List of the highlighted articles









Svanen Ready for Kriegers Flak Foundation Installation
Van Oord’s heavy lift vessel Svanen has arrived at the Kriegers Flak offshore wind project in Denmar...

OHT's New Heavy Lifter to Install Dogger Bank Foundations
Offshore Heavy Transport (OHT) has been selected as the preferred supplier for the installation of f...

Foundation Installation Begins at Formosa 1 Phase 2
The installation of foundations has kicked off at the Formosa 1 Phase 2 offshore wind project in Tai...

Insights into Wind Turbine Blades in North America: A Conversation with Ken Lee, Fleet Engineering Manager at EDF Renewables
The rapid growth of wind power in North America is driving requirements for longer blades, particula...

Damen to introduce fully electric Service Operations Vessel for offshore wind farm sector
The next step in zero-emission wind farm operationsWith continuously growing energy demands, the nee...

Vibratory Pile Driving Researchers Go Deeper Underground
innogy-led research project to test a new method of installing foundations on offshore wind farms ha...

Beatrice Offshore Construction Kicks Off
Seaway Heavy Lifting (SHL) will begin installing piles for jacket foundations at the Beatrice offsho...

IHC IQIP Equipping SHL for Beatrice Foundation Installation
IHC IQIP will provide jacket pile grippers, the Hydrohammer S-2500 with two specially designed hamme...

AFRY talks about its increasing presence in offshore wind
AFRY and its increasing global presence in Offshore WindIn the past three decades AFRY has actively ...

Ex-Statkraft Engineer Develops New Installation Solution
Arild Bolsø, an engineer who worked for Statkraft in Norway and Forewind in the UK, has developed a ...

Time to take note and take action: Why the ambitious offshore energy targets set for 2050 are a good thing
The world’s population is expected to reach 9.7 billion by 2050, and with it, global energy demand i...