64 results found for 'Formosa 4'

64 results found for 'Formosa 4'
Order results by

A list of search results

  • 16 September 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Synera Renewable Energy (SRE) has partnered with Siemens Gamesa for the third time, selecting the company to supply 35 14 MW turbines for the Formosa 4 offshore wind farm in Taiwan. The turbines will be provided by Siemens Gamesa’s industrial nacelle factory in Taichung, Taiwan. The wind turbine foundations will be supplied by the local […]

  • 29 January 2026
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The consortium between Semco Maritime and PTSC Mechanical & Construction has cut the first steel for the Formosa 4 offshore substation (OSS) at PTSC M&C’s fabrication yard in Vung Tau, Vietnam. Under a contract awarded in late August 2025, the consortium is responsible for the design, procurement, construction, and commissioning of the offshore substation’s jacket […]

  • 25 September 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Synera Renewable Energy has signed a contract with CSBC-DEME Wind Engineering (CDWE) for the transportation and installation of 35 turbine foundations and the offshore substation, as well as scour protection works for the Formosa 4 offshore wind farm in Taiwan. Among the fleet to be deployed by CDWE to support the project’s grid connection target, […]

  • 9 October 2025
    Cables, Contracts & Tenders, Fixed-Bottom, Grid Connection, Project Updates, Supply Chain, Wind Farm Update

    Jan De Nul has signed a contract with Synera Renewable Energy (SRE) for the installation of subsea export cables on the Formosa 4 offshore wind farm. SRE has also selected the Belgian offshore construction contractor for export cables on its Formosa 6 offshore wind project. Under the contract for Formosa 4, Jan De Nul will […]

  • 29 September 2025
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    The consortium between Denmark’s Semco Maritime and Vietnam’s PTSC Mechanical & Construction (PTSC M&C) has secured an Engineering, Procurement, and Construction (EPC) contract with Synera Renewable Energy (SRE) for the offshore substation of the Formosa 4 offshore wind farm in Taiwan. Following extensive negotiation rounds, the consortium was awarded the EPC contract in late August […]

  • 30 December 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    The output of the 495 MW Formosa 4 offshore wind farm in Taiwan has been fully subscribed, according to its developer Synera Renewable Energy (SRE) Group, which signed three corporate power purchase agreements (CPPAs) this month. “With this milestone, the ready-to-build Formosa 4 now calls for support from the government and local financial institutions to […]

  • 5 March 2026
    Contracts & Tenders, Equipment, Project Updates, Supply Chain, Wind Farm Update

    Palfinger has secured a contract to supply PF 200 fully electric offshore cranes for the Formosa 4 offshore wind farm in Taiwan. As part of the contract for Synera Renewables Taiwan (SRE), Palfinger will supply 35 units of PF 200 fully electric offshore cranes, each with a 7-meter outreach. They will be installed on jacket […]

  • 2 September 2025
    Cables, Contracts & Tenders, Project Updates, Supply Chain, Wind Farm Update

    Synera Renewable Energy (SRE) has awarded a contract to Seaway7, part of the Subsea7 Group, for the transport and installation of 35 inter-array cables at the Formosa 4 offshore wind farm in Taiwan, with offshore work expected to commence in 2028. Announcing the contract award, Subsea7 said this was a “substantial contract”, which the company […]

  • 22 August 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain, Vessels

    Cadeler has signed a firm contract with Synera Renewable Energy (SRE) for the transportation and installation of turbines at the 495 MW Formosa 4 offshore wind farm in Taiwan. The transportation and installation of 35 Siemens Gamesa 14 MW turbines will be executed by one of Cadeler’s next-generation M-class wind turbine installation vessels (WTIVs). The […]

  • 25 August 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Foundations, Supply Chain

    Synera Renewable Energy (SRE) has contracted Taiwan-based Century Group to supply wind turbine foundations for the 800 MW Formosa 6 offshore wind farm. Under the contract, Century Wind Power (CWP) will supply 57 jackets for Formosa 6, Taiwan’s single largest offshore wind farm by capacity. Additionally, Century Huaxin Wind Energy, newly appointed as a Tier […]

  • 8 August 2025
    Business & Finance, Vessels

    Synera Renewable Energy (SRE) has awarded a 15-year contract to Dong Fang Offshore (DFO) to support the operations and maintenance (O&M) of SRE’s fleet of assets, starting with the Formosa 4 offshore wind project in Taiwan. Under the contract, which is the longest of its type in Taiwan’s offshore wind sector to date, DFO will […]

  • 15 August 2025
    Fixed-Bottom, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    Century Wind Power has delivered all three-legged jacket foundations for the 1 GW Hai Long offshore wind project in Taiwan. The delivered wind turbine jacket foundations are the largest and heaviest ever produced for a Taiwanese offshore wind farm, according to Hai Long Offshore Wind. Each stands over 90 metres tall and weighs approximately 2,000 […]

  • 3 July 2025
    Business & Finance, Contracts & Tenders, Foundations, Supply Chain

    Synera Renewable Energy (SRE) has awarded a contract to Century Wind Power (CWP) to supply wind turbine foundations for the 495 MW Formosa 4 offshore wind farm in Taiwan. Under the contract, the Taiwan-based company will supply 35 jacket foundations for Formosa 4 and be responsible for the overall coordination of the foundation package in […]

  • 13 May 2025
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Synera Renewable Energy Group (SRE) has decided to acquire an additional 26 per cent stake in the 376 MW Formosa 2 offshore wind farm in Taiwan, raising its ownership from 25 per cent to a controlling 51 per cent. “SRE’s acquisition of an additional stake coincides with the second anniversary of Formosa 2’s commercial operation. […]

  • 6 July 2021
    Business & Finance, Wind Farm Update

    Swancor Renewable Energy (SRE) has partnered with Tien Li Offshore Wind Technology, Yeong Guan Energy, and J&V Energy Technology to establish a consortium named ‘Taiwan Team’, which will develop two wind farms off the Taiwanese coast: one with turbines installed on bottom-fixed foundations and one using floating wind technology. The Taiwan Team will focus on […]

  • 19 October 2020
    Business & Finance, Contracts & Tenders

    Swancor Renewable Energy and Taiwan’s Metal Industries Research & Development Centre (MIRDC) have signed a Memorandum of Understanding (MOU) on floating offshore wind. Under the MOU, the two parties will cooperate on advancing the deployment of floating wind technology in Taiwanese waters and supporting the development of a local supply chain for floating wind. The […]

  • 22 September 2020
    Business & Finance, Wind Farm Update

    Swancor Renewable Energy has revealed plans to develop the 4.4 GW Formosa 4 offshore wind project off the Miaoli County in Taiwan. The portfolio would consist of three sites, including Formosa 4-1, Formosa 4-2 and Formosa 4-3, which would cover a large maritime area located 18 to 20km offshore. Swancor Renewable Energy said it had […]

  • 17 March 2022
    Contracts & Tenders, Wind Farm Update

    Semco Maritime has received an order for a conceptual design study for a 500 MW offshore substation, including a jacket foundation, for Swancor Renewable Energy’s Formosa 4 offshore wind project in Miaoli County, Taiwan. The Danish company will carry out the scope of work with assistance from partners PTSC M&C in Vietnam, ISC Consulting Engineers […]

  • 15 November 2024
    Authorities, Business & Finance, Fixed-Bottom, Planning & Permitting

    Formosa 4, Synera Renewable Energy’s (SRE) third offshore wind project in Taiwan, received the establishment permit from the Energy Administration, Ministry of Economic Affairs, in late October. According to SRE, Formosa 4 is the first project to reach this milestone among all successful bidders in the first auction for Phase 3 Zonal Development for Offshore […]

  • 9 July 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    Scotland-headquartered Sulmara has completed a site characterization survey for the Formosa 4 offshore wind project in Taiwan, developed by Synera Renewable Energy (SRE). To overcome challenging environmental site conditions, Sulmara said it employed an industry-first, multi-platform approach running the sensors to meet the specified data coverage and data quality requirements. “When we began assessing the […]

  • 10 June 2022
    Authorities, Wind Farm Update

    Formosa 4, an offshore wind project being developed by Swancor Renewable Energy (SRE) in Taiwan, has received the preliminary approval of its Environmental Impact Assessment (EIA). The project, also known as Miaoli 3, was the first of the nine projects for which Taiwan’s Environmental Protection Agency (EPA) started the review process in March this year. […]

  • 8 December 2021
    Business & Finance

    Shizen Energy and Swancor Renewable Energy have entered into an agreement to jointly develop offshore wind farms in Japan’s Kyushu region. According to Swancor, the developer of Taiwan’s first offshore wind farm, Formosa 1, Japan’s waters are similar to Taiwan’s in terms of geological and weather conditions. “Unlike the waters of Europe, where offshore wind […]

  • 27 January 2025
    Business & Finance, Project Updates, Wind Farm Update

    Pine Wind Power Co., Ltd (Pine Wind) has agreed to purchase a 26 per cent equity and debt stake in the 376 MW Formosa 2 offshore wind farm in Taiwan from Macquarie Asset Management. The proposed investment will be acquired through J&V Energy’s wholly owned subsidiary, Pine Wind, and will be supported by capital commitments […]

  • 8 September 2023
    Wind Farm Update

    The Formosa 2 offshore wind farm has officially entered commercial operation, becoming the first Round 2 offshore wind project in Taiwan to achieve commercial operation date (COD). This project, owned by JERA, Green Investment Group (supported by its portfolio company Corio Generation) and Synera Renewable Energy (SRE), has entered the operations & maintenance (O&M) phase […]

  • 22 November 2024
    Business & Finance, Business development, Fixed-Bottom, Research & Development

    Taiwan-based Synera Renewable Energy (SRE) has joined forces with Moondo Wind Energy (MWE) to develop an offshore wind project in the South Sea of South Korea. The two companies have formed a joint venture called Moondo Offshore Wind Energy. This marks Synera’s entry into the South Korean market and its second expansion beyond Taiwan, following […]

  • 14 December 2022
    Authorities, Contracts & Tenders, Wind Farm Update

    Taiwan’s Ministry of Economic Affairs (MOEA) has selected ten offshore wind projects in the first auction of the Round 3 Zonal Development Phase. The ten projects are proposed by: Copenhagen Infrastructure Partners (CIP); Corio Generation and JERA; Northland Power; Synera Renewable Energy (SRE; formerly known as Swancor Renewable Energy); Taiya Renewable Energy and EDF Renewables; and […]