS in a description of the photo that shows work on the DolWin beta offshore converter station outside the company’s yard in Haugesund, Norway. With a capacity of more than 900 MW, the converter station will host […]

  • 5 December 2013

    On Thursday 5 December, the jacking up of Dolwin Beta’s topsides started. The topsides weighs 10,000 tons. It will be jacked up more than 50 meters to be fitter on the substructure by six gigantic jacking towers Drydocks commenced the construction of the June last year. The platform will be ready for sailaway from Dubai […]

  • 19 July 2022
    Grid Connection

    German transmission system operator Amprion has started construction work on the DolWin4 and BorWin4 offshore grid connection systems with a groundbreaking ceremony on Norderney Island’s North Beach. The drilling to cross below the island of Norderney marks the start of construction work for Amprion’s first offshore projects, which are scheduled to go into operation in […]

  • 23 November 2022
    Business & Finance, Vessels

    Italian cabling giant Prysmian Group is investing approximately EUR 200 million in a new cable-laying vessel which will be equipped with a battery pack for a total power of 3 MW. The new 170-metre-long vessel will be built by the VARD Group, a subsidiary of the Fincantieri Group, just like Leonardo da Vinci which was […]

  • 23 April 2012
    Grid Connection

    ABB, the leading power and automation technology group, has won a significant order from the Dutch-German transmission grid operator TenneT to supply an AC (alternating current) power transmission link connecting Nordergründe, an offshore North Sea wind farm, to the mainland grid in Germany. The order was booked in the first quarter. The link has a […]

  • 18 May 2016
    Grid Connection

    PFISTERER, an energy transmission and distribution specialist, has started the onshore work for equipping the DolWin gamma converter station.  The 900MW DolWin gamma converter platform is currently being constructed as the third link within the DolWin wind farm cluster. PFISTERER is in charge of laying all high-voltage and medium-voltage cables, both within the platform and over the […]

  • 22 July 2022
    Contracts & Tenders, Grid Connection

    Amprion Offshore GmbH has now commissioned Siemens Energy to supply the converter platforms for the DolWin4 and BorWin4 offshore grid connection systems. DolWin4 and BorWin4 will transport up to 1.8 GW of power from several wind farms in the German North Sea to land with low losses. The order value is in the high three-digit […]

  • 8 June 2021
    Business & Finance, Contracts & Tenders, Grid Connection

    London-based consultancy AqualisBraemar LOC has secured a contract to provide marine warranty services for the export cable installation of the DolWin5 offshore grid connection project in Germany. The scope of work covers all marine transportation and installation operations relating to the laying of export cables, as well as the suitability surveys of all construction and support […]

  • 28 June 2018
    Contracts & Tenders, Grid Connection, Operations & Maintenance

    A consortium of SeaRenergy and N-Sea has won a contract by TenneT for modification works to the jacket foundation of the HVDC platform DolWin alpha.

  • 4 December 2012
    Grid Connection

    Recently, Norddeutsche Seekabelwerke GmbH (NSW) was awarded an order by TenneT TSO GmbH (TenneT), a German-based transmission network operator, to supply and install 2 x 8.5 kilometers of 155 kV AC submarine transmission cable system. The cable will provide the connection of the transformer platform of the future offshore wind park Gode Wind I to […]

  • 3 February 2015
    Grid Connection

    Nordic Yards held a dock laying ceremony of a steel element of the offshore converter platform DolWin gamma in Warnemünde on 30 January. The placing of a 200-tonne section marked another milestone in the production of the 900 MW HVDC platform. “With today´s dock-laying, we are happy to have completed one further important step in the construction […]

  • 11 June 2014
    Grid Connection, Technology

    Representatives of TenneT, Mitsubishi, ABB, Aibel and Dubai Dry Docks were present at a ceremony organized on the occasion of DolWin beta’s departure from Drydocks World. “DolWin beta is the first wind platform we have designed and built. Now that the giant is leaving its construction site, it is a milestone for Aibel,” says CEO Jan […]

  • 26 October 2022
    Contracts & Tenders, Grid Connection

    SeaRenergy has been awarded a contract by Siemens Energy to provide integrated onshore and offshore logistics services during the commissioning of DolWin6 converter platform in the German Bight. The contract consists of various packages. Besides marine coordination and management of all personnel transfers, SeaRenergy is responsible for the onshore logistics and warehousing in Emden using […]

  • 23 April 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Tekmar Energy has secured a contract by cable manufacturer ZTT to supply its cable protection system (CPS) for the Gode Wind 3 high-voltage grid connection in Germany. The 16 km long submarine cable is scheduled for installation in 2023 and will connect the 242 MW Gode Wind 3 offshore wind farm to TenneT’s extra-high-voltage grid […]

  • 29 November 2011

    DolWin beta is a transformer station operated by TenneT, one of Europe’s largest grid operators. DolWin beta will be built as part of a large offshore wind farm cluster in the German sector, approximately 45 km off the German coast in the North Sea. It will receive alternating current from wind farms and convert it […]

  • 5 March 2020
    Grid Connection, Technology

    ABB has won a EUR 10.6 million order for ABB Ability™ digital products and services at TenneT’ DolWin5 (Epsilon) grid connection in the German North Sea. Under the order, ABB will provide a system for IT infrastructure, OT1 security, plant-wide condition monitoring, SCADA2, and remote access services to facilitate stable power transmission to the German […]

  • 9 May 2018
    Grid Connection, Ports & Logistics

    Heerema Fabrication Group (HFG) has shipped out the jacket foundation for TenneT’s 900MW BorWin3 HVDC platform.

  • 3 August 2015
    Grid Connection

    The DolWin beta converter platform left Aibel’s yard in Haugesund, Norway on the night of August 1. Following a four-day transport stage, the platform will be installed in the DolWin wind cluster in the German North Sea. The platform concept is based on experience from the oil and gas sector, and has been developed and […]

  • 13 September 2012
    Grid Connection, Wind Farm Update

    The on-schedule connection with the grid for the offshore wind park ‘Deutsche Bucht’ is now a good deal closer. At the hearing with the Federal Network Agency yesterday, it became clear in intensive negotiations over several hours that both sides – the wind park builder Windreich AG and the network operator TenneT – have a […]

  • 23 October 2013
    Business & Finance, Grid Connection

    Electricity transmission system operator, Tennet, has secured EUR 500 million from the European Investment Bank to fund offshore grid connections in the North Sea. Tennet will construct and maintain three separate offshore grid connections, HelWin1, SylWin1 and DolWin1, to the German Electricity Grid. „By developing offshore grid connections and linking wind farms to the German […]

  • 16 February 2015
    Business & Finance, Grid Connection, R&D, Wind Farm Update

    DC Netz BorWin3 GmbH has awarded a contract to N-Sea Offshore Wind BV to undertake unexploded ordnance (UXO) surveys at BorWin3 site.  Specifically, the work covers surveying of the seabed to help the identification and removal of undiscovered ordnance along the cable route of BorWin3. The planned BorWin3 submarine cable connection is a DC power transmission link with a […]

  • 22 June 2016
    Grid Connection, Operations & Maintenance

    During the test phase of the DolWin2 offshore grid connection, a cable component had failed repeatedly and TenneT decided to power off the system and has asked ABB to address the issue.  The companies will now investigate whether an individual case or a systemic material error is in question, and then ABB will remove the cause of […]

  • 1 September 2013

    VIDEO: DolWin Alpha Installation  The DolWin alpha converter platform has been installed in the North Sea. Siemens Successfully Installs HelWin1 Platform (Germany)   Siemens has installed the HelWin1 offshore platform in the North Sea, marking the successful completion of a significant stage in German grid connection projects. UK: Samsung’s 7MW Offshore Wind Turbine Reaches NAREC’s […]

  • 22 August 2017
    Business & Finance

    Inocean AS has acquired all of the outstanding shares in ABB Inocean AB and has renamed the company Inocean AB.