4605 results found for 'technip'

4605 results found for 'technip'
Order results by

A list of search results

  • 5 July 2024
    Business & Finance, Collaboration, Outlook & Strategy

    French Technip Energies and Dutch SBM Offshore have established Ekwil, a 50/50 joint venture company focused on floating offshore wind energy. According to the companies, Ekwil is a pure player delivery partner offering a range of “series production” floating offshore wind solutions to meet the growing needs of energy customers worldwide. “It’s just a question […]

  • 14 March 2024
    Business & Finance, Business development, Collaboration, Outlook & Strategy, Research & Development

    France-headquartered Technip Energies and Dutch-based SBM Offshore have signed a Memorandum of Understanding (MoU) for the creation of a floating offshore wind joint venture, EkWiL. EkWiL will be a floating wind offshore wind pure play, capable of proposing a wide range of solutions to clients, the companies said. “Our aim is to become a recognized […]

  • 5 July 2024
    Business development, Floating Wind, Research & Development

    A research and development (R&D) project focused on reusable floating wind anchoring systems, high and low connectors, and tendons for tension line systems, has been launched in France. The project is led by Technip Energies in partnership with Université Gustave Eiffel, Valeco, and OPEN-C Foundation, and funded by the French State as part of France […]

  • 16 April 2024
    Floating Wind, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    Equinor has selected DNV to provide verification services for FEED (Front-End Engineering and Design) of the substation for the 750 MW Firefly/Bandibuli floating wind farm in South Korea. Announcing the contract for the South Korean project, DNV said that designing and installing floating substations present distinct challenges, including the need for high-voltage dynamic cables and […]

  • 16 May 2024
    Authorities, Business development, Floating Wind, Foundations, Manufacturing, Supply Chain

    Principle Power’s WindFloat, PelaStar, Technip Energies’ INO15, Stiesdal’s Tetra Triple-One, and Esteyco’s WHEEL floating wind platforms are the winners of the second phase of the FLoating Offshore Wind ReadINess (FLOWIN) Prize in the United States, set up to support technologies that can facilitate mass production and deployment of floating wind turbines. Each of the five […]

  • 26 April 2024
    Business & Finance, Business development, Outlook & Strategy, Vessels

    In what is described as a “strong start of the year”, Dutch geo-data specialist company, Fugro, reported a 9 per cent revenue growth for the first quarter of 2024 compared to the same period last year, said to be due to ongoing significant growth in offshore wind projects. Revenue in the first quarter was EUR […]

  • 23 July 2024
    Authorities, Floating Wind, Planning & Permitting

    The Moroccan Agency for Sustainable Energy (Masen) has been exploring the construction of a pilot offshore wind farm off the coast of Essaouira which, if built, would be Morocco’s first offshore wind farm. This is according to information shared in competitive tender notices for technical assistance for an offshore wind feasibility study, issued by the European […]

  • 6 February 2024
    Business development, Contracts & Tenders, Fixed-Bottom, Research & Development, Supply Chain

    The Dutch company, Ventolines, has won a public tender to consult the team behind the Estonian-Latvian cross-border offshore wind project, ELWIND, in executing the next practical steps in de-risking the offshore areas. By winning the tender and signing the agreement, Ventolines took the position of technical consultant for the 1 GW ELWIND offshore wind project. […]

  • 13 March 2024
    Business & Finance, Jobs & Recruitment, Operations & Maintenance

    Energa Wytwarzanie, an Orlen Group subsidiary, and Northland Power have established a company, Baltic Offshore Service Solution, to provide a range of offshore wind services in Poland. The new company will offer a range of services tailored to the offshore wind energy sector, encompassing technical, operational, commercial, and contractual aspects. Additionally, Baltic Offshore Service Solution […]

  • 23 July 2024
    Business development, R&D, Research & Development, Technology

    Norway’s Wind Catching Systems (WCS) has received Approval in Principle (AiP) from DNV for its 40 MW Windcatcher design, which the company says is an important milestone on the route to commercial demonstration of its Windcatcher technology. The objective of an AiP is to perform a third-party technical evaluation of a design to assess whether […]

  • 27 February 2024
    Business & Finance, Fixed-Bottom, Project Updates

    Wando Geumil Offshore Wind, the company developing the 600 MW Wando Geumil offshore wind farm in South Korea, whose majority shareholder is KOEN (Korea South-East Power Company), has awarded a contract for operations & maintenance (O&M) strategy consultancy services to Yooshin Engineering Corporation. Yooshin has subcontracted Pondera Consult to support the work that aims to […]

  • 31 May 2024
    Business development, Environment, Floating Wind, R&D, Research & Development

    A new collaborative marine research initiative has started, focusing on identifying innovative designs and best practices for monitoring and mitigating underwater noise associated with floating offshore wind farms. Offshore Renewable Energy (ORE) Catapult’s Floating Offshore Wind Centre of Excellence (FOW CoE) will work alongside project partners Equinor, JASCO Applied Sciences, Scottish Association for Marine Science […]

  • 9 July 2024
    Authorities, Planning & Permitting

    The auction for Saare 3, Estonia’s third offshore wind farm area, received no bids, as announced by the country’s Consumer Protection and Technical Regulatory Authority (CPTRA) on July 4th. In its most recent offshore wind tender, Estonia aimed to grant the Saare 3 sea area, covering 20.1 square kilometres, with a starting bid price of […]

  • 10 July 2024
    Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif, will be using a new welding technique in the production process of XXXL monopiles in its new production halls on the Maasvlakte, Rotterdam. The Cold Wire Tandem-Twin Narrow Gap SAW (CWTT-NGSAW) process is said to make welded joints stronger and welded connections more durable. The method was developed by Sif’s […]

  • 8 May 2024
    Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Romania’s independent energy company Black Sea Oil & Gas (BSOG) has completed an offshore wind feasibility study of potential areas in the Romanian sector of the Black Sea. Last year, BSOG and its Midia Gas Development (MGD) partners revealed plans to use their existing MGD infrastructure to connect up to 3 GW of offshore wind […]

  • 17 June 2024
    Business & Finance, Supply Chain

    UK-headquartered Offshore Wind Consultants (OWC) and renewable energy project management company Bridge Wind Management have entered into a strategic alliance that will see the two partners providing a one-stop-shop solution for asset and operational management for offshore wind projects. OWC and Bridge said their aim was to enable more informed decision-making for offshore wind investors by […]

  • 22 April 2024
    Authorities, Planning & Permitting, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    The New York State Energy Research and Development Authority (NYSERDA) has cancelled three offshore wind projects with a combined capacity of over 4 GW due to ”technical and commercial complexities between provisional awardees and their partners,”. In October 2023, NYSERDA provisionally awarded three offshore wind projects, subject to successful conclusion of contract negotiations. These provisionally […]

  • 6 June 2024
    Business & Finance, Business development, Collaboration, Outlook & Strategy, Research & Development

    The Netherlands’ Pondera Consult and ENMARO (Energy Market Observer sp. z o.o.) have signed an agreement to jointly source, define, and target potential offshore wind project opportunities in Poland, leveraging their combined products and services as a consortium. The agreement was signed in Świnoujście, Poland, during the Polish Wind Energy Association (PWEA) Conference by Andrzej […]

  • 1 July 2024
    Authorities, Business & Finance, Business development, Fixed-Bottom, Planning & Permitting, Research & Development

    Just days after acquiring its first offshore wind site in Estonia, Norway’s Deep Wind Offshore has secured another area in the Estonian part of the Baltic Sea with a winning bid starting at approximately EUR 1.33 million. Estonia’s Consumer Protection and Technical Regulatory Authority (CPTRA) announced on 28 June that Deep Wind Offshore is the […]

  • 4 March 2024
    Fixed-Bottom, Green Hydrogen, Planning & Permitting, Power-to-X, Storage

    Ramboll has been appointed to deliver advisory and technical support for the 600 MW Agnes Romagna offshore wind project, proposed to be built in the Italian sector of the Adriatic Sea and planned to integrate several other systems, including floating photovoltaic, battery storage and a hydrogen production plant. Ramboll’s team will support the developer, Italian […]

  • 17 July 2024
    Grid Connection, Industry, Innovation, Onshore Infrastructure

    The four German transmission system operators (TSOs), 50Hertz, Amprion, TenneT, and TransnetBW, and transmission system suppliers Siemens Energy, GE Vernova, and Hitachi Energy, have entered into a partnership to develop direct current (DC) multiterminal hubs that are said to enable an efficient utilisation and distribution of large amounts of electricity generated by offshore wind farms. […]

  • 29 April 2024
    Business development, Grid Connection, Outlook & Strategy, R&D, Wind Turbines

    Commissioning is a critical phase in the development of offshore wind farms, marking the transition from construction to operation. A well-defined commissioning strategy is essential to ensure the seamless integration of various components, validate their functionality, and ultimately optimize the performance and reliability of the entire offshore wind farm. Boslan, an engineering and consultancy company […]

  • 9 July 2024
    Business & Finance, Contracts & Tenders, Supply Chain, Vessels

    Damen Shipyards has secured a contract to build the sixth hydrogen dual-fuel Commissioning Service Operation Vessel (CSOV) for the crew transfer vessel operator Windcat. Damen will build the sixth CSOV at Ha Long Shipyard in Vietnam, where construction of the first five newbuilds is currently underway at various stages. The first vessel is planned to […]

  • 4 June 2024
    Cables, Contracts & Tenders, Operations & Maintenance, Supply Chain

    Ørsted has awarded three multi-year framework agreements for fault-finding, diagnostic and dry repair of cables at its offshore wind farms in the UK, the US, and Taiwan to Correll Group. The agreements have been signed for an initial period of three years and Ørsted has also selected the UK-based Correll Group, a subsidiary of the […]

  • 28 May 2024
    Cables, Grid Connection, Offshore Platforms, Operations & Maintenance, Project Updates, Wind Farm Update

    The repairs on the cable linking the 309 MW Rentel offshore wind farm to mainland Belgium have been completed about four months after it failed. The fault was located just below the Rentel transformer platform, said the Belgian transmission system operator (TSO) Elia. A new section of the cable, approximately 400 metres long, was attached to […]

  • 12 July 2024
    Market Outlooks, Outlook & Strategy, Research & Development, Technology, Wind Turbines

    Researchers at the U.S. National Renewable Energy Laboratory (NREL) have found that using electricity generated by offshore wind turbines to split water to produce clean hydrogen may make economic sense.