  • 16 June 2025
    Fixed-Bottom, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    Dajin Heavy Industry has produced the first three monopiles for the Inch Cape offshore wind farm, the company said on 16 June, a few days after CNOOD-Wenchong Heavy Industries (CWHI) announced it had completed the first monopiles from the batch it is delivering for the 1 GW project in Scotland. Dajin cut the first steel for […]

  • 7 April 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The final Siemens Gamesa 8 MW turbine has been installed at the 450 MW Neart na Gaoithe (NnG) offshore wind farm in Scotland. The installation of the 54th wind turbine was completed in the early hours of this morning (7 April) at the site located some 15.5 kilometres off the Fife coast. The work was […]

  • 14 April 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Energy and marine consultancy company ABL will provide marine warranty survey (MWS) services for the Inch Cape offshore wind farm during the entire construction period of the 1.1 GW project in Scotland. ABL will act as marine warranty surveyor for the transport and installation of the jacket and monopile foundations, offshore substation platform, wind turbines, […]

  • 15 January 2025
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    The second wind turbine installation campaign is about to start at the 450 MW Neart na Gaoithe offshore wind farm site off the coast of Fife, Scotland. According to a notice to mariners from the project, Fred Olsen Windcarrier’s jack-up vessel Brave Tern is scheduled to commence the work on or around 17 January. The vessel will load […]

  • 28 February 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    Construction activities on the Scottish Inch Cape offshore wind farm are scheduled to start this April with construction work within the project’s export cable corridor. According to a Notice to Mariners from the project team, the work will commence with operations at the export cable landfall site on or around 1 April 2025 with construction […]

  • 6 March 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Ventus Energy has secured two contracts with Ocean Winds to support its Scotland-based offshore wind farms, Moray West and Moray East. The first contract, awarded in September 2024 for Moray West, spans an 18-month period and includes operations and maintenance (O&M) for the offshore transmission owner (OFTO) assets. The scope of work includes timely inspections […]

  • 6 March 2025
    Business & Finance, Ports & Logistics

    The UK government has awarded more than GBP 55 million (about EUR 66 million) for the expansion of the Port of Cromarty Firth in Scotland. According to the government, this will enable the port to become the first in the UK capable of making floating offshore wind turbines on site and at scale. The Department […]

  • 27 February 2025
    Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update

    Jan De Nul will deploy its heavy-lift vessel Les Alizés for the monopile installation at the Inch Cape offshore wind farm in Scotland. The company was announced as one of the project suppliers at the beginning of this year as ESB and Red Rock Renewables reached financial close on the 1,080 MW Inch Cape project. […]

  • 6 June 2025
    Floating Wind, Project Updates, Wind Farm Update

    TGS is conducting a geophysical survey at the site of the Green Volt floating offshore wind project in Scotland, one of the Scottish INTOG round winners and projects planned to provide electricity to oil and gas platforms. The seismic vessel Ramform Vanguard has mobilised from Aberdeen and is scheduled to carry out the survey work at […]

  • 2 April 2025
    Business development, Fixed-Bottom, Project Updates, Research & Development, Wind Farm Update

    A geophysical survey is scheduled to commence this month at the site in Scotland where ScottishPower Renewables plans to build its 2 GW MachairWind offshore wind project. The geophysical survey will be carried out by Sulmara from the Port of Larne with an earliest commencement date of 15 April, according to MachairWind’s latest notice to […]

  • 16 June 2025
    Business & Finance, Floating Wind

    NorthConnect has been acquired by the developers of the Cenos Offshore Windfarm, a 1.4 GW floating wind project in Scotland led by Flotation Energy and Vårgrønn. In a recent social media post, Vårgrønn said that the acquisition of NorthConnect marks a key milestone in the development of the floating wind project, as it already holds […]

  • 12 March 2025
    Authorities, Fixed-Bottom, Planning & Permitting

    Scotland’s Highland Council has given its backing to the offshore plans of the West of Orkney Windfarm project, being developed by TotalEnergies, Corio Generation, and Renewable Infrastructure Development Group (RIDG). The offshore plans contain detailed information on how the proposed wind farm will be built, along with additional environmental information that was submitted last year. […]

  • 13 March 2025
    Business & Finance, Contracts & Tenders, Supply Chain

    Inch Cape Offshore Limited (ICOL), a joint venture between ESB and Red Rock Renewables, has awarded a contract to OES Group to supply 54 external and internal Impressed Current Cathodic Protection (ICCP) systems to protect the offshore wind project’s monopile and transition piece foundations. The ICCC anodes will be produced in OES Group’s new dedicated […]

  • 4 April 2025
    Project Updates, Wind Farm Update

    SSE Renewables is undertaking a benthic survey within a prospective offshore export cable route at the Berwick Bank offshore wind farm site in Scotland. The survey work is being carried out by Natural Power, utilising the Windcat 20 as the survey vessel. According to a Notice from Mariners from the project, the survey commenced on […]

  • 14 May 2025
    Operations & Maintenance, Ports & Logistics

    UK companies Haventus and Sarens PSG have developed a low-cost solution for the integration and launch of floating offshore wind turbines. Haventus said that it is working to enable offshore wind project developers to acquire fully assembled floating bases and turbines at Ardersier, Scotland, as well as providing dry storage which does not require complex […]

  • 10 March 2025
    Business & Finance, Cables, Fixed-Bottom, Grid Connection, Offshore Platforms, Onshore Infrastructure, Project Updates, Wind Farm Update

    The joint venture between SSE Renewables, TotalEnergies and PTTEP has signed an agreement with a consortium of Equitix and Kyuden Group to sell the offshore transmission assets of the Seagreen Phase 1 offshore wind farm in Scotland. The Seagreen 1 transmission assets transmit electricity from the offshore wind farm via three export cables, each approximately […]

  • 22 January 2025
    Floating Wind, Project Updates, Wind Farm Update

    Ireland-based XOCEAN has completed the geophysical survey along the 420-kilometre cable route for the proposed 3.6 GW Ossian floating offshore wind farm in Scotland. The survey, conducted using uncrewed survey vessels (USVs), took place over a span of 13 months, in water depths ranging from the shoreline to over 100 metres. The gathered data will […]

  • 12 May 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    UK-based Tekmar Group has been awarded a contract to provide grouting services for the 1.1 GW Inch Cape offshore wind farm in Scotland. Under the contract, Tekmar Group will deliver a specialist grouting solution for key offshore wind infrastructure. The work is scheduled to commence in September 2025. According to the company, grouting is an […]

  • 1 January 2025
    Business development, Equipment, Fixed-Bottom, Floating Wind, Operations & Maintenance, Project Updates, Supply Chain, Technology, Vessels, Wind Farm Update, Wind Turbines

    New wind turbine models, vessels and equipment, and project updates were the most read topics on offshoreWIND.biz in 2024. In this overview, we are bringing the ten most popular news in 2024. In January 2024, Siemens Gamesa received a EUR 30 million grant from the EU for a project called Highly Innovative Prototype of the […]

  • 23 June 2025
    Business development, Floating Wind, Research & Development, Technology

    The Reduced Commercial Risks with Demo of 15+ MW (RECORD15) joint industry project, which aims to install a latest generation turbine with a rated power over 15 MW on Ocergy’s floating platform in 2028, has been launched. The Front-End Engineering Design (FEED) contract for this pilot project was recently signed between Ocergy and three offshore […]

  • 20 January 2025
    Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    The first cutting and rolling of monopiles, which will be installed at the 1.1 GW Inch Cape offshore wind farm in Scotland, have been completed by CNOOD-Wenchong Heavy Industries (CWHI) in China. CWHI hosted representatives from Inch Cape Offshore Limited, a joint venture company held equally by Red Rock Power and ESB, at its Qinzhou […]

  • 24 April 2025
    Business development, Floating Wind, Research & Development

    Cerulean Winds has completed 72 digital aerial surveys for its Aspen, Beech, and Cedar floating offshore wind farms in Scotland. The ecological data was collected across an area of 2,784 square kilometres, which is equivalent to the combined area of Perth, Kinross, and Angus, said Cerulean Winds. The work, completed by HiDef Surveying using fixed-wing […]

  • 6 May 2025
    Floating Wind, Project Updates, Wind Farm Update

    A campaign to gather more than two years of wind data crucial for the development of the Scottish Ossian floating offshore wind farm has been completed. Two floating LiDAR buoys (FLiDAR) have been deployed to survey the 858-square-kilometre site, 84 kilometres off the east coast of Scotland, since August 2022. Using profiling lasers, the buoys […]

  • 26 February 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    Geophysical survey operations and a static fishing gear survey are taking place within the Inch Cape offshore wind farm site and its associated export cable corridor from 19 February until the end of April. On behalf of Inch Cape Offshore Limited, a joint venture between ESB and Red Rock Renewables, the Dutch company N-Sea is […]

  • 26 February 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Danish Copenhagen Infrastructure Partners (CIP), on behalf of its fund Copenhagen Infrastructure V (CI V), has signed a transaction to take full ownership of the Morecambe offshore wind farm from Cobra Group and Flotation Energy, owned by TEPCO Renewable Power. The financial terms of the transaction are not disclosed. Flotation Energy will remain involved after […]

  • 23 May 2025
    Business & Finance, Floating Wind

    French renewable energy developer Qair and Italy’s Eni Plenitude have formed a consortium to participate in the French AO9 offshore wind tender, which was opened in July 2024. At the start of 2025, the total capacity allocated via offshore wind tenders in France amounts to around 5.34 GW. With the inclusion of the AO9 and […]