4670 results found for 'Arcadis Ost'

4670 results found for 'Arcadis Ost'
Order results by

A list of search results

  • 14 January 2026
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates

    HSI, a joint venture between HSM Offshore Energy, Smulders and Iv, has installed the Jasmund offshore substation (OSS), which will connect the Windanker offshore wind farm to the German electricity grid, at its designated location in the Baltic Sea. The Jasmund platform is part of the Ostwind 3 grid connection project, which will collect 300 MW […]

  • 3 October 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Vessels, Wind Farm Update

    The world’s largest semi-submersible crane vessel (SSCV), Heerema Marine Contractors’ Sleipnir, is scheduled to place the offshore substation (OSS) topside on top of the jacket foundation that the vessel recently installed at the East Anglia Three offshore wind farm site in the UK. In August, Sleipnir completed the installation of the jacket foundation for the […]

  • 13 August 2025
    Project Updates, Wind Farm Update

    A nearshore geophysical survey and a drop-down video survey are starting this month at the two Norfolk Vanguard offshore wind sites, located 50 to 80 kilometres off the coast of Norfolk in the UK, where RWE plans to build offshore wind farms with an installed capacity of 1.4 GW each. The environmental drop-down video (DDV) […]

  • 9 December 2025
    Equipment, Foundations, Innovation, R&D, Supply Chain, Technology

    Prometeo, the Offshore Rover by AXIST: A Breakthrough That Reinvents Mono-Pile Flange Measurement In the world of offshore wind, precision is non-negotiable. Even the smallest deviation can lead to deformation, reduced performance, and costly corrective interventions. Measuring the flange of a mono-pile immediately after piling is one of the most critical moments in the entire […]

  • 5 December 2025
    Contracts & Tenders, Fixed-Bottom, Supply Chain

    Elektrownia Wiatrowa Baltica – 1, a project company set up by PGE Polska Grupa Energetyczna (PGE), has issued a contract notice for geotechnical investigation services for its 900 MW Baltica 1 offshore wind project. The work is planned to be carried out along the export cable route and in the offshore wind farm area of […]

  • 5 November 2025
    Business & Finance, Cables, Grid Connection, Outlook & Strategy, Vessels

    The China Merchants Heavy Industry shipyard has begun the construction of a DP 2 cable-laying vessel (CLV) ordered by Greece’s Asso.subsea for the offshore wind market. The steel-cutting ceremony for Althea was held today, 5 November, at the CMHI shipyard on Mazhou Island, Shenzhen, China. “The first steel cut for Althea marks the true beginning of an exciting […]

  • 12 January 2026
    Business & Finance, Industry

    WindEurope has appointed Tinne Van der Straeten, Belgium’s former Minister of Energy, as its new Chief Executive Officer (CEO). Van der Straeten will take over from the organisation’s current CEO, Giles Dickson, who has served in the position for ten years, on 2 February 2026. “The WindEurope Board thanks former CEO Giles Dickson for his […]

  • 4 December 2025
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    All 21 monopile foundations at the Windanker offshore wind farm in the German Baltic Sea have been installed, according to a social media update posted by Iberdrola Deutschland. The work was carried out by Van Oord using the heavy-lift installation vessel Svanen, which installed the first monopile in September. According to Iberdrola, these are some […]

  • 31 October 2025
    Authorities, Business & Finance, Contracts & Tenders, Fixed-Bottom, Planning & Permitting

    The Dutch government has confirmed that no applications were submitted for the latest offshore wind tender for the 1 GW Nederwiek I-A site in the North Sea. The tender closed on 30 October without bids, the Netherlands Enterprise Agency (RVO) said in a press release issued the same day. In a letter to Parliament, Dutch […]

  • 28 October 2025

    Several industry organisations expressed dissatisfaction with the UK government’s offshore wind budget for Contracts for Difference (CfD) Allocation Round 7 (AR7), with WindEurope calling it “disappointing”. WindEurope described the UK government’s GBP 1.08 billion budget as disappointing, saying it undermines the growth of the country’s offshore wind sector and could affect the wider European industry. […]

  • 7 January 2026
    Fixed-Bottom, Grid Connection, Onshore Infrastructure, Project Updates, Wind Farm Update

    Polish state-owned transmission system operator (TSO), Polskie Sieci Elektroenergetyczne (PSE), has confirmed the technical readiness of the transmission infrastructure to accept power from offshore wind farms. “The new Choczewo station and the expanded Żarnowiec station, as well as the 400 kV line connecting them, are ready to transmit energy from wind farms being built in […]

  • 15 December 2025
    Business & Finance, Business development, Vessels

    Ocean Infinity has taken delivery of the 14th and final vessel in its Armada fleet, ordered in 2020 as a fleet of next-generation robotics-equipped, low-emission vessels for geophysical and geotechnical surveys. The latest delivery completes the 86-metre class of Armada vessels, following the introduction of the 78-metre class in 2023. Twelve vessels are now in […]

  • 25 September 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    RWE has awarded Semco Maritime with a framework agreement for the maintenance of German offshore substations. The agreement, commencing in September 2025, will continue through 2027 and includes a two-year extension option. Semco Maritime’s scope of work includes scheduled and unscheduled maintenance above water and troubleshooting services of the auxiliary equipment at RWE’s offshore substations […]

  • 10 December 2025
    Authorities, Fixed-Bottom, Floating Wind, Grid Connection, Planning & Permitting

    The European Commission just published a European Grids Package that includes Guidance on Contracts for Difference (CfDs), making the offshore wind industry’s much-sought-after procurement model soon to be mandated by the EU. While the new package has yet to be adopted and will serve as a foundation for EU and national legislation moving forward, a […]

  • 6 January 2026
    Business development, Fixed-Bottom, Grid Connection, Innovation, Offshore Platforms, Technology

    ABS has issued an Approval in Principle (AIP) to Seatrium for the company’s offshore substation (OSS) design, described as a next-generation offshore HVAC platform engineered for scalability. Seatrium has built several offshore converter platforms for offshore wind farms and grid connections over the years, including the now-operational DolWin epsilon in Germany and the OSS for […]

  • 18 November 2025
    Grid Connection, Offshore Platforms

    Both the topside and the jacket foundation of the 300 MW Jasmund offshore substation have been loaded out and are ready to set sail to the Baltic Sea for offshore installation. The topside, constructed at HSM Offshore Energy’s Stormpolder yard in the Netherlands, measures 48 metres long, 33 metres wide, and 17.5 metres high, and […]

  • 31 July 2025
    Authorities, Fixed-Bottom, Floating Wind, Planning & Permitting

    The US Bureau of Ocean Energy Management (BOEM) has rescinded and de-designated all Wind Energy Areas (WEAs) on the US Outer Continental Shelf (OCS). The WEAs are areas in the US federal waters that BOEM previously identified as suitable for wind energy development and, following a multi-stage process, designated Wind Energy Areas for which a […]

  • 22 September 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    Glamox has secured contracts to provide connected marine lighting and light management systems for eleven offshore High-Voltage Direct Current (HVDC) converter platforms, being built for the Dutch/German transmission system operator (TSO) TenneT. The contracts represent Glamox’s largest marine lighting project to date, in which it will provide more than 38,000 marine lights with advanced systems […]

  • 23 December 2025
    Authorities, Planning & Permitting, Project Updates, Safety, Wind Farm Update

    The US Department of Interior has paused the leases and suspended construction at all large-scale offshore wind projects currently under construction in the United States, citing ”national security risks identified by the Department of War in recently completed classified reports.” The five projects have a combined capacity of 5.8 GW and include Coastal Virginia Offshore […]

  • 14 November 2025
    Business & Finance, Contracts & Tenders, Supply Chain, Technology

    Luxcara has signed a preferred supplier agreement with Ørsted for their low-noise jetting-based monopile installation technology platform called Osonic, which will be used for offshore wind turbine foundations across Luxcara’s offshore wind portfolio in Germany. This is the first preferred supplier agreement for Osonic as well as the first step towards commercial deployment of the […]

  • 21 November 2025
    Floating Wind, Foundations, Supply Chain, Technology

    BayWa r.e. has received concept certification from DNV for its BayFloat floating wind semi-submersible concrete substructure and mooring system design. The design was validated using the 22 MW generic reference turbine “IEA-22-280-RWT”. The certification process was conducted in accordance with DNV-SE-0422:2021-09 “Certification of floating wind turbines” scheme, including DNV-ST-0119:2021-06 “Floating wind turbine structures” as the […]

  • 18 September 2025
    Business & Finance, Business development, Cables, Grid Connection, Outlook & Strategy, Vessels

    Italian cabling giant Prysmian Group has completed the hull erection of its new cable laying vessel (CLV), bringing it closer to launch. The DP3 Alessandro Volta will be equipped with three carousels for a total load capacity of 19,000 tonnes, with the system of tensioners able to sustain a maximum tension of 60 tonnes, and […]

  • 8 January 2026
    Business & Finance, Vessels

    Ulstein Verft in Norway has launched Yard no. 322, the first of two commissioning service operation vessels (CSOVs) the company is building for investors advised by J.P. Morgan. In July 2023, Bernhard Schulte Offshore ordered the design and construction of two CSOVs from Ulstein, a contract that included options for two + two vessels. In 2024, […]

  • 17 July 2025
    Fixed-Bottom, Grid Connection, Manufacturing, Offshore Platforms, Project Updates, Supply Chain, Wind Farm Update

    The offshore substation for the 1 GW Thor offshore wind farm has left HSM Offshore Energy’s Schiedam yard in the Netherlands and is on its way to the project site in the Danish North Sea. “[The] sail-away of the fully assembled substation for THOR is an important step for us in the project team”, said […]

  • 21 October 2025
    Business & Finance, Outlook & Strategy, Training & Education, Transition

    Malaysian oil and gas company Petronas, in partnership with Universiti Malaysia Terengganu (UMT), has launched the Centre for Offshore Renewable Energy (CEFORE). Located off the coast of Kuala Terengganu, CEFORE aims to generate electricity by harnessing offshore wind, solar, and wave energy, and integrate it with on-site energy storage and energy management systems to enable […]

  • 4 November 2025
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    PGE Polska Grupa Energetyczna (PGE) has obtained environmental approval for its 900 MW Baltica 1 offshore wind project, clearing the way for its participation in Poland’s upcoming offshore wind auction on 17 December 2025. The approval was issued by the Regional Directorate for Environmental Protection in Gdańsk. “This is a clear signal to the market […]