1075 results found for 'seamade'

1075 results found for 'seamade'
Order results by

A list of search results

  • 8 June 2021
    Vessels

    Cemre Shipyard has delivered Groenewind, DEME’s first-ever service operations vessel (SOV), to its owner. “DEME’s first dedicated and world’s first SWATH type service operation vessel Groenewind that will serve 3 different windfarm sites is delivered to her client”, the Turkish shipbuilder said via social media on 6 June. Groenewind (green wind) features a Small Waterplane Area […]

  • 1 December 2020
    Wind Farm Update

    The wind turbine installation at the SeaMade offshore wind farm was completed on 30 November, with the 58th and final unit erected at the project site located 50 kilometres off the Belgian coast in the North Sea. DEME, the EPCI contractor for the project, started installing the foundations in September 2019, using its jack-up vessel […]

  • 1 October 2020
    Vessels

    DEME has launched its first ever Service Operation Vessel (SOV) at the CEMRE shipyard in Yalova, Turkey. The vessel, named Groene Wind, is of the Small Waterplane Area Twin Hull (SWATH) class and will be directly chartered to Siemens Gamesa for maintenance activities at the Rentel and SeaMade offshore wind farms in Belgium, once delivered […]

  • 13 October 2020
    Wind Farm Update

    Windar has sent off the last wind turbine tower sections for the SeaMade offshore wind project in Belgium. Special purpose vessel Rotra Ventre set sail with the last six tower sections from Windar’s facilities in the port of Avilés, Spain, to the Port of Ostend, where the REBO sites are serving as storage and pre-assembly […]

  • 13 March 2020
    Grid Connection, Wind Farm Update

    Scaldis Salvage & Marine Contractors is currently preparing for the installation of the second offshore substation at the SeaMade wind farm in Belgium. The 487MW SeaMade wind farm is a combination of the 235MW Mermaid and the 252MW Seastar offshore wind projects. This second topside, which recently arrived in Vlissingen, the Netherlands, will be installed at the Seastar […]

  • 12 September 2019
    Wind Farm Update

    DEME Group’s jack-up vessel Innovation has installed the first foundation at the SeaMade offshore wind farm in Belgium. DEME is picking up the monopile foundations at Sif’s Maasvlakte terminal in Rotterdam and is in charge of installing all 58 pieces at the project site some 50km off the coast from Ostend. The company is also responsible for […]

  • 5 June 2019
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Hartlepool-based JDR Cables has signed a contract with DEME Offshore to provide inter-array cables and accessories for the SeaMade offshore wind farm in the Belgian North Sea. JDR, part of the TFKable Group, will design, manufacture and deliver 78.1 kilometres of aluminium core inter-array cables and a range of cable accessories, including repair joints and connectors. […]

  • 3 March 2020
    Grid Connection, Wind Farm Update

    The first of two offshore substations for the SeaMade offshore wind farm has left Engie Fabricom’s construction yard in Hoboken and is on its way towards the project site in the Belgian North Sea. The 487MW SeaMade wind farm is a combination of the 235MW Mermaid and the 252MW Seastar offshore wind projects. The 1,200t topside, […]

  • 19 November 2019
    Contracts & Tenders, Grid Connection

    JECS Offshore Services has secured a contract to provide support to Hellenic Cables during termination works on the export cables at the SeaMade offshore wind farm in Belgium. JECS Offshore will design, supply and erect the scaffolding access platforms required for technicians to prepare and position the cables and carry out the terminations of the […]

  • 15 October 2020
    Business & Finance, Contracts & Tenders, Wind Farm Update

    International chemical company Borealis has signed a long-term power purchase agreement (PPA) with Eneco to source renewable electricity from the Mermaid offshore wind farm in the Belgian North Sea. The agreement entails the purchase and supply of over 1,000 gigawatt-hours (GWh) of wind power over the next decade, with delivery to begin in January 2021. […]

  • 23 May 2019
    Ports & Logistics

    Dutch offshore foundations manufacturer Sif has expanded its offering of services to cover bolting tests. Sif added the offering after a request from DEME Group to arrange all preparations for the test as part of the work scope for the Belgian SeaMade offshore wind project. During this test, the bolted flange connection between a monopile and […]

  • 27 September 2018
    Authorities, Business & Finance, Wind Farm Update

    The European Commission has approved under EU State aid rules Belgium’s support of a maximum of EUR 3.5 billion for three offshore wind projects in the Belgian North Sea.

  • 6 April 2020
    Wind Farm Update

    Deugro has completed loading the second shipment of wind turbine towers for the SeaMade offshore wind farm at the Port of Avilés in Spain.

  • 27 May 2020
    Grid Connection, Wind Farm Update

    DEME Group has completed inter-array cable laying works at the SeaMade offshore wind farm in Belgium. DEME’s DP3 cable installation vessel Living Stone laid 64 inter-array cables with a total length of 71.2km. According to the company, the vessel operated at peak production levels, laying up to three cables per day. To remind, the inter-array […]

  • 10 March 2020
    Grid Connection, Wind Farm Update

    The second offshore substation for the SeaMade wind farm has arrived in Vlissingen, the Netherlands, from where it will leave for installation off Belgium. The substation destined for the Seastar offshore wind concession completed its trip from Engie Fabricom’s construction yard in Hoboken, Belgium, to the Netherlands yesterday, Otary said. According to the company, the […]

  • 7 January 2020
    Wind Farm Update

    DEME Group has completed the installation of 58 turbine foundations and two substation foundations at the SeaMade offshore wind project in Belgium. DEME’s jack-up vessel Innovation installed the last monopile foundation at the project site some 50km off the coast from Ostend on 2 January. According to the company, a new monopile gripper was deployed onboard […]

  • 26 March 2020
    Wind Farm Update

    The first two turbine towers destined for the SeaMade offshore wind project have arrived at the Port of Ostend, Belgium. According to Otary, the first six tower parts arrived in Belgium on 24 March from the port of Aviles in Spain onboard the special purpose vessel Rotra Vente. Over the coming months, Rotra Vente and […]

  • 27 April 2020
    Wind Farm Update

    The first of the 58 turbine towers for the SeaMade offshore wind project has been upended at the Port of Ostend, Belgium. According to the project developer, the installation of the Siemens Gamesa 8.4 MW turbines will start on 15 June. The first tower parts arrived in Belgium in mid-March from the port of Aviles […]

  • 3 August 2018
    Business & Finance

    The European Investment Bank (EIB) has agreed to provide an undisclosed amount of funding for the construction of the Seamade offshore wind farm in the Belgian North Sea.

  • 28 August 2019
    Vessels

    DEME Group’s jack-up vessel Innovation is undergoing a final stage of a maintenance and repair program at the Damen Verolme yard in Rotterdam, the Netherlands. The photo shows the vessel during full height jacking trials at the yard. Following the jacking trials and final tests, Innovation will head to ”a full schedule of work”, which […]

  • 14 April 2020
    Wind Farm Update

    DEME’s cable installation vessel Living Stone has started the inter-array cabling work at the SeaMade offshore wind farm.

  • 14 May 2020
    Wind Farm Update

    Manor Renewable Energy (MRE) has signed a contract with Siemens Gamesa to provide temporary power provision during the turbine commissioning phase at the SeaMade offshore wind farm. “Following several successful European temporary power provision projects over the recent past, we are looking forward to once again working with Siemens Gamesa; it’s a combination that works,” […]

  • 18 June 2020
    Ports & Logistics, Vessels, Wind Farm Update

    DEME Offshore’s jack-up Apollo has left the REBO terminal in Oostende loaded with the first set of turbine components to be installed on the 487 MW SeaMade wind farm offshore Belgium. Apollo arrived at the REBO heavy load terminal in the Port of Oostende on 14 June, after undergoing spudcan shoes extension at Damen Shiprepair […]

  • 11 December 2018
    Business & Finance, Grid Connection, Wind Farm Update

    Eneco has concluded a long-term power purchase agreement (PPA) for the SeaMade offshore wind project in Belgium.

  • 6 November 2018
    Grid Connection, Vessels

    Seaway Heavy Lifting’s Oleg Strashnov has started installing the jacket foundation for Elia’s Offshore Switchyard Platform (OSY) in the Belgian North Sea.

  • 31 March 2020
    Contracts & Tenders, Ports & Logistics, Wind Farm Update

    Siemens Gamesa has hired Muehlhan Wind Service (MWS) to provide pre-assembly and ground logistics for the SeaMade offshore wind farm project in Belgium. Under the contract, MWS will pre-assemble 58 Siemens Gamesa 8.4MW wind turbines prior to their transportation and installation at the site located 38-50 kilometres off the coast of Oostende. The turbine pre-assembly […]