181 results found for 'V236-15.0 MW'

181 results found for 'V236-15.0 MW'
Order results by

A list of search results

  • 13 October 2022
    Contracts & Tenders, R&D, Technology

    Vestas has announced plans to establish a new factory in Szczecin, Poland, which will assemble components for the company’s flagship offshore wind turbine, the V236-15.0 MW model. The factory will produce nacelles and hubs for Vestas’ flagship unit which was introduced by the firm in February last year. Vestas said that the new factory will […]

  • 3 July 2023
    Business development, Research & Development

    Fraunhofer Institute for Wind Energy Systems (Fraunhofer IWES) has launched a new test rig that enables testing wind turbine blades longer than 115 metres. Vestas, whose latest wind turbine model features 115.5-metre blades, will use the rig to perform the trials needed before starting serial production. “The development of our new wind turbines is an important […]

  • 26 September 2022
    Contracts & Tenders, Wind Farm Update

    PKN Orlen and Northland Power have chosen to utilise Vestas 15 MW wind turbines on the 1.2 GW offshore wind farm the Polish-Canadian joint venture will build in Poland’s sector of the Baltic Sea. Vestas, which has been selected as the preferred supplier, will provide 76 of its V236-15.0 MW turbines for the Baltic Power […]

  • 14 August 2023
    Business development, Technology

    The Vestas V236-15.0 MW™ prototype offshore wind turbine has set a world record for the most power output by a single wind turbine in a 24-hour period, producing 363 megawatt-hours in that time span, the Danish wind turbine manufacturer said. The prototype was installed at the Østerild National test centre for large wind turbines in […]

  • 19 December 2022
    R&D, Technology

    The 115.5 m blade for Vestas’ V236-15.0 MW™ wind turbine is currently being tested at Blaest’s blade test facility in Aalborg, Denmark. Before going into commercial production, the new V236-15.0 MW™ wind turbine will undergo comprehensive test campaigns which are a mandatory part of the type certification process. One of the tests to be performed […]

  • 18 March 2022
    Contracts & Tenders, R&D, Technology

    The Danish wind turbine manufacturer Vestas will test the rotor blade of the new V236-15.0 MW™ offshore wind turbine prototype at the Fraunhofer Institute for Wind Energy Systems IWES in Bremerhaven, Germany later this year. Following the successful conclusion of the contract, Vestas will be the first client to use Fraunhofer IWES’ new rotor blade […]

  • 11 August 2023
    Contracts & Tenders, Wind Farm Update

    Denmark-headquartered Vestas has signed a conditional agreement with PKN Orlen and Northland Power to deliver wind turbines for the 1.2 GW Baltic Power offshore wind farm in Poland. If and when the agreement translates into a firm and unconditional order, Vestas will disclose this in a company announcement in accordance with the company’s disclosure policy, […]

  • 17 May 2024
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain, Wind Turbines

    Vestas has signed a conditional agreement for the supply of wind turbines for a large-scale offshore wind project in Europe. The company did not disclose the name of the client or the project. In an update on 17 May, the Danish wind turbine manufacturer said that the offshore wind project was located in Northern Europe […]

  • 2 October 2023
    Contracts & Tenders, Fixed-Bottom, Operations & Maintenance, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Vestas has secured a firm order to deliver 64 V236-15.0 MW wind turbines for the 960 MW He Dreiht offshore wind farm in the German North Sea. Vestas will also deliver a five-year Active Output Management 5000 (AOM 5000) service agreement followed by a long-term Operational Support Agreement. ”We are delighted to announce this firm […]

  • 28 October 2022
    Technology

    Vestas has manufactured and rolled out the first 115.5-metre blade built for the V236-15.0 MW™ offshore wind turbine prototype. The blade was manufactured in Vestas’ production facility in Nakskov, Denmark, using the mould which was built at the factory in Lem, Denmark. The design of the blade has required an extension and retooling of the […]

  • 29 November 2022
    Contracts & Tenders, Wind Farm Update

    MunmuBaram, a joint venture between Shell and Hexicon AB, has named Vestas as the preferred turbine supplier for the 1.3 GW MunmuBaram floating offshore wind project in South Korea. If the project materialises, Vestas will supply and install 84 units of the V236-15.0 MW turbine for the project located off the south-east coast of South […]

  • 11 January 2024
    Infrastructure, Manufacturing, Supply Chain

    Vestas has revealed plans to establish a new blade factory in Szczecin, Poland, where the company aims to produce blades for its flagship offshore wind turbine, the V236-15.0 MW. The new offshore blade factory is planned to be located at a site in northern Szczecin, which Vestas acquired in February 2023. The factory is expected […]

  • 2 August 2023
    Business development, Equipment, Infrastructure, Operations & Maintenance, Technology

    EnBW Energie Baden-Württemberg AG (EnBW) has selected 8.2 Consulting AG to provide manufacturing surveillance services for the 960 MW He Dreiht offshore wind farm in Germany. As an independent consultant, 8.2 Consulting AG will supervise the comprehensive nacelle manufacturing surveillance, including components in multiple locations Europe-wide, said the company. This collaboration results from 8.2 Consulting […]

  • 8 June 2022
    Contracts & Tenders, Wind Farm Update

    Vestas has signed a firm contract and conditional order with EnBW for the delivery of wind turbines for the He Dreiht offshore wind farm, and has contracted Cadeler to install 64 of its 15 MW units at the project site in the German part of the North Sea. The contract with Cadeler is also a […]

  • 18 August 2023
    Authorities, Wind Farm Update

    Baltic Power has secured three building permits for the 1.2 GW offshore wind farm that will be built approximately 23 kilometres north of the Baltic Sea coastline in Poland. The three building permits for the Baltic Power offshore wind project were issued on Wednesday by the Governor of the Polish region of Pomerania Dariusz Drelich. […]

  • 24 May 2022
    Contracts & Tenders, Wind Farm Update

    German energy company EnBW has selected the compatriot offshore foundations manufacturer, Steelwind Nordenham, to fabricate and deliver the monopiles for the 900 MW He Dreiht offshore wind farm. He Dreiht is located within the German Exclusive Economic Zone (EEZ) of the North Sea, about 85 kilometres north of the Borkum Island and 95 kilometres west of […]

  • 18 October 2021
    Contracts & Tenders, Wind Farm Update

    Empire Offshore Wind, a joint venture between Equinor and bp, has named Vestas as the preferred turbine supplier for the 2.1 GW Empire Wind 1 and Empire Wind 2 offshore wind projects in New York, USA. Vestas will provide 138 V236-15.0 MW turbines for Empire Wind 1 and 2, located 15-30 miles off the coast […]

  • 30 July 2024
    Contracts & Tenders, Fixed-Bottom, Supply Chain, Wind Turbines

    Vestas has received a firm order for the OranjeWind offshore wind project, previously named Hollandse Kust West VII, situated off the coast of the Netherlands in the North Sea. Vestas will provide 53 V236-15.0 MW wind turbines and is responsible for the supply, delivery, and commissioning of the units. Wind turbine installation at the project […]

  • 9 March 2022
    Ports & Logistics, R&D, Technology

    The two side-compartments for the Vestas V236-15.0 MW™ prototype wind turbine nacelle have arrived in Denmark. The side-compartments were then transported to Vestas’ factory in Esbjerg, where the full power converter system will be installed. According to Vestas, the modular nacelle components take full advantage of industrial standards, as the side-compartments are dimensionally designed to […]

  • 22 July 2024
    Environment, Floating Wind

    BadaEnergy has completed the environmental impact assessment (EIA) consultation with South Korea’s Ministry of Environment, Ministry of Oceans and Fisheries, and Ministry of Trade, Industry and Energy, for its Gray Whale floating offshore wind project in Ulsan. The completion of the EIA consultation is said to be a result of a more than 30-month-long consultation […]

  • 10 February 2022
    R&D, Technology

    Danish wind turbine manufacturer Vestas has installed the mould for the 115.5-metre turbine blades to be installed on the V236-15 MW prototype offshore wind turbine later this year. The mould was installed at the company’s blades factory in Nakskov, Denmark. Vestas plans to install the prototype turbine at the Østerild National test centre for large […]

  • 28 June 2024
    Business & Finance, Ports & Logistics

    Denmark’s Port of Roenne has been selected as the installation port for the Baltic Power offshore wind project in the Polish Baltic Sea. Baltic Power will be one of the first European offshore wind projects to use Vestas’ new 15 MW wind turbine which until now has only been installed as a prototype at the […]

  • 7 September 2022
    R&D, Technology

    China-based Lianyungang Zhongfu Lianzhong Composites Group Co., Ltd. (LZ Blades) has rolled out a 123-metre long blade which the company claims is the world’s longest wind turbine blade. The blade, which will be adapted to be installed on 16 MW offshore wind turbines, weighs 50 tonnes, exceeds 5 metres in diameter, and has a swept area that […]

  • 11 August 2021
    Business & Finance

    Danish wind turbine manufacturer Vestas has lowered its full-year guidance citing supply chain constraints, cost inflation, and restrictions in key markets caused by COVID-19. These are the characteristics of the current environment the impacts of which are likely to continue in the second half of the year, Vestas said. The company now expects full-year revenue […]

  • 14 August 2023
    Contracts & Tenders, Grid Connection, Wind Farm Update

    After working on finalising the agreement for export cables for the Baltic Power offshore wind farm in Poland this summer, the cable supplier NKT has now signed the order for the Polish project. In June, NKT said it was finalising the contract with Baltic Power, the joint venture the Polish PKN Orlen and Canadian Northland […]

  • 5 July 2024
    Fixed-Bottom, Grid Connection, Offshore Platforms

    Two transformers for the 1.1 GW Inch Cape offshore wind farm have completed their overland and sea journey from Zagreb, Croatia. The transformers traveled via Rotterdam, Netherlands, before arriving at the Smulders yard in Wallsend, the UK. The 545 MVA transformers were manufactured by Koncar Power Transformers company located in Zagreb. Now that the units […]