1187 results found for 'Bard Offshore 1'

1187 results found for 'Bard Offshore 1'
Order results by

A list of search results

  • 31 March 2026
    Fixed-Bottom, Project Updates, Vessels, Wind Farm Update

    Maersk’s first next-generation wind turbine installation vessel (WTIV), Maersk Viridis, has sailed out of Singapore and is on its way to the US, where it will install turbines on Equinor’s Empire Wind 1 offshore wind farm, under construction in the US federal waters off New York. According to Maersk Offshore Wind, the WTIV sailed out of […]

  • 14 January 2026
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates

    HSI, a joint venture between HSM Offshore Energy, Smulders and Iv, has installed the Jasmund offshore substation (OSS), which will connect the Windanker offshore wind farm to the German electricity grid, at its designated location in the Baltic Sea. The Jasmund platform is part of the Ostwind 3 grid connection project, which will collect 300 MW […]

  • 27 February 2026
    Business & Finance, Project Updates, Vessels, Wind Farm Update

    Seatrium handed over the Maersk wind turbine installation vessel (WTIV) to its owner on 26 February, the Singapore-based shipbuilder said. The new WTIV is scheduled to sail for its first assignment at the Empire Wind project offshore New York in March 2026. The WTIV recently completed sea trials in the South China Sea and final […]

  • 2 February 2026
    Grid Connection, Manufacturing, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    The HSI Joint Venture, comprising HSM Offshore Energy, Smulders, and Iv, has rolled out the topside of the second offshore substation (OSS) for the German offshore wind farm Gennaker at HSM Offshore Energy’s yard in Schiedam, the Netherlands. The joint venture will now work toward the upcoming load-out, sail-away, and offshore installation. The substation, named […]

  • 6 May 2026
    Business & Finance, Industry

    RWE has announced changes to the management board of its offshore wind business, with CEO Sven Utermöhlen set to leave the company on 30 September 2026. Utermöhlen will not renew his contract and will step down at his own request, after which he will continue to advise RWE’s offshore wind division for a period of […]

  • 20 March 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The County Administrative Board of Västra Götaland County has recommended that the Swedish government grant a permit for part of the Västvind (Westwind) offshore wind project, proposed to be built in the waters west of Gothenburg by Eolus. The authority assessed the section of the project situated within Sweden’s Exclusive Economic Zone (EEZ) and concluded […]

  • 21 January 2026
    Environment, Fixed-Bottom, Project Updates, Research & Development, Wind Farm Update

    The Neart na Gaoithe (NnG) offshore wind farm in Scotland is launching what the project owner says is the country’s largest seabird monitoring study, aimed at gathering detailed data on bird behaviour around offshore wind turbines. The 450 MW wind farm, located around 15.5 kilometres off the Fife coast in the Outer Firth of Forth, […]

  • 2 June 2026
    Business & Finance, Business development, Environment, Fixed-Bottom, Floating Wind, Grid Connection, Industry, Infrastructure, Innovation, Jobs & Recruitment, Operations & Maintenance, Outlook & Strategy, Planning & Permitting, Ports & Logistics, Power-to-X, Supply Chain, Technology, Training & Education, Vessels

    Offshore Energy Amsterdam 2026 has officially opened its Early Bird ticket sales. Industry professionals can now secure their place at Europe’s leading event for the offshore energy and maritime sectors with an exclusive 25% discount, available until 30 June 2026. Taking place on 24 and 25 November 2026 in Amsterdam, Offshore Energy Amsterdam brings together […]

  • 6 April 2026
    Authorities, Contracts & Tenders, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The Dutch Ministry of Economic Affairs and Climate Policy said on 3 April that, in addition to the already announced 1 GW IJmuiden Ver Gamma-A site that is set to be auctioned off this year, developers will also be able to apply for the 1 GW IJmuiden Ver Gamma-B site, bringing the upcoming offshore wind […]

  • 15 May 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The North Falls Offshore Wind Farm joint venture between RWE and SSE Renewables has been granted development consent for its 1 GW project by the UK Department for Energy Security and Net Zero (DSNEZ). The approval was issued the same day RWE received consent for its Dogger Bank South project, which the company owns in […]

  • 5 January 2026
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Fuinneamh Sceirde Teoranta (FST), a company owned by Corio Generation that was developing the 450 MW Sceirde Rocks offshore wind project in Ireland, withdrew the consent application for the wind farm on 17 December 2025, according to a notice issued by Ireland’s national planning body, An Coimiúsin Pleanála (ACP), on 22 December. The developer submitted an […]

  • 11 December 2025
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    The GE Vernova-Seatrium consortium has been awarded a contract to deliver the offshore converter platform for TenneT’s 2.2 GW BalWin5 offshore grid connection in the German North Sea. The contract is the fourth one awarded under the five-year framework agreement that GE Vernova and Seatrium signed with TenneT in 2023, and marks the consortium’s first […]

  • 7 April 2026
    Cables, Energy Islands, Grid Connection, Vessels

    Jan De Nul has launched William Thomson, the second of two identical subsea cable‑laying vessels currently under construction. Both vessels have a cargo capacity of 28,000 tonnes and a length of 215 metres. This makes them the largest of their kind, Jan De Nul said. Jan De Nul’s two new cable-laying vessels have been specially […]

  • 1 June 2026
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    NOTE: This article was updated on 1 June, following Ecowende’s announcement that the first wind turbine was installed at the offshore project site. The first wind turbine has been installed at the Hollandse Kust West VI offshore wind farm site in the Netherlands, where the Ecowende joint venture between Shell, Eneco, and Chubu Electric Power […]

  • 23 March 2026
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The US Department of the Interior (DOI) and TotalEnergies have signed settlement agreements to terminate the company’s two offshore wind leases in the United States, confirming recent reports that a deal was being drafted under which TotalEnergies would be reimbursed USD 928 million (around EUR 806 million) paid in lease fees. Under the deal, TotalEnergies, […]

  • 5 December 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The HSI consortium, comprising HSM Offshore Energy, Smulders, and Iv, has sent off the Jasmund offshore substation (OSS), which will connect the Windanker offshore wind farm in the Baltic Sea to the German electricity grid. The 4,500-tonne OSS topside, measuring 48 metres in length, 33 metres in width, 17.5 metres in height, has sailed out […]

  • 5 February 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Wind Farm Update

    Google has entered into a 15-year Power Purchase Agreement (PPA) with EnBW for electricity produced by 100 MW of capacity at the 960 MW He Dreiht offshore wind farm in Germany. The He Dreiht offshore wind farm is currently under construction about 85 kilometres northwest of the German island of Borkum and is set to […]

  • 23 April 2026
    Grid Connection, Planning & Permitting

    The New Jersey Board of Public Utilities (NJ BPU) has requested to terminate the State Agreement Approach (SAA) it signed with PJM Interconnection (PJM) in 2021 to develop offshore wind transmission projects in a more streamlined and cost-efficient way that also allow for minimal disruption to communities and nature while providing certainty for offshore wind […]

  • 13 April 2026
    Authorities, Business & Finance, Planning & Permitting

    The Polish government has introduced a new “local content” framework designed to increase the share of domestically generated value in large-scale investments, including energy projects, by modifying procurement practices and evaluation criteria. Speaking on 10 April, Prime Minister Donald Tusk stated that the government would strive to ensure that, wherever possible, Polish companies are prioritised […]

  • 24 April 2026
    Authorities, Industry, Market Outlooks, Outlook & Strategy, Planning & Permitting

    “The European offshore wind industry is gearing up to deliver”, WindEurope said on 23 April as energy ministers from the North Sea countries, together with the industry, transmission system operators (TSOs), and NATO, met in Madrid to discuss the next steps on implementing the Hamburg Declaration, signed in January. The European wind energy organisation also […]

  • 18 November 2025
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting

    Orlen Group has secured the environmental permit for its 1 GW Baltic East offshore wind farm in Poland from the Regional Directorate for Environmental Protection in Gdańsk. This milestone brings the project closer to participation in the first Polish offshore wind auction, scheduled for December this year, according to the developer. “During this auction, the […]

  • 21 November 2025
    Floating Wind, Foundations, Supply Chain, Technology

    BayWa r.e. has received concept certification from DNV for its BayFloat floating wind semi-submersible concrete substructure and mooring system design. The design was validated using the 22 MW generic reference turbine “IEA-22-280-RWT”. The certification process was conducted in accordance with DNV-SE-0422:2021-09 “Certification of floating wind turbines” scheme, including DNV-ST-0119:2021-06 “Floating wind turbine structures” as the […]

  • 4 November 2025
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    PGE Polska Grupa Energetyczna (PGE) has obtained environmental approval for its 900 MW Baltica 1 offshore wind project, clearing the way for its participation in Poland’s upcoming offshore wind auction on 17 December 2025. The approval was issued by the Regional Directorate for Environmental Protection in Gdańsk. “This is a clear signal to the market […]

  • 7 November 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Preliminary seismic and geotechnical surveys of the seabed have been completed at the Baltic East offshore wind farm site in the Polish Baltic Sea. Preliminary seabed surveys for the Baltic East project began at the end of June and lasted over 15 weeks, said Orlen Group, the developer of the offshore wind farm. The surveys […]

  • 3 November 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Shell New Energies, a subsidiary of Shell, has voluntarily withdrawn from Atlantic Shores Offshore Wind, bringing an end to its participation in the US offshore wind market. The company has assigned its 50 per cent outstanding membership interests to its existing partner, EDF, with an immediate effective date. Shell said it is driving a strategic […]

  • 29 October 2025
    Cables, Grid Connection, Project Updates, Wind Farm Update

    Fulan Offshore Engineering’s cable-laying barge (CLB) Ai Lan Yi Hao (AL-1) has completed the installation of the first circuit of the 500 kV export cable for the Yangjiang Fanshi 1 offshore wind farm in Guangdong, China. The 1,176 MW offshore wind project, developed by CGN Wind Energy, includes two circuits of 500 kV export cable […]