4690 results found for 'Arcadis Ost'

4690 results found for 'Arcadis Ost'
Order results by

A list of search results

  • 8 August 2016
    Grid Connection, Technology, Wind Farm Update

    Iberdrola, 50Hertz Transmission GmbH, and Navantia hosted the delivery ceremony of the substation built for the 350MW Wikinger offshore wind farm at Navantia’s premises in Cadiz, on Monday, 8 August. The substation was christened as Andalucía and was built by Navantia entirely at the company’s Puerto Real shipyard. The entire structure, which includes a substation, jackets, offshore […]

  • 10 January 2020
    Vessels

    High Speed Transfers (HST) has taken over HST Euan, its fourth FCS 2710 class fast crew supply vessel, from Damen Shipyards. HST Euan, built by Damen Shipyards in Antalya, Turkey, is now ready for its voyage to Belgium, HST said. Once there, the vessel, and its sister HST Harri, will be deployed on the Northwester 2 […]

  • 18 May 2018
    Contracts & Tenders, Environment, Grid Connection, R&D, Technology

    Arcadis and Pondera Consult will carry out a strategic study into the various possibilities to transport the energy from future large-scale offshore wind farms in the Dutch North Sea to the national grid.

  • 27 February 2018
    Grid Connection, Wind Farm Update

    STX France has transported the offshore substation jacket foundation for the Arkona offshore wind farm to a quay in the Saint-Nazaire Port, from where it will be placed on a barge and transported to the wind farm site in the German Baltic Sea.

  • 12 April 2017
    Grid Connection, Vessels, Wind Farm Update

    Antwerp-based offshore marine contractor Scaldis is getting ready to install the offshore substation topside at the 400MW Rampion wind farm off the coast of Sussex, UK.

  • 6 September 2016

    During the weekend, Bladt Industries loaded out the 1,100-tonne Nobelwind (Belwind 2/ Bligh Bank 2) offshore substation at its production facilities in Aalborg.  The installation of the offshore substation is set to take place mid-September. Construction of the substation started in May 2015 and, as head entrepreneur on the EPCI project, Bladt Industries has been responsible for the construction of […]

  • 19 December 2014
    Grid Connection, Wind Farm Update

    The first electricity from the Nordsee Ost (North Sea East) offshore wind farm off the German coast is flowing shore-ward. The first of a total of 48 wind turbines has commenced trial operation in the past few days and is already feeding its green electricity into the grid. Grid operator TenneT had connected the wind farm […]

  • 23 February 2017
    Wind Farm Update

    The topside and jacket of the second substation for the Race Bank offshore wind farm have been loaded onto a pontoon in Hoboken, Belgium, according to Seacontractors’ latest social media post.

  • 7 May 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The installation of the offshore substation jacket foundation and topside for the third phase of the Dogger Bank Wind Farm, the world’s biggest offshore wind farm under construction, will commence soon. Heerema Marine Contractors’ semi-submersible crane vessel (SSCV) Sleipnir will install the offshore substation jacket and topside at the Dogger Bank C site in the […]

  • 1 June 2020
    Grid Connection

    The project team working on the jacket foundation for the Hollandse Kust Zuid Alpha offshore substation has completed all the major lifts for the jacket, Petrofac said. The jacket is now getting ready to depart the United Arab Emirates and head to the Dutch North Sea. In September 2019, Eversendai Offshore cut the first steel […]

  • 5 May 2025
    Fixed-Bottom, Project Updates, Wind Farm Update

    With the start of scour protection activities, the offshore construction work for the first phase of RWE’s 1.6 GW Nordseecluster wind project has commenced. The Nordseecluster A offshore wind farm is the first phase of the 1.6 GW Nordseecluster development that will be built north of the island of Juist in Germany. The works are […]

  • 24 September 2014
    Business & Finance, Technology, Wind Farm Update

    Senvion SE, a wholly owned subsidiary of the Suzlon Group, the world’s fifth-largest manufacturer of wind turbines, today installed its 111th offshore turbine. The company reached this milestone with the nineteenth Senvion 6.2M126 of 48 planned turbines that are currently being installed at the Nordsee Ost offshore wind farm. The additional 29 turbines for Nordsee […]

  • 12 May 2016
    Grid Connection, Wind Farm Update

    Semco Maritime is preparing for the commissioning of the Sandbank offshore wind farm’s substation. “We have about 20-25 days of intensive offshore work ahead of us,” the company said via social media. The jacket foundation was installed on 2 May, and the topside was placed on it a few days ago. In March, MPI Offshore signed a contract for […]

  • 13 June 2014
    Grid Connection, Wind Farm Update

    A network of more than 60 kilometers of underwater cable now spreads over the construction field of the Nordsee Ost offshore wind farm. This is almost the length of the Eurotunnel that connects the UK with Continental Europe. The inter-array cabling was completed in altogether less than four months. “We divided cable installation into two campaigns. The first […]

  • 1 May 2025
    Business development, R&D, Research & Development, Technology

    ZF Wind Power has commissioned what the company claims to be the world’s most powerful validation test rig, which is capable of testing machines up to 30 MW. The 30 MW test rig, which is now ready for operation at ZF Wind Power’s Test and Prototype Center in Lommel, Belgium, can validate complete powertrain systems […]

  • 20 October 2021
    Grid Connection, Wind Farm Update

    Heerema Fabrication Group (HFG) has loaded out the jacket foundation for the Hollandse Kust Noord offshore substation in the Port of Vlissingen and plans to send the substructure off to TenneT at the end of October. The jacket, weighing 2,100 tonnes, was brought onboard a pontoon from the company’s yard by Mammoet on 16 October. […]

  • 18 July 2019
    Grid Connection

    JGC has, on behalf of Siemens, completed the construction of high voltage equipment containers for the Moray East offshore substation platforms. JGC fabricated eight of twelve containers at its site in Thurso and have also supported Siemens with other offshore projects in the UK. From Thurso, the containers will make their way to Fabricom-Smulders in Belgium […]

  • 13 June 2012
    Authorities

    Scotland is leading the way in driving down the costs of offshore wind, Energy Minister Fergus Ewing has told major industry conference. Scotland has a quarter of Europe’s offshore wind capacity and planned offshore wind projects in the country have the potential to produce up to 10GW of electricity by 2020. Speaking at the Global […]

  • 15 September 2022
    Grid Connection, Wind Farm Update

    Equans has loaded out the topside for the offshore substation of the Hollandse Kust Noord offshore wind farm that is being built in the Dutch sector of the North Sea. The company, which is delivering the platform in partnership with Smulders, loaded out the topside on 12 September on the Scheldt along the quay of […]

  • 10 July 2024
    Fixed-Bottom, Foundations, Manufacturing, Supply Chain

    Dutch offshore wind foundation manufacturer, Sif, will be using a new welding technique in the production process of XXXL monopiles in its new production halls on the Maasvlakte, Rotterdam. The Cold Wire Tandem-Twin Narrow Gap SAW (CWTT-NGSAW) process is said to make welded joints stronger and welded connections more durable. The method was developed by Sif’s […]

  • 16 June 2020
    Grid Connection, Wind Farm Update

    The second offshore substation platform (OSP) has been installed at the 857 MW Triton Knoll wind farm offshore Lincolnshire, the UK. The installation of OSP East, the last of the project’s two OSPs, was carried out by Seaway Strashnov overnight on Monday 15 June. “This is an important step in ensuring we remain on track, […]

  • 30 June 2015

    RenewableUK has welcomed the new report commissioned by the Committee on Climate Change which shows the cost of offshore wind energy will drop dramatically by the end of the decade, with further significant cost reductions in the 2020s. The study, “Approaches to cost reduction in offshore wind” by BVG Associates for the CCC, says there is […]

  • 16 February 2015

    Borkum Riffgrund 1 At the end of October 2014 the first of in total 78 Siemens SWT-4.0-130 turbines was installed at the 312MW Borkum Riffgrund 1 offshore wind farm, located 54km off the German coast and around 37km from the island Borkum. In December Danish CT Offshore completed the installation and burial of the 44 […]

  • 21 September 2020
    Wind Farm Update

    Aarsleff BIZ, a Per Aarsleff company, has loaded out the first batch of concrete work platforms (CWPs) for the Windpark Fryslân nearshore wind farm in the Netherlands at its factory in Swinoujscie, Poland. The CWPs, each weighing 76 tonnes, will be mounted on the project’s monopiles, which are currently being installed at the project site in the […]

  • 4 June 2021
    Wind Farm Update

    The jacket foundation for the Saint-Nazaire offshore wind farm’s offshore substation is ready to be transported from Italy to France, according to Rosetti Marino’s latest update posted on social media. The jacket, 50 metres tall and weighing 1,200 tonnes, has been loaded onto a barge in a vertical position and will travel to the Saint-Nazaire […]

  • 30 April 2025
    Energy Islands, Grid Connection, Infrastructure, Offshore Platforms

    Construction has begun on the Princess Elisabeth Island, the world’s first energy island, in the Belgian North Sea, with the first two of 23 caissons already submerged at their final location. The work is being carried out on behalf of grid operator Elia Transmission Belgium by TM Edison, a joint venture between DEME and Jan De […]