2553 results found for 'Åland'

2553 results found for 'Åland'
Order results by

A list of search results

  • 27 January 2025
    Authorities, Fixed-Bottom, Planning & Permitting

    The Government of Åland is working on establishing an auction process for seabed leasing and concession allocation for offshore wind in the northern maritime areas of Åland. The Åland government recently issued a notice seeking a commercial advisor who would prepare, administer, and manage the auction process for developers interested in building and operating an […]

  • 11 April 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Ports & Logistics

    Euroports Group and the partners behind the Noatun offshore wind project, OX2 and Ålandsbanken Fondbolag, have signed a Letter of Intent (LoI) to establish Koverhar Harbour in Hanko, Finland, as a logistics hub for the construction of the Noatun North offshore wind farm, with an option to use the hub for Noatun South as well. […]

  • 20 February 2025
    Cables, Grid Connection, Project Updates, Wind Farm Update

    The LionLink interconnector, a subsea cable that will connect the future Nederwiek 3 offshore wind farm in the Netherlands to the UK grid and interconnect the two national power networks, is planned to make landfall in Walberswick on its UK side. On 19 February, National Grid Ventures (NGV) said it selected Walberswick as the preferred […]

  • 21 March 2025
    Business & Finance, Cables, Contracts & Tenders, Fixed-Bottom, Grid Connection, Supply Chain

    Hellenic Cables, in a consortium with Asso.subsea, has been awarded a turnkey contract by the French transmission system operator (TSO) Réseau de Transport d’Électricité (RTE) for the Dunkirk offshore wind farm. Hellenic Cables will design, manufacture, and supply 32 kilometres of submarine cables for the double submarine cable link, as well as 38 kilometres of […]

  • 5 February 2025
    Business & Finance, Grid Connection, Offshore Platforms

    The Netherlands-based Conbit has been awarded the contract for the supply and commissioning of an Impressed Current Cathodic Protection (ICCP) system at the SylWin alpha offshore converter station, operated by the Dutch/German transmission system operator (TSO) TenneT. The scope of work includes the design, delivery, and above-water installation of the ICCP system, along with all […]

  • 1 April 2025
    Business & Finance, Fixed-Bottom, Manufacturing, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Vestas has secured a firm order for the Nordlicht 1 offshore wind project in Germany, for which the Danish OEM will deliver 68 of its V236-15.0 MW wind turbines. The total order of 1,020 MW for Vattenfall’s wind farm that has a grid connection capacity of 980 MW includes an additional 40 MW to use […]

  • 17 July 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Supply Chain

    Energy and marine consultancy ABL has been awarded a contract to provide marine warranty survey (MWS) services to Réseau de Transport d’Electricité (RTE) for the installation of the grid infrastructure at France’s Dunkirk offshore wind farm. ABL’s operation in France has been contracted to support the French transmission system operator RTE with the delivery of […]

  • 14 May 2025
    Operations & Maintenance, Ports & Logistics

    UK companies Haventus and Sarens PSG have developed a low-cost solution for the integration and launch of floating offshore wind turbines. Haventus said that it is working to enable offshore wind project developers to acquire fully assembled floating bases and turbines at Ardersier, Scotland, as well as providing dry storage which does not require complex […]

  • 6 March 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Supply Chain

    Ventus Energy has secured two contracts with Ocean Winds to support its Scotland-based offshore wind farms, Moray West and Moray East. The first contract, awarded in September 2024 for Moray West, spans an 18-month period and includes operations and maintenance (O&M) for the offshore transmission owner (OFTO) assets. The scope of work includes timely inspections […]

  • 13 May 2025
    Business & Finance, Contracts & Tenders, Operations & Maintenance, Supply Chain

    Buss Energy Group and Wind Multiplikator have won long-term service contracts for turbines at the Global Tech I offshore wind farm in the German North Sea. Wind Multiplikator will be responsible for servicing and maintenance of the 80 Areva M5000 turbines, from statutory inspections and troubleshooting to commissioning service operation vessel-based (CSOV) logistics and spare […]

  • 29 January 2025
    Business & Finance, Business development, Ports & Logistics, Research & Development

    Haventus, the owner of the Ardersier Port in the Moray Firth, Scotland, has submitted a scoping report to the Highland Council for a proposed extension to its port. Haventus is looking to expand its Ardersier Energy Transition Facility onto nearly 200 acres of land next to the current site. Subject to gaining the necessary approvals, the […]

  • 25 June 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    The Norwegian Water Resources and Energy Directorate (NVE) has identified four more areas as suitable for future offshore wind development, and the government is now conducting consultations on the findings before deciding on which area to move forward. In 2023, the NVE identified 20 offshore wind deployment areas. After evaluating the land, three areas were […]

  • 16 July 2025
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update

    GHD has been appointed to lead the Environmental Impact Assessment (EIA) and approval process for the 1 GW Blue Mackerel offshore wind project, being developed by Parkwind, part of JERA Nex. GHD has a long-standing presence in the Gippsland region, having been part of the community and its infrastructure development for decades, according to the […]

  • 16 July 2025
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    The first section of the export cable for the 1.4 GW East Anglia Three offshore wind farm has been pulled ashore, making landfall at Bawdsey in Suffolk. NKT, which is supplying and installing the export cable for the project under a turnkey contract secured in 2022, started working on East Anglia Three in June, following […]

  • 17 June 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    Geotechnical surveys have commenced for the 240 MW Jammerland Bugt offshore wind farm in Denmark to support the final project design in preparation for construction work. After several months of geophysical surveys, scanning the seabed using 3D measurements, the next step in the development of the Jammerland Bugt offshore wind farm is the launch of […]

  • 14 January 2025
    Grid Connection, Offshore Platforms, Technology

    TenneT has contracted Nokia to provide optical networking technology for eight new 2 GW offshore converter platforms in the Dutch North Sea that will transmit electricity generated by offshore wind farms to the Netherlands. The Dutch-German transmission system operator (TSO) will use the communication network to monitor and manage the remote and uncrewed 2 GW […]

  • 10 February 2025
    Authorities, Floating Wind, Planning & Permitting, Ports & Logistics

    A new bill has been introduced in California’s state legislature that would add an assessment of funding opportunities for offshore wind port infrastructure to the Governor’s Five-Year Infrastructure Plan. Introduced on 6 February, Assembly Bill 472 would amend the definition of “infrastructure” in the California Infrastructure Planning Act to include offshore wind port infrastructure as […]

  • 24 April 2025
    Cables, Contracts & Tenders, Grid Connection, Supply Chain

    The Dutch company, N-Sea Group, has been awarded a contract to repair one of the four export cables that connect the 576 MW Gwynt y Môr offshore wind farm in the UK to the National Grid. N-Sea will be responsible for replacing a five-kilometre section of 132 kV export cable from the onshore transition joint […]

  • 18 April 2025
    Cables, Grid Connection, Onshore Infrastructure, Project Updates

    The first onshore cables have been pulled at a site in Lower Saxony, Germany, for the BorWin4 and DolWin4 grid connection projects, marking the start of the cable laying campaigns, according to cable supplier Prysmian. The DolWin4 and BorWin4 grid connection systems, each with a capacity of 900 MW, will bring offshore wind energy from […]

  • 5 June 2025
    Business & Finance, Floating Wind, Foundations, Ports & Logistics, Supply Chain

    Highlands and Islands Enterprise (HIE) will invest GBP 24.26 million (around EUR 28.81 million) in an upgrade at Kishorn Port that will enable the manufacture of floating wind foundations at the Scottish port. “With the quarry on site, Kishorn Port is ideally suited to concrete manufacturing of floating offshore wind sub-structures, with local content, laydown, marshalling, […]

  • 12 June 2025
    Authorities, Grid Connection, Onshore Infrastructure, Planning & Permitting, Project Updates, Wind Farm Update

    The Delaware State Senate has passed a bill which would allow US Wind to continue planning its onshore substations for the Maryland offshore wind project in Delaware’s Sussex County, whose council denied US Wind the permit last year. Senate Bill 159, introduced in the Delaware Senate on 21 May and discussed by the Senate Environment, […]

  • 29 May 2025
    Infrastructure, Ports & Logistics

    Windar Renovables has laid the cornerstone for a planned offshore wind turbine tower factory in Szczecin, Poland. The facility is scheduled to go into operation in 2026 and will directly create 450 jobs. The factory will serve domestic and global demand and play a key role in supporting the Polish offshore wind sector, said Windar […]

  • 28 January 2025
    Cables, Grid Connection, Manufacturing, Onshore Infrastructure, Project Updates, Supply Chain, Wind Farm Update

    The first batches of high-voltage (HV) 220 kV and extra-high-voltage (EHV) 400 kV onshore cables have been delivered for the Bałtyk 2 and Bałtyk 3 offshore wind farms, which are being jointly developed by Equinor and Polenergia. Poland’s Tele-Fonika Kable (TFK) delivered the first 24 drums, with a total weight of 310 tonnes, to Equinor […]

  • 18 June 2025
    Business & Finance, Grid Connection, Offshore Platforms

    KCI the engineers, a subsidiary of Sif Group, has been awarded a contract for the design of the substructures for LanWin2 and BalWin3 HVDC platforms, part of TenneT’s 2 GW offshore grid connection programme. KCI will deliver jacket structural analysis for LanWin2 and BalWin3, covering the full engineering scope, including concept, basic, and detailed design. […]

  • 10 March 2025
    Business & Finance, Cables, Fixed-Bottom, Grid Connection, Offshore Platforms, Onshore Infrastructure, Project Updates, Wind Farm Update

    The joint venture between SSE Renewables, TotalEnergies and PTTEP has signed an agreement with a consortium of Equitix and Kyuden Group to sell the offshore transmission assets of the Seagreen Phase 1 offshore wind farm in Scotland. The Seagreen 1 transmission assets transmit electricity from the offshore wind farm via three export cables, each approximately […]

  • 7 July 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    Oceanic Wind Energy and its partner, Coast Tsimshian Enterprises (CTE), have been granted an Investigative Use Permit (IUP) for the first phase of an offshore wind project in Hecate Strait, Canada. The permit was granted to the partners for the first phase of development, which could have a capacity between 600 MW and 700 MW. […]