1184 results found for 'Hywind Demo'

1184 results found for 'Hywind Demo'
Order results by

A list of search results

  • 9 April 2026
    Vessels

    DEME recently held a naming ceremony for its new offshore wind turbine installation vessel (WTIV), Norse Wind, at the Port of Oslo, Norway. The new vessel was ordered from CIMC Raffles Shipyard in China by Norwegian offshore wind contractor Havfram, which DEME acquired in April 2025, and was delivered in October last year. The vessel […]

  • 4 August 2026
    Authorities, Business development, Floating Wind, Planning & Permitting, Project Updates, Research & Development, Wind Farm Update

    Cierco Energy has signed an Agreement for Lease with the Crown Estate for its two test and demonstration projects off Wales, named Llŷr 1 and Llŷr 2, which are expected to use two different types of floating wind technology. The Llŷr projects were selected for development in 2021 in the Crown Estate’s leasing opportunity for early commercial-scale […]

  • 29 May 2026
    Contracts & Tenders, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    DEME has secured a contract for the offshore installation of wind turbines at the Oga–Katagami–Akita offshore wind project site in Japan through its joint venture with Penta-Ocean Construction, called Japan Offshore Marine (JOM). Under the contract, JOM will carry out engineering works and provide vessel charter services for the installation of 21 Vestas V236-15 MW […]

  • 18 February 2026
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Supply Chain, Wind Farm Update

    DEME has awarded Hellenic Cables with a contract for the supply of inter-array cables for the 390 MW BC-Wind offshore wind project in Poland, developed by Ocean Winds. Under the contract, the Greece-based manufacturer will be responsible for the design, engineering, manufacturing, testing, and supply of approximately 70 kilometres, including spares, of 66 kV inter-array […]

  • 10 June 2026
    Ports & Logistics, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    Towers, nacelles and blades for SG 14-236 DD wind turbines are arriving at Mukran Port on the German Baltic Sea coast, from where they will be installed at Iberdrola’s Windanker offshore wind farm. The 315 MW Windanker will comprise 21 turbines, equipped with Siemens Gamesa’s Power Boost, which will enable each turbine to deliver approximately […]

  • 13 April 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    Geoquip Marine Operations and GEO Denmark are set to start a geotechnical investigation campaign at the Bowdun offshore wind farm site in Scotland, developed by Thistle Wind Partners. Two vessels, Geoquip Seehorn and Geo Connector, will be used to perform the surveys, with the work expected to commence on 19 April. The campaign will be […]

  • 30 July 2026
    Fixed-Bottom, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    CS Wind Offshore has sent off the first batch of transition pieces (TPs) for Vattenfall’s Nordlicht I offshore wind farm from its site at the Port of Aalborg to Germany. Weighing around 362 tonnes each, the transition pieces will be transported and installed at the project site in the German North Sea by DEME, which […]

  • 20 July 2026
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update

    DEME has been awarded a contract by the Zeevonk joint venture, comprising Vattenfall and Copenhagen Infrastructure Partners (CIP), to transport and install foundations for the first phase of the 2 GW Zeevonk offshore wind project in the Dutch North Sea. Under the contract, which remains subject to a final investment decision (FID), DEME will provide […]

  • 14 May 2026
    Project Updates, Supply Chain, Vessels, Wind Farm Update

    DEME’s new jack-up offshore installation vessel Norse Energi is preparing to begin work on offshore wind projects in the Baltic Sea and North Sea, with its first assignments lined up for Iberdrola’s Windanker offshore wind farm in Germany and Ørsted’s Hornsea 3 in the UK. The vessel, officially named on 12 May at DEME’s base […]

  • 15 June 2026
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    The first wind turbine has been installed at the Dieppe-Le Tréport offshore wind farm, located 15 kilometres off the city of Le Tréport and 17 kilometres off the city of Dieppe in France. Ocean Winds, the project’s majority shareholder, said on 15 June that the wind farm, whose offshore substation was installed last year, would […]

  • 10 April 2026
    Business & Finance, Fixed-Bottom

    Part of the operative management of Arenso Oy has acquired the company’s offshore wind business, including its brand, bringing a new reshuffle following the 2024 demerger of Suomen Hyötytuuli Oy. Under the transaction, Arenso’s offshore wind team, along with its foundation technology and bird radar expertise, has been transferred to the new company. The deal […]

  • 5 August 2026
    Cables, Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    Two offshore construction milestones have been completed at the 495 MW Fengmiao 1 offshore wind farm in Taiwan, with Jan De Nul finalising the export cable connection to the offshore substation and CDWE completing the installation of the offshore substation and its foundation. Jan De Nul said on 5 August that its cable-laying vessel (CLV) […]

  • 19 March 2026
    Floating Wind, Industry

    Japan’s Floating Offshore Wind Power Technology Research Association (FLOWRA) and Lloyd’s Register have entered into a collaboration agreement to explore joint work on floating offshore wind development. Under the agreement, structured as a Memorandum of Understanding (MoU), the two parties will explore technology development cooperation in the field of floating offshore wind, according to a […]

  • 30 June 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    DEME has completed the installation of the jacket foundations at the Dieppe-Le Tréport offshore wind farm in France, developed by Eoliennes en Mer Dieppe Le Tréport (EMDT), a joint venture between Ocean Winds, Sumitomo Corporation, and Banque des Territoires. The first of the 62 wind turbine foundations was installed at the project site, located 15 […]

  • 20 July 2026
    Project Updates, Wind Farm Update

    Fallpipe vessel (FPV) Flintstone is about to commence rock installation work at Dogger Bank C, the third phase of the 3.6 GW Dogger Bank Wind Farm, owned by SSE Renewables, Equinor, and Vårgrønn. The vessel, owned by DEME, will supply, transport, and install scour protection at various locations on Dogger Bank C, starting operations on […]

  • 4 August 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    Following the installation of the first monopile at the beginning of July, the first transition piece (TP) has now also been installed at Vattenfall’s Nordlicht I offshore wind farm in the German North Sea.  DEME is handling the transport and installation of the monopiles and TPs under a contract awarded in 2024/2025. The transition pieces […]

  • 30 March 2026
    Fixed-Bottom, Project Updates, Wind Farm Update

    The first preparations ahead of offshore construction work at the OranjeWind project site in the Netherlands have begun, as Jan De Nul has started the filter layer installation campaign. In the coming weeks, the rock installation vessel Simon Stevin will install the first layer of erosion protection, which is essential to enable the subsequent installation […]

  • 18 June 2026
    Energy Islands, Fixed-Bottom, Grid Connection, Infrastructure, Project Updates

    Seventeen of the total of 23 caissons have been installed at the Princess Elisabeth Island site, 45 kilometres off the Belgian coast, where TM Edison, a consortium of DEME and Jan De Nul, is building the first artificial energy island in the world. Developed by Belgium grid operator Elia Group, Princess Elisabeth Island will serve […]

  • 14 July 2026
    Ports & Logistics, Project Updates, Supply Chain, Wind Farm Update

    OranjeWind, the joint venture between RWE and TotalEnergies, has signed a Port & Agency Services agreement with Clarkson Port Services BV for the construction and commissioning phase of its OranjeWind offshore wind farm in the Netherlands. Various port locations are involved during this phase, where the monopile and secondary steel structure loadouts will take place […]

  • 7 May 2026
    Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Thistle Wind Partners (TWP) has submitted the offshore consent application for its Bowdun offshore wind farm to the Scottish Government’s Marine Directorate. Located off the north-east coast of Scotland, 44 kilometres from Stonehaven in Aberdeenshire , the fixed-bottom offshore wind farm is planned to have up to 67 wind turbines and an installed capacity of up […]

  • 8 June 2026
    Fixed-Bottom, Operations & Maintenance, Project Updates, Supply Chain, Vessels, Wind Farm Update

    OranjeWind, the joint venture between RWE and TotalEnergies, has signed a five-year charter agreement with Purus for the deployment of the construction service operation vessel (CSOV) Purus Power at the OranjeWind offshore wind farm in the Netherlands. Under the agreement, which includes an extension option, the vessel will support both planned and unplanned operations and […]

  • 2 July 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    DEME installed the first monopile at the Nordlicht I offshore wind farm site in the German North Sea on 1 July, marking the start of offshore construction on Vattenfall’s 1.6 GW Nordlicht cluster. The Belgian contractor is responsible for transporting and installing the monopile foundations and transition pieces for both the 980 MW Nordlicht I […]

  • 11 June 2026
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    DEME has installed the first wind turbine at RWE’s Nordseecluster A site, the first phase of the 1.6 GW Nordseecluster offshore wind project in the German North Sea. Installation is being carried out by DEME’s vessel Norse Wind, which is capable of transporting and installing up to five turbine sets per cycle. The 660 MW […]

  • 23 April 2026
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    Vattenfall has initiated a transition piece mock-up for its Nordlicht offshore wind project at CS Wind Offshore’s facility in Aalborg, Denmark, as part of preparations for offshore installation works. The onshore testing programme is designed to simulate key installation, safety and working procedures before offshore construction begins. The transition pieces, manufactured by CS Wind Offshore […]

  • 16 February 2026
    Contracts & Tenders, Energy Islands, Grid Connection, Onshore Infrastructure, Supply Chain

    Belgian transmission system operator (TSO) Elia has opened a tender for civil construction works on the Princess Elisabeth Energy Island, the world’s first artificial energy island. The TSO is looking for a contractor carry out the works required to host AC and related infrastructure on Princess Elisabeth Island (PEI) in the Belgian exclusive economic zone […]

  • 12 March 2026
    Business development, Floating Wind, Foundations, Innovation, Supply Chain, Technology

    US-based floating wind foundation developer Aikido Technologies has announced two developments linking its floating wind platform with artificial intelligence (AI), including the launch of an AI-focused offshore data centre platform and its selection for an AI startup programme run by NVIDIA. The company recently unveiled AO60DC, a floating offshore wind platform designed to co-locate renewable […]