2832 results found for 'Hywind Scotland'

2832 results found for 'Hywind Scotland'
Order results by

A list of search results

  • 1 January 2025
    Business development, Equipment, Fixed-Bottom, Floating Wind, Operations & Maintenance, Project Updates, Supply Chain, Technology, Vessels, Wind Farm Update, Wind Turbines

    New wind turbine models, vessels and equipment, and project updates were the most read topics on offshoreWIND.biz in 2024. In this overview, we are bringing the ten most popular news in 2024. In January 2024, Siemens Gamesa received a EUR 30 million grant from the EU for a project called Highly Innovative Prototype of the […]

  • 2 June 2025
    Authorities, Planning & Permitting

    The Scottish government has launched a consultation on its updated Sectoral Marine Plan for Offshore Wind Energy, seeking input on how offshore wind projects are developed in the country. The draft updated Sectoral Marine Plan for Offshore Wind Energy aims to balance the needs of nature, communities, and other users of the sea. It is […]

  • 19 June 2025
    Authorities, Industry, Market Outlooks, Outlook & Strategy, Planning & Permitting

    The Scottish government is seeking views on proposals which would see the country’s offshore wind ambition increased to up to 40 GW of new capacity by 2040. The consultation will run until 13 August. The estimate that 40 GW equates to enough renewable energy to power 45 million homes assumes offshore wind capacity in 20240 […]

  • 15 January 2025
    Business & Finance, Business development, Fixed-Bottom, Floating Wind, Industry, Innovation

    Offshore Renewable Energy (ORE) Catapult, in partnership with several offshore wind developers, has created Fit for Offshore Renewables (F4OR) Island programme, a dedicated industry supply chain programme for businesses based across Scotland’s island and coastal communities which opens this week. The developers who helped create the programme are progressing four Scottish offshore wind projects: MachairWind […]

  • 30 June 2025
    Authorities, Planning & Permitting, Project Updates, Wind Farm Update

    The West of Orkney Windfarm, a joint venture between TotalEnergies, Corio Generation, and Renewables Infrastructure Development Group (RIDG), has been granted offshore consent by the Scottish government. The decision makes the 2 GW West of Orkney Windfarm the first ScotWind project to secure both offshore and onshore planning permissions. The wind farm will be built […]

  • 20 June 2025
    Authorities, Grid Connection, Onshore Infrastructure, Planning & Permitting, Project Updates, Wind Farm Update

    The onshore consent application for the up to 1 GW Muir Mhòr floating offshore wind farm has been approved by the Aberdeenshire Council in Scotland. The application covers the floating wind farm’s onshore infrastructure, including underground cabling and a substation. The wind farm is the first fully floating project from the ScotWind leasing process to […]

  • 22 April 2025
    Business development, Floating Wind, Research & Development

    UK-based Offshore Solutions Group (OSG) has signed a two-year Exclusivity Agreement with Crown Estate Scotland for areas in the Moray Firth to develop its FLOW-Park. The Moray FLOW-Park aims to provide temporary safe anchorage (wet storage) for floating offshore wind foundations, optimising risk management and logistics during assembly, wind turbine integration, and deployment, said OSG. […]

  • 22 January 2025
    Floating Wind, Planning & Permitting, Project Updates, Wind Farm Update

    A joint venture between Ørsted, Simply Blue Group and Subsea7 has retrieved floating LiDARs and wave buoy equipment as part of the metocean campaign for the proposed Salamander floating offshore wind farm off the North East of Scotland. The campaign started in October 2023 with the deployment of two floating SEAWATCH Wind Lidar Buoys and […]

  • 27 March 2025
    Authorities, Floating Wind, Grid Connection, Onshore Infrastructure, Planning & Permitting

    Salamander Offshore Wind Farm, being developed by a joint venture between Ørsted, Simply Blue Group, and Subsea7, has been awarded planning permission in principle for the onshore aspects of its proposed floating project in Scotland. The submission was made to Aberdeenshire Council for the onshore substation and associated infrastructure in August 2024 under the Town […]

  • 5 June 2025
    Business development, Contracts & Tenders, Fixed-Bottom, Floating Wind, Research & Development, Supply Chain

    Renewable energy consultancy OWC and Empire Engineering have been selected to provide owner’s engineering services for the 1 GW Ayre and 1 GW Bowdun offshore wind farms in Scotland. The companies will support Thistle Wind Partners (TWP), a consortium of DEME, Qair, and Aspiravi, from concept selection through to further design phases. OWC will act […]

  • 16 June 2025
    Business & Finance, Floating Wind

    NorthConnect has been acquired by the developers of the Cenos Offshore Windfarm, a 1.4 GW floating wind project in Scotland led by Flotation Energy and Vårgrønn. In a recent social media post, Vårgrønn said that the acquisition of NorthConnect marks a key milestone in the development of the floating wind project, as it already holds […]

  • 19 December 2024
    Cables, Floating Wind, Industry, Ports & Logistics, Research & Development, Supply Chain, Vessels

    “We probably have around 150 different floating wind platform designs at the moment. So how do you design a perfect port for floating wind?”—Tommy Sandtorv, CCO Karmsund Port at Karmsund Port Authority. Sandtorv shared this thought on 26 November at Offshore Energy Exhibition & Conference (OEEC) in Amsterdam, during a discussion about the challenges in […]

  • 9 December 2024
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Grid Connection, Supply Chain

    Proserv has been awarded a contract by DEME Offshore to de-risk offshore wind operations at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm project in the UK. According to Proserv, the company will utilise its Electro Cable Guard (ECG) system to identify signs of transmission cable failure far earlier, […]

  • 19 February 2025
    Business & Finance, Floating Wind, Industry, Supply Chain

    Global Underwater Hub (GUH) and Scottish Enterprise have signed a memorandum of understanding (MoU) to collaborate on establishing a subsea supply chain ecosystem as a global centre of excellence for floating wind. The partners said on 18 February that the floating wind market was estimated to be worth GBP 1 trillion (approximately EUR 1.2 trillion) […]

  • 22 January 2025
    Business & Finance, Ports & Logistics

    Cerulean Winds, a floating wind company with 3 GW under development in the Central North Sea, has selected Haventus, owner of the under-construction Ardersier Energy Transition Facility, as its chosen deployment port. The Cerulean alliance’s first project will be the Aspen development, a 1 GW floating offshore wind farm located in the central North Sea […]

  • 10 March 2025
    Business & Finance, Cables, Fixed-Bottom, Grid Connection, Offshore Platforms, Onshore Infrastructure, Project Updates, Wind Farm Update

    The joint venture between SSE Renewables, TotalEnergies and PTTEP has signed an agreement with a consortium of Equitix and Kyuden Group to sell the offshore transmission assets of the Seagreen Phase 1 offshore wind farm in Scotland. The Seagreen 1 transmission assets transmit electricity from the offshore wind farm via three export cables, each approximately […]

  • 4 April 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    GHD has been selected to provide the electrical front-end engineering design (FEED) for Ocean Winds’ Caledonia offshore wind farm in Scotland. GHD’s involvement includes evaluating two turbine designs and developing the FEED for key electrical components such as inter-array cables, the offshore high-voltage alternating current (HVAC) substation, power-system configuration, export cables, landfall and transition bays, […]

  • 24 April 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The UK Secretary of State for Scotland, Ian Murray, switched on full power at the 882 MW Moray West offshore wind farm, built by Ocean Winds some 20 kilometres off the coast of Buckie. Moray West comprises 60 Siemens Gamesa SG 14-222 DD wind turbines, each of which can generate up to 14.7 MW with […]

  • 11 February 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    The developer of the Inch Cape offshore wind farm has awarded a contract to UK-based Granada Cranes to provide 72 davit crane units on one of Scotland’s largest offshore wind projects. Granada Cranes has been contracted to design and supply two separate types of davit cranes, each to suit the mixed use of jacket and […]

  • 3 February 2025
    Business development, Floating Wind, Research & Development

    The metocean and LiDAR surveys have been completed at the Buchan floating offshore wind farm site located off the northeast coast of Scotland. Partrac recently recovered the project LiDAR and seabed instrumentation at the project site some 75 kilometres northeast of Fraserburgh on the Aberdeenshire coast. The two-year metocean and floating LiDAR campaign has seen […]

  • 27 February 2025
    Environment, R&D

    The UK’s National Oceanography Centre (NOC) has delivered a roadmap to improve ocean observation and enhance understanding of the potential impacts of expanding offshore wind developments on the marine environment. The Scoping an Offshore Wind Sustained Observation Programme report was commissioned by the Scottish Government’s Scottish Marine Energy Research (ScotMER) programme, to help inform the […]

  • 27 January 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    ESB and Red Rock Renewables have reached a financial close on the 1,080 MW Inch Cape offshore wind farm in Scotland, and the project will now progress into its offshore construction phase. The Scottish offshore wind project has reached a financial close, securing a GBP 3.5 billion financing package from shareholders and lenders, comprising 22 […]

  • 7 April 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    The final Siemens Gamesa 8 MW turbine has been installed at the 450 MW Neart na Gaoithe (NnG) offshore wind farm in Scotland. The installation of the 54th wind turbine was completed in the early hours of this morning (7 April) at the site located some 15.5 kilometres off the Fife coast. The work was […]

  • 13 June 2025
    Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    China’s CNOOD-Wenchong Heavy Industries (CWHI) has completed the manufacturing of the first monopiles for the 1,080 MW Inch Cape offshore wind project in Scotland. The monopiles are 11.5 metres in diameter, up to 110 metres in length, and have a maximum weight of 2,300 tonnes. The first cutting and rolling of monopiles was carried out […]

  • 15 January 2025
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    The second wind turbine installation campaign is about to start at the 450 MW Neart na Gaoithe offshore wind farm site off the coast of Fife, Scotland. According to a notice to mariners from the project, Fred Olsen Windcarrier’s jack-up vessel Brave Tern is scheduled to commence the work on or around 17 January. The vessel will load […]

  • 25 February 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Taylor Hopkinson has been awarded a quality assurance/quality control (QA/QC) surveillance contract for the Inch Cape offshore wind farm in Scotland. Taylor Hopkinson will support the fabrication and construction of Scotland’s 1.1 GW Inch Cape offshore wind farm, being jointly developed by Red Rock Renewables and ESB. The company and Brunel’s global presence spans all […]