583 results found for 'windanker'

583 results found for 'windanker'
Order results by

A list of search results

  • 11 July 2018
    Authorities, Wind Farm Update

    The Council of State dismissed eight objections filed against the final permits for Windpark Fryslân and thus cleared the way for the construction of the project in the Frisian part of the IJsselmeer near Breezanddijk in the Netherlands.

  • 30 January 2020
    Contracts & Tenders

    Van Oord has awarded Vos Prodect Innovations with a contract to deliver cable hang-off systems for the Windpark Fryslân nearshore wind project in the Netherlands.

  • 28 February 2018
    Contracts & Tenders, Wind Farm Update

    Senvion has contracted TÜV Rheinland to oversee the production of wind turbine blades for the Trianel Windpark Borkum II offshore wind farm.

  • 29 June 2018
    Grid Connection

    Jan De Nul has completed the export cable installation works at the Trianel Windpark Borkum II and the Borkum Riffgrund 2 offshore wind farms in the German North Sea.

  • 18 March 2016
    Wind Farm Update

    The Navantia-Windar joint venture has erected the first block for the first of five spar-type floating foundations for Statoil’s Hywind Scotland project.  The block weighs approximately 70t, and has a diameter of 14.4m. Five blocks with maximum weight of 800t will be assembled and moved onto the slipways for assembly of 90m long spar units and […]

  • 15 November 2018
    Ports & Logistics, Wind Farm Update

    The Buss Terminal Eemshaven has received the first shipment of wind turbine tower sections for the Trianel Windpark Borkum II offshore wind project.

  • 9 November 2018
    Wind Farm Update

    27 out of the 32 monopile foundations have been installed on the 200MW Trianel Windpark Borkum II (TWB II) offshore wind farm in the German North Sea.

  • 2 July 2021
    Business & Finance, Contracts & Tenders

    Navantia and Windar announced today (2 July) that they will build a factory for XXL monopiles on the grounds of the Fene shipyard in Spain after Iberdrola closed a framework agreement with the partnered companies for future offshore wind farms, valued at EUR 400 million. The framework agreement between Iberdrola and Navantia-Windar involves the manufacture […]

  • 17 August 2021
    Business & Finance

    Windar Renovables has signed a EUR 50 million sustainable factoring line with BBVA (Banco Bilbao Vizcaya Argentaria) to finance the contract the company was recently awarded for the Baltic Eagle offshore wind project. The contract financing, which will support Windar’s manufacturing and delivery of 50 transition pieces (TPs) for Iberdrola’s 476 MW project in Germany, has […]

  • 10 June 2020
    Contracts & Tenders, Operations & Maintenance

    Trianel Windkraftwerk Borkum is seeking a provider of marine, flight, and emergency response coordination services at the Trianel Windpark Borkum I wind farm in the German North Sea. The tender is divided into two lots. Lot 1 covers the marine, flight, and emergency response coordination services, plus operations control at the 200 MW wind farm. […]

  • 8 December 2021
    Wind Farm Update

    The 382.7 MW Windpark Fryslân, the largest wind farm built in a body of fresh water, has been fully commissioned. Located in the IJsselmeer Lake in the Netherlands, Windpark Fryslân comprises 89 Siemens Gamesa 4.3 MW wind turbines which have been fully tested and in operation since November. Data at the project’s website shows that the […]

  • 4 June 2018
    Vessels

    Vroon has christened its newest platform supply vessel (PSV) VOS Patriot, which is set to be deployed at the Trianel Windpark Borkum II offshore wind farm in the German North Sea.

  • 24 July 2019
    Wind Farm Update

    Jan De Nul’s offshore installation vessel Taillevent has begun loading the first turbine components for the Trianel Windpark Borkum II (TWBII) offshore wind farm. The 200MW TWBII offshore wind farm will comprise 32 Senvion 6.2M152 turbines installed at the project site some 40km north of the island of Borkum in Germany. Taillevent loaded the first three towers, blades […]

  • 23 May 2024
    Business & Finance, Collaboration, Outlook & Strategy

    A letter of intent has been signed between the City of Szczecin and Windar Polska, strengthening the company’s cooperation for the construction of its new facility in Poland. “The signing of the letter is another important step for the economic development of Szczecin. We want to be actively involved in the process of building a […]

  • 23 December 2020
    Wind Farm Update

    Van Oord has installed all of the 89 foundations at the Windpark Fryslân nearshore wind farm in the IJsselmeer Lake, the Netherlands. Van Oord installed the first monopile at the site in the Frisian part of the IJsselmeer near Breezanddijk in September. Due to the shallows in the IJsselmeer and the width of the locks, […]

  • 13 November 2019
    Wind Farm Update

    Senvion has delivered the last turbine for the Trianel Windpark Borkum II (TWBII) offshore wind project in Germany. According to Senvion, all components for the 200MW wind farm have been finished and shipped to Eemshaven. Trianel Windpark Borkum II comprises 32 Senvion 6.2M152 turbines installed on monopile foundations at the site some 40km north of the […]

  • 12 April 2021
    Wind Farm Update

    The first wind turbine at Windpark Fryslân has begun producing electricity, according to a project update published on social media on 12 April. The first of the total of 89 Siemens Gamesa 4.3 MW wind turbines was installed at the project site at the end of the last month. Located in the IJsselmeer Lake in […]

  • 25 December 2019
    Contracts & Tenders

    Trianel Windkraftwerk Borkum has opened a tender seeking CPS retrofit and bolt exchange services for the Trianel Windpark Borkum offshore wind project. The awarded company will be in charge of subsea works on CPS retrofits and subsea bolt exchanges at diffusor plates, i.e. steel plate under the central column of the tripod foundation. The scope […]

  • 16 June 2020
    Contracts & Tenders, Wind Farm Update

    Trianel Windkraftwerk Borkum has issued a contract notice for insurance policy services covering the 200 MW Trianel Windpark Borkum I offshore wind farm in the German North Sea. The contract covers combined property damage and business interruption all risks insurance for the operational phase of the wind farm consisting of 40 offshore wind turbines including […]

  • 5 September 2018
    Wind Farm Update

    Seaway Heavy Lifting’s (SHL) vessel Stanislav Yudin has installed 16 out of 32 monopile foundations at the Trianel Windpark Borkum II in the German North Sea.

  • 26 February 2021
    Environment, Wind Farm Update

    The installation of Siemens Gamesa turbines at the Windpark Fryslân nearshore wind farm in the Netherlands is set to commence at the beginning of March. The 382.7 MW Windpark Fryslân will comprise 89 Siemens Gamesa 4.3 MW turbines located in the IJsselmeer Lake. According to the project developer, all preparations are almost ready, Van Oord installed the final […]

  • 14 May 2020
    Wind Farm Update

    The Blue Tern installation vessel is currently at the Trianel Windpark Borkum II (TWBII) project site with the last two turbines to be installed. OffshoreWIND.biz contacted Fred. Olsen Windcarrier after Buss Energy Group, which has been providing port logistics for wind turbine installation, reported it had completed its project for Trianel wind farm Borkum II. […]

  • 4 October 2019
    Contracts & Tenders, Operations & Maintenance

    Trianel Windkraftwerk Borkum has issued a tender seeking corrective maintenance work for the Trianel Windpark Borkum offshore wind farm in Germany. The contractor will be in charge of the corrective maintenance and optional repair/refurbishment of major components such as gearboxes, generators, blade sets and rotor hubs. The tender also covers work on the MV converters, MV switchboards, main […]

  • 19 June 2020
    Operations & Maintenance

    Dutch company Certion and drone service provider SkySpecs have completed blade inspection works at Eneco’s Prinses Amalia Windpark and Eneco Luchterduinen in the Netherlands. In total, 70 wind turbines were inspected in five days at Prinses Amalia Windpark and Eneco Luchterduinen offshore wind farm. “Thanks to favourable weather conditions and a highly motivated support team […]

  • 13 July 2020
    Wind Farm Update

    Zuiderzeewind, a consortium of Van Oord and Siemens Gamesa Renewable Energy, plans to finish building the artificial island near Kornwerderzand, the Netherlands, in September. The island, which will first serve as the construction stage for the Windpark Fryslân nearshore project and after that as a nature reserve and a bird sanctuary, is located next to […]

  • 23 September 2011

    This monday Holland Shipyards saw the arrival of the to be windpark accommodation vessels Siluna and Simara, recently acquired by Chevalier Floatels. These vessels, still ferries now, will be completely modified to serve as an accommodation base in offshore windparks. With on board facilities such as an Ampelmann heave compansated gangway, DP2 notation, a store […]