10000 results found for 'wind'

10000 results found for 'wind'
Order results by

A list of search results

  • 12 September 2012
    Grid Connection

    Oceanteam Shipping has announced a joint venture with WIND B.V. from the Netherlands to offer a complete range of submarine cable storage and handling services to cable manufacturers, contractors and operators. OceanWind Cable Storage Solutions joint venture provides, at its cable facility in Velsen, The Netherlands, submarine cable storage and handling services, such as: – […]

  • 8 November 2021
    Contracts & Tenders, Wind Farm Update

    Taylor Hopkinson has been awarded a contract to supply freelance on-site commissioning services at the Fécamp offshore wind farm in France. The company will supply electrical safety personnel throughout the commissioning phase including, but not limited to, SAPs, Control Engineers, SCADA Supervisors and WTG Commissioning Supervisors. The works will commence next month and will run […]

  • 7 March 2014
    Business & Finance

    Bladt Industries has announced its participation in the EWEA conference and exhibition taking place from the 10th to the 13th of March 2014 in Barcelona. The company is deeply involved in the offshore wind energy development in Europe, but not only there. Bladt’s latest big achievement is the recently signed contract with the developers of […]

  • 16 September 2022
    Environment, Wind Farm Update

    Poland’s PGE Baltica, a PGE Group company, has entered the stage of environmental surveys for the Baltica 1 offshore wind farm located approximately 80 kilometres from the Polish Baltic coast. The research will be carried out by a consortium of the Gdynia Maritime University and MEWO S.A., which will also prepare an environmental report and […]

  • 24 September 2019
    Authorities, Wind Farm Update

    The Danish Energy Agency (DEA) has decided that a Strategic Environmental Assessment must be completed prior to submission of final bids for the Thor offshore wind farm. In addition to this, comprehensive environmental assessments are still to be carried out prior to final bids. Later, the winner of the concession will have to carry out […]

  • 20 July 2022
    Ports & Logistics, R&D, Technology

    Saitec Offshore Technologies and RWE have loaded out and launched the prototype DemoSATH floating wind turbine at Punta Sollana quay in the Port of Bilbao, Spain. The DemoSATH unit was loaded onto the semisubmersible barge’s deck by means of Self-Propelled Modular Transporters. The barge was then ballasted down lower into the water until the DemoSATH […]

  • 13 February 2025
    Authorities, Business development, Planning & Permitting, Research & Development

    At the end of last year, the Federal Maritime and Hydrographic Agency (BSH) and the Deutscher Wetterdienst (DWD) launched a multi-year measurement campaign to collect wind and sea data in an area approximately 280 kilometres off the German North Sea coast. Since mid-December 2024, Fugro Norway, contracted for this purpose, has been collecting comprehensive wind […]

  • 13 May 2022
    Environment, Wind Farm Update

    Greenalia has completed the geophysical survey for its 50 MW Parque Eólico (PE) Gofio floating offshore wind project in Spain. The campaign was conducted off the coast of San Bartolomé de Tirajana in the Canary Islands, where Greenalia expects to install its first floating wind farm. The results of this campaign have confirmed the analysis […]

  • 25 June 2018
    Technology

    Offshore Renewable Energy (ORE) Catapult has welcomed UK Minister for Arts, Heritage and Tourism, Michael Ellis, at the Immersive Hybrid Reality (iHR) Offshore Wind Turbine.

  • 21 August 2014
    R&D, Technology, Wind Farm Update

    In a few months, the first of a new generation of concrete foundations will be installed for the first time in the English Channel. Optimised production methods and easy installation concept opens up the possibility of major deepwater offshore wind turbine parks. There was applause all round when the base plate for the prototype for […]

  • 3 December 2020
    Business & Finance, Wind Farm Update

    Polish energy company PKN ORLEN is holding an online meeting with potential supply chain companies for its offshore wind farm project in the Baltic Sea. PKN Orlen, through its subsidiary Baltic Power, holds a license to build wind farms with a maximum total capacity of up to 1,200 MW at a circa 131 km2 area […]

  • 5 July 2021

    The fifth and final 9.525 MW floating wind turbine has been connected to its moorings some 15 kilometres southeast of Aberdeen, Scotland. The Kincardine 05 floating platform was connected to its moorings over the past weekend, First Subsea said. First Subsea, who provided platform mooring connectors and the Cable Protection Systems for the project, said […]

  • 19 March 2019
    R&D, Technology

    Spanish energy engineering company Norvento has begun conducting validation tests of a new offshore wind turbine prototype. According to Norvento, the prototype represents a more efficient and smaller generator that allows the reduction in the weight and size of offshore wind turbines. The prototype is being tested in the technology premises at Norvento Enerxía Innovation Centre […]

  • 13 March 2023
    Contracts & Tenders, Wind Farm Update

    Van Oord has disclosed that the company and its subsidiaries won two major and previously undisclosed offshore wind contracts in 2022. The first contract, provisional in its nature, was secured in December 2022 and pertains to ”the Hollandse Kust West” offshore wind project in the Netherlands. Van Oord did not reveal any additional details about […]

  • 15 November 2023
    Authorities, Collaboration, Outlook & Strategy, Planning & Permitting

    The Ventyr Energy consortium has submitted the application to prequalify for the development of an offshore wind project in the Sørlige Nordsjø II (Southern North Sea II) area in the Norwegian North Sea. In addition, Ventyr unveiled that Ingka Investments is to join the consortium. The Ventyr Energy consortium was first established as a partnership […]

  • 30 November 2021
    Authorities, Environment, Wind Farm Update

    The Danish Energy Agency (DEA) and Hvidovre Municipality have opened public consultation on the environmental impact report for the Aflandshage offshore wind farm, an up to 300 MW project being developed by HOFOR in the Øresund Strait, some ten kilometres from the southern tip of Amager. The DEA and Hvidovre Municipality have invited the public […]

  • 9 August 2019
    Business & Finance

    Northland Power reported a 6% increase in adjusted EBITDA in the second quarter of 2019, to CAD 194 million, partly impacted by the Gemini offshore wind farm. The company stated the rise is partly caused by a CAD 6 million increase at Gemini, due to an adjustment of CAD 7.3 million recorded in the second quarter […]

  • 17 March 2022
    Environment, R&D, Technology

    The ZEBRA (Zero wastE Blade ReseArch) consortium has produced the first prototype of its 100 per cent recyclable wind turbine blade. Within the project, LM Wind Power, a GE Renewable Energy Business, has designed and built the world’s largest thermoplastic blade at its Ponferrada plant in Spain. This milestone is achieved after a year of […]

  • 27 July 2018
    Business & Finance

    Naval Energies has decided to stop investing in tidal energy, a market said to be in the process of closing, and focus on floating offshore wind, as well as ocean thermal energy conversion.

  • 29 August 2023
    Contracts & Tenders, Fixed-Bottom, Wind Farm Update

    Fugro has been awarded two geotechnical investigation contracts for the development of the Dutch Nederwiek wind farm sites II & III (noord). The contracts, awarded by the Netherlands Enterprise Agency (RVO), are part of the Dutch government’s Offshore Wind Energy Roadmap 2030/31, which aims to accelerate the development of offshore wind in the Netherlands. Once […]

  • 17 November 2015

    Siemens presented a new offshore logistics concept at EWEA 2015 in Paris. The company has signed a long-term framework contract with transport service provider deugro Danmark A/S, utilizing two purpose-built transport vessels to efficiently link Siemens’ existing production locations in Denmark with the new production facilities in Cuxhaven in Germany and Hull in the UK. Instead of loading […]

  • 7 July 2014
    Business & Finance

    Gamesa and AREVA signed binding agreements for the creation of a joint venture in the promising offshore wind energy industry, culminating the exclusive talks initiated last January. The closing of the transaction is expected to be secured by the fourth quarter of this year, subject to approval by the French government and the relevant competition […]

  • 26 January 2021
    Business & Finance

    Fugro and NYK Group have signed a strategic Memorandum of Understanding (MoU) with Japanese geoscience specialist OYO Corporation (OYO). Back in November 2020, Fugro and NYK signed an MoU to jointly provide offshore geotechnical services in Japan, with an option to jointly operate a specialist investigation vessel for renewables projects. Fugro, NYK, and OYO will […]

  • 15 January 2021
    Vessels

    Huisman has signed a Letter of Intent with Yantai CIMC Raffles Offshore Ltd. for the delivery of a 2,600mt Leg Encircling Crane for OIM Wind’s BT-220IU Wind Installation Unit. With its 140-metres-long boom and 2,600mt lifting capacity, this crane enables OIM Wind to install the next generation wind turbine generators and foundations safely and efficiently, […]

  • 12 February 2020
    Jobs & Recruitment, Training & Education

    Teesside University and innogy’s Sofia Offshore Wind Farm have signed an agreement setting out how they will work together to build local skills and capabilities to equip students for careers in the offshore wind sector. The 1.4 GW Sofia project will be constructed on a 593km2 site 195 kilometres from shore on Dogger Bank in […]

  • 11 February 2021
    Wind Farm Update

    Around 20 per cent of foundations has been installed at the 1.4 GW Hornsea Two, which is soon to become the world’s largest offshore wind farm, Ørsted said. The export cable installation works are on schedule and turbine installation is set to commence in the second half of this year, the project’s owner and developer […]