540 results found for 'windanker'

540 results found for 'windanker'
Order results by

A list of search results

  • 3 July 2012
    R&D

    Last week construction started on the first turbine at the Wagenborg Stevedoring premises. A huge crawler crane (type LR13000) with power boom took care of spectacular lifting work and could be seen from afar. When the construction of the first windmill is finished, the crane will be (partially assembled) moved  to the location of the […]

  • 29 May 2017
    Wind Farm Update

    The first two of the five SPAR-type floating foundations built by the Navantia-Windar consortium for Statoil’s 30MW Hywind Scotland floating wind farm have arrived to the project’s assembly base in Stord, Norway. The two floating foundations were loaded onto the semi-submersible vessel Albatross at Navantia’s Fene shipyard in Spain in early May. The two foundations […]

  • 26 February 2017
    Business & Finance, Environment, Grid Connection, Operations & Maintenance, R&D, Technology, Training & Education, Vessels, Wind Farm Update

    Shell Eyes More Action in European Offshore Wind The Netherlands-based oil and gas giant, Shell, is looking to get on board further projects across Europe as it aims to dive deeper into the offshore wind market. Hywind Foundations On a Roll (Photos) The Navantia-Windar team has started the roll-out of the spar-type floating foundations built […]

  • 26 August 2019
    Contracts & Tenders, Operations & Maintenance

    Trianel Windkraftwerk Borkum has issued a tender for the provision of turbine monitoring, repair, and maintenance services on the 200MW Trianel Windpark Borkum II offshore wind farm in the German North Sea. Currently under construction, the wind farm will comprise 32 Senvion 6.2M152 turbines installed on monopile foundations at the site some 45 kilometres north of the island of […]

  • 8 December 2017
    Business & Finance, Contracts & Tenders, Grid Connection, R&D

    Green Giraffe has signed a Memorandum of Understanding (MoU) with Taiwanese organizations for the cooperation on Taiwan’s green financial planning and renewable energy development, including better safety of offshore wind projects.

  • 7 April 2017
    Wind Farm Update

    Seaway Heavy Lifting (SHL) has awarded the German engineering company Recase Regenerative Energien GmbH with a contract to design electrical equipment for the transition pieces of the 203MW Trianel Windpark Borkum II offshore wind farm.

  • 7 January 2016
    Business & Finance, Technology

    UK-based subsea cable specialist ETA has announced the formation of a new division to focus on the provision of marine cable connectors, terminations and accessories. The new division will continue to provide bespoke designs and at the same time develop ETA’s production lines for larger scale projects. It will also market related products such as power […]

  • 20 December 2013
    Business & Finance, Wind Farm Update

    Ballast Nedam Offshore (BNO) is executing the foundation EPCI works for wind farm operator OWP Butendiek.  As part of this, BNO has subcontracted Jumbo for the offshore transport and installation of 80 transition pieces (TPs). The TPs are fabricated in Esbjerg and will be installed with the Dynamically Positioned HLV Jumbo Javelin. During the summer […]

  • 29 September 2013

    Belgium: Alstom Hires Bold Tern Alstom has hired “Bold Tern” jack-up installation vessel, owned by Fred. Olsen Windcarrier, to complete the offshore operations at the Belwind offshore wind farm. Japanese Offshore Wind Taking Pace A lot is happening on the offshore wind power front in Japan. In June Japan unveiled its first commercial floating turbine […]

  • 8 March 2011

    AMBAU GmbH has received its first complete order for offshore foundations. This is the largest individual order in the history of the company. Bremen: With AMBAU GmbH having already demonstrated its expertise as a supplier of main components for the foundations of the projects Global Tech 1 and Borkum West, the company has now received […]

  • 21 July 2017

    Discussing jacket foundations standardisation as a way of optimising production and cutting down the costs, Jorge López Novo, Navantia’s Commercial Manager, said that the foundation builders should be involved in offshore wind projects at an earlier stage, together with developers and designers. Since some concerns were raised over local content after Iberdrola awarded Navantia with […]

  • 19 July 2017
    Wind Farm Update

    The first of five wind turbines for the world’s first floating offshore wind farm – Hywind Scotland – has left the project’s assembly base in Stord, Norway, and is now on its way to the site off the coast of Peterhead in Aberdeenshire, Scotland.

  • 29 March 2018
    Vessels, Wind Farm Update

    The last eight transition pieces (TPs) for the Merkur offshore wind farm have been loaded onto the RollDock Sea vessel and are now ready to sail out to Eemshaven, according to Roll Group’s social media pages. 

  • 26 June 2017
    Wind Farm Update

    Statoil has shared a great video showing the mating of one of Hywind Scotland’s Siemens 6MW turbines with its SPAR-type floating foundation off Stord, Norway.

  • 4 June 2017

    Statoil Floats First Hywind Scotland Foundations off Stord The first two of the five SPAR-type floating foundations built by the Navantia-Windar consortium for Statoil’s 30MW Hywind Scotland floating wind farm have arrived to the project’s assembly base in Stord, Norway. Belgians Start Growing Mussels on Offshore Wind Farms A Belgian consortium of research institutions and […]

  • 5 April 2023
    Contracts & Tenders, Operations & Maintenance

    Omexom Renewable Energies Offshore, former EWE Offshore Service & Solutions (EWE OSS), has awarded a contract to HeliService, booking the German helicopter transport provider’s services on five offshore wind farms for at least two years. HeliService will be responsible for offshore air transport and hoisting work on the Alpha Ventus, Riffgat, Trianel Windpark Borkum, and Merkur […]

  • 24 August 2016
    Business & Finance, Wind Farm Update

    China Yangtze Power and China Three Gorges Corporation have teamed up to buy a majority stake in WindMW GmbH, the owner and operator of the 288MW Meerwind Süd|Ost offshore wind farm. The two companies have, through their subsidiaries, agreed to purchase a 100% stake in BCP Meerwind Luxembourg, a company which, through its wholly owned subsidiary, BCP […]

  • 16 March 2018
    Operations & Maintenance, Ports & Logistics, Wind Farm Update

    First eight jackets built by Lamprell for the 714MW East Anglia ONE offshore wind farm have arrived at the BOW Terminal in Vlissingen, the Netherlands.

  • 7 February 2018
    Operations & Maintenance, Wind Farm Update

    The first batch of jacket foundations for the East Anglia ONE offshore wind farm has arrived at Harland and Wolff’s (H&W) building dock in Belfast, Ireland, where they will be fully assembled.

  • 25 March 2019
    Grid Connection, Operations & Maintenance

    Transmission system operator TenneT has awarded Jan De Nul with a framework agreement for repairs of TenneT’s offshore high-voltage cables in the German Bight. Under the terms of the agreement, Jan De Nul will mobilize in the event of high-voltage cable system faults or failures within the contractual period of 24 months. The agreement also […]

  • 22 January 2017

    3sun Recruiting 100+ Technicians, Former O&G Workers Welcome to Apply 3sun Group has launched a recruitment campaign looking for more than 100 new technicians to service GBP 6 million worth of new and extended offshore and onshore wind farm contracts. Boskalis’ Revamped Vessel Coming Up in 2018 (VIDEO) As of 2018, Boskalis will add a […]

  • 26 January 2011
    Business & Finance

    Van Oord and the green investment company Typhoon Offshore B.V. signed a letter of intent for the construction of the BARD-Netherlands offshore wind farm. The wind farm (600 MW output capacity) will consist of two adjoining wind farms with a capacity of 300 MW each, located 55 km north of the island of Schiermonnikoog. The […]

  • 31 August 2021
    Contracts & Tenders, Operations & Maintenance, Ports & Logistics, Wind Farm Update

    Iberdrola has signed a lease agreement with the port of Sassnitz-Mukran for a new operations and maintenance (O&M) building that will serve the Baltic Eagle offshore wind farm. The developer, which already has an O&M base there for its Wikinger offshore wind farm, said that the agreement delivered another important milestone in the offshore wind […]

  • 16 April 2018
    Ports & Logistics, Vessels, Wind Farm Update

    The recently converted self-propelled DP2 crane vessel Bokalift 1 has started installing foundation pin piles on the 102-turbine East Anglia ONE offshore wind farm in the UK North Sea waters, Van Oord, the contractor for the foundation transport and installation works, told Offshore WIND.

  • 17 October 2017
    Wind Farm Update

    The first 6 of the total of 66 transition pieces (TPs) for the Merkur offshore wind farm have been loaded onto a vessel in Spain and will now set sail to Eemshaven, according to social media updates by those involved in the transport and logistics of the TPs.

  • 20 June 2017
    Wind Farm Update

    The first of the total 5 turbines for the Hywind Scotland project has been lifted onto its floating foundation in Stord, Norway, and is ready for the deployment off the Scottish coast.