3689 results found for 'Morgan'

3689 results found for 'Morgan'
Order results by

A list of search results

  • 19 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    After EnBW decided to exit the Morgan and Mona offshore wind projects in the UK, totalling 3 GW, the company’s joint venture partner, JERA Nex BP, is acquiring EnBW’s stake in 1.5 GW Mona, while the joint venture will not continue with the Morgan offshore wind project. On 15 January, EnBW announced it was withdrawing […]

  • 5 June 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    A joint venture between JERA Nex BP and EnBW has submitted Section 36 consent applications for the Morven offshore wind farm to the Scottish government. The developer secured the seabed rights for the Morven offshore wind farm as a single project in the ScotWind Leasing Round in 2022 and split it into two separate projects […]

  • 10 March 2026
    Contracts & Tenders, Fixed-Bottom, Floating Wind, Supply Chain

    Interocean Marine Services has signed a master services agreement with JERA Nex BP to provide marine consultancy and assurance services in support of offshore wind operations in the North Sea and globally. Under the agreement, Interocean will deliver a range of marine services from its base in Aberdeen, Scotland, including marine assurance, engineering, offshore operations […]

  • 12 March 2026
    Vessels

    Ulstein Verft has delivered a new commissioning service operation vessel (CSOV) to Bernhard Schulte Offshore (BSO). The CSOV, named Windea Carnot, is the third of three sister vessels built by the Norwegian shipbuilder for the German offshore wind vessel operator and the first of two ordered by investors advised by J.P. Morgan under options included […]

  • 15 January 2026
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    EnBW has decided to withdraw from the Mona and Morgan offshore wind projects in the UK after not securing Contracts for Difference (CfDs) in the UK’s seventh allocation round. The company says that in a challenging investment environment, the two projects are no longer economically viable as per EnBW’s criteria. EnBW has been developing the […]

  • 8 January 2026
    Business & Finance, Vessels

    Ulstein Verft in Norway has launched Yard no. 322, the first of two commissioning service operation vessels (CSOVs) the company is building for investors advised by J.P. Morgan. In July 2023, Bernhard Schulte Offshore ordered the design and construction of two CSOVs from Ulstein under a contract that included options for two + two vessels. In […]

  • 29 January 2026
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    The 1.5 GW Mona offshore wind farm, owned by JERA Nex BP, and the 480 MW Morecambe, owned by Copehnagen Infrastructure Partners (CIP), have entered into lease with the Crown Estate. The developers secured the project sites in the Irish Sea in the Crown Estate’s UK Round 4 leasing at the beginning of 2021. The Crown Estate said on […]

  • 7 November 2025
    Business & Finance, Fixed-Bottom, Ports & Logistics

    EnBW and JERA Nex bp have committed over GBP 100 million (approximately EUR 113.5 million) to Belfast Harbour to support the development of their Mona and Morgan offshore wind farms in the Irish Sea. The joint venture said the lease of Belfast Harbour’s D1 terminal will see the assembly and marshalling of wind turbine components […]

  • 26 January 2026
    Equipment, Floating Wind, Supply Chain, Vessels

    Kongsberg Maritime said on 26 January that the company would support a floating wind construction (FWCV) vessel by HANA Shipping “with a complete deck machinery package designed for demanding offshore operations”. The new 127-metre vessel is being built for the Ulsan floating wind projects in South Korea and is scheduled for delivery in July 2027. […]

  • 10 February 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    Fugro is scheduled to soon start conducting geophysical surveys at a site in the Outer Moray Firth, Scotland, where Ocean Winds plans to build its 2 GW Caledonia offshore wind farm. The work, to be carried out within the wind turbine array site, will be conducted by the vessels Fugro Pioneer and Kommandor Iona. Fugro […]

  • 29 December 2025
    Business & Finance, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Vestas has received a wind turbine order for the Shinan-Ui offshore wind project, which marks the company’s first offshore wind order in South Korea. The 390 MW Shinan-Ui will be built off Jeollanam Province by a consortium consisting of Hanwha Ocean, SK Eternix, KOMIPO (Korea Midland Power Co., Ltd.), Future Energy Fund, and Hyundai Engineering […]

  • 5 February 2026
    Contracts & Tenders, Equipment, Floating Wind, Supply Chain, Vessels

    MacGregor will supply a 400-tonne active heave compensated (AHC) subsea crane for a new floating wind construction vessel (FWCV) that Jiangsu Dajin Heavy Industry is building in China for the South Korean company HANA Shipping. MacGregor is scheduled to deliver the crane at the end of 2027, with the vessel’s delivery following in Q2 2028. […]

  • 15 April 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update

    ABL has been appointed marine warranty surveyor (MWS) on the Shinan Ui offshore wind project in South Korea. The energy and marine consultancy, part of Norwegian ABL Group, will provide marine warranty survey services to support the transportation and installation operations, as well as marine assurance services for the proposed marine spread for the 390 […]

  • 25 February 2026
    Business & Finance, Equipment, Technology, Vessels

    Norway’s Kongsberg Maritime has been appointed to deliver an integrated technology package for what is said to be South Korea’s first specialised HVDC installation vessel, being built in Türkiye. South Korean subsea cable installation company LS Marine Solution signed a contract with Türkiye’s Tersan Shipyard for the construction of the ultra-large cable laying vessel (CLV) at […]

  • 6 February 2026
    Vessels

    Hanwha Ocean has secured an order from Ocean Wind Power 1 for a wind turbine installation vessel (WTIV) worth KRW 768.7 billion (approximately EUR 444 million). Scheduled for delivery in the first half of 2028, the new vessel will be the first WTIV in Korea capable of installing 15 MW-class offshore wind turbines, and is […]

  • 24 December 2025
    Business & Finance, Business development, Cables, Grid Connection, Outlook & Strategy, Vessels

    Japanese shipping major Mitsui O.S.K. Lines (MOL) has received approval in principle (AiP) from compatriot classification society ClassNK for the basic design of specialized vessels for subsea power cable jointing and burial. MOL is working with Sumitomo Electric Industries, Furukawa Electric, and Nippon Yusen Kabushiki Kaisha (NYK Line) to develop what it says are fundamental […]

  • 14 May 2026
    Cables, Grid Connection, Outlook & Strategy, Vessels

    South Korea’s Taihan Cable & Solution has acquired a 2016-built cable laying vessel (CLV) from Norwegian DOF Group, representing the second offshore wind-dedicated CLV introduced in Korea. The 10,000-tonne class Skandi Connector was designed by Dutch shipbuilder Damen and has to date been deployed on 27 projects, installing approximately 1,300 kilometres of submarine cables, Taihan noted. […]

  • 23 March 2026
    Collaboration, Industry, Operations & Maintenance

    Vestas, KEPCO Plant Service & Engineering (KPS) and KMC Line have signed a Memorandum of Understanding (MoU) to support Korea’s offshore wind sector, specifically, the operation and maintenance (O&M) segment of the market. According to Vestas, the MoU aims to accelerate the development of a skilled workforce and high‑quality offshore wind O&M capabilities in Korea. […]

  • 6 March 2026
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    Quoceant has been awarded a contract by Ocean Winds to provide engineering support to the 390 MW BC-Wind offshore wind farm in Poland. Quoceant’s scope of work covers review of documentation, development of calculations and tools to support the Ocean Winds engineering team decisions, as well as the creation of detailed structural models to support […]

  • 5 June 2026
    Business & Finance, Jobs & Recruitment, Operations & Maintenance

    OEG has acquired UK-based offshore and onshore wind workforce specialist Hybrid Resource Management in a move aimed at expanding its technical services capabilities in the offshore wind operations and maintenance market. Hybrid provides personnel support services for offshore wind operations, including preventative maintenance and major corrective repairs for OEMs across the UK and Europe. The […]

  • 5 February 2026
    Business & Finance, Supply Chain, Wind Turbines

    Vestas’s offshore wind turbine order backlog was worth EUR 10.1 billion as at 31 December 2025, according to the company’s annual report, which shows that for both onshore and offshore, the turbine order backlog amounted to 31,026 MW and a value of EUR 33.2 billion at the end of the year, EUR 1.6 billion more […]

  • 5 May 2026
    Industry, Planning & Permitting

    The German Offshore Wind Energy Association (BWO) has called for clear political commitments and a binding roadmap to support offshore wind expansion. BWO issued a statement ahead of the National Maritime Conference that took place from 29 to 30 April in Emden. “The National Maritime Conference is an important opportunity to make clear political commitments […]

  • 14 January 2026
    Business & Finance, Fixed-Bottom, Floating Wind, Planning & Permitting

    Hanwha Group’s renewable energy arm in France, Q Energy France, together with Hanwha Ocean, has entered the pre-qualification process to participate in the upcoming offshore wind seabed leasing in Nova Scotia, Canada, the South Korean company said on 14 January.   The Canada-Nova Scotia Offshore Energy Regulator (CNSOER) issued a Call for Information and opened […]

  • 9 April 2026
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    South Korea has completed the financial close structure for the 390 MW Shinan Ui offshore wind project, with funding set to begin flowing into construction from the second quarter of 2026. The Financial Services Commission (FSC) announced on 9 April that a project financing agreement has been signed and the full lender group established, marking […]

  • 11 February 2026
    Business & Finance, Collaboration, Infrastructure, Innovation, Operations & Maintenance, Outlook & Strategy, Ports & Logistics, Transition, Vessels

    The UK’s first commercially ready biomethanol storage and supply service for shipping has been launched at the Port of Immingham, the largest port by cargo volume in the UK, as part of efforts to advance decarbonisation in maritime transport. The first company to use the new service will be the offshore wind farm owner/operator Ørsted. A three-partite partnership of Exolum, Methanex Corporation and Ørsted is behind […]

  • 14 January 2026
    Floating Wind, Grid Connection, Offshore Platforms

    The American Bureau of Shipping (ABS) has issued an Approval in Principle (AiP) for a new floating offshore substation design developed by HD Hyundai Heavy Industries (HD HHI). The substation concept received a SMART (SHM) Tier 3 AiP, which acknowledges the proposed structural health management system’s alignment with the Tier 3 requirements in the ABS […]