Search results for: Hornsea One

651 results

A list of search results

  • 27 October 2016
    Vessels, Wind Farm Update

    DONG Energy Wind Power A/S has awarded Royal Boskalis Westminster with a contract for the transport and installation of the foundations for a part of the 1.2GW Hornsea Project One offshore wind farm located some 120 kilometers off the Yorkshire coast, UK. The transport and installation of the foundations will be executed by Boskalis’ new […]

  • 20 February 2019
    Vessels

    Danish company MH-O&C has held a naming ceremony for the crew transfer vessel (CTV) MHO Gurli. The 39m long Fast Supply Cat vessel was ordered by Ørsted for the Hornsea Project One offshore wind farm in the UK and is expected to enter service shortly. MHO Gurli has a 10.3m beam, a max draft of […]

  • 5 July 2019
    Wind Farm Update

    The 100th Siemens Gamesa 7MW turbine has been installed at the Hornsea Project One offshore wind farm in the UK. Fred. Olsen Windcarrier’s Bold Tern is in charge of installing 88 out of the project’s total 174 turbines, with A2SEA’s Sea Challenger responsible for installing the remaining 86 units. According to Fred. Olsen Windcarrier, Bold Tern recently […]

  • 27 November 2018
    Business & Finance, Wind Farm Update

    Ørsted has completed the divestment of 50% of the Hornsea Project One offshore wind farm in the UK to Global Infrastructure Partners (GIP).

  • 6 February 2018
    Environment, Grid Connection, Operations & Maintenance, R&D

    Wessex Archaeology has unearthed numerous archaeological remains in Lincolnshire, UK, and the surrounding area as part of the onshore construction works for Ørsted’s Hornsea Project One offshore wind farm.

  • 20 September 2018

    Mech-Tool Engineering (MTE) has completed a fabrication project comprising a series of transportation cradles for the 1.2GW Hornsea Project One offshore wind farm.

  • 3 October 2018
    Wind Farm Update

    GeoSea has installed half of the monopile foundations at the Hornsea Project One offshore wind farm in the UK.

  • 12 April 2018
    Operations & Maintenance, Wind Farm Update

    Spain-based Dragados Offshore has sent off all four jacket foundations for the offshore substations at Ørsted’s Hornsea Project One offshore wind farm.

  • 6 August 2018
    Grid Connection, Wind Farm Update

    All three offshore substations and the world’s first Reactive Compensation Substation (RCS) have been installed at Hornsea Project One, Ørsted, the owner and developer of the 1.2GW wind farm, said.

  • 31 March 2016
    Business & Finance, Grid Connection, Wind Farm Update

    Swiss power and automation technology group ABB has won an order worth more than USD 250 million from DONG Energy to deliver a 220-kilovolt high-voltage cable system that will connect the 1.2GW Hornsea Project One offshore wind farm in the North Sea to the UK mainland grid. ABB will supply alternating current (AC) submarine cable systems […]

  • 26 April 2019
    Wind Farm Update

    DEME Offshore installed the final of the 174 monopile foundations on the 1.2GW Hornsea Project One offshore wind farm on Thursday, 25 April. The first monopile was installed at the site some 120 kilometres off the Yorkshire coast in the UK in January 2018. According to DEME, four of the company’s jack-ups has since worked at […]

  • 18 March 2019
    Business & Finance, Vessels

    Danish company MH-O&C has taken delivery of crew transfer vessels (CTVs) MHO Gurli and MHO Esbjerg, destined for Ørsted’s Hornsea Project One offshore wind farm in the UK. MH-O&C launched MHO Gurli in November last year, with the vessel’s naming ceremony held this February. According to Incat Crowther, the designer, the two 39m long vessels are the largest […]

  • 3 September 2019
    Business & Finance

    Spectrum Offshore has completed its scope of work at Ørsted’s Hornsea Project One offshore wind farm in the UK. Spectrum Offshore was in charge of providing offshore construction support surveys on the 1.2GW project under a contract secured in April last year. According to the UK-based company, the work took 18 months and was carried out […]

  • 6 February 2018
    Contracts & Tenders, Grid Connection, Operations & Maintenance, Technology, Wind Farm Update

    Ørsted has awarded Seaproof Solutions with a contract extension to supply all inter-array cable protection systems (CPS) for its 1.2GW Hornsea Project One offshore wind farm in the UK.

  • 23 December 2016
    Grid Connection, Wind Farm Update

    Prefabrication work on three substations for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm is well under way, Danish offshore structure construction specialist Bladt Industries reports. Each substation will weigh 2,800 tons and the first unit will be delivered during the first half of 2018, the company said. The contract represents Bladt’s first ever order to fabricate […]

  • 11 March 2015
    Grid Connection, Wind Farm Update

    Dong Energy has awarded Ramboll the design of a reactive compensation substation for the Hornsea Project One offshore wind farm development. The scope of work comprises the conceptual development, detailed design and technical assistance during tendering, fabrication and installation. The requirement for an offshore reactive compensation substation is a direct consequence of wind farms moving […]

  • 8 May 2019
    Ports & Logistics, Wind Farm Update

    Windhoist Limited has pre-assembled 78 out of 174 wind turbine towers for the 1,218MW Hornsea Project One wind farm at Siemens Gamesa’s pre-assembly site in Hull. The Ayrshire-based company is providing Siemens Gamesa with the pre-construction support for 174 Siemens Gamesa SWT-7.0-154 wind turbines which are currently being installed at the site some 120 kilometres offshore Yorkshire. […]

  • 1 February 2019
    Vessels, Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up vessel Bold Tern has arrived in Hull, the UK, where it will begin its work for the Hornsea Project One offshore wind farm. According to Fred. Olsen Windcarrier, the vessel arrived in Hull yesterday afternoon and is ready to pick up the turbines for the 1.2GW project. Bold Tern is in charge of […]

  • 30 November 2018
    Vessels

    DEME Group’s new cable laying and multipurpose vessel Living Stone has started her first offshore wind assignment on the Hornsea Project One wind farm off the North Sea coast of the UK.

  • 20 February 2018
    Business & Finance, Wind Farm Update

    Ørsted has entered exclusive discussions regarding a 50% farm-down of the 1.2GW Hornsea Project One offshore wind farm.

  • 11 April 2018
    Grid Connection, Ports & Logistics, Wind Farm Update

    The Hornsea Project One offshore substation topside Z12 has been loaded onto a barge and is awaiting sail out to the installation site some 120 kilometres off Yorkshire, UK.

  • 13 September 2017
    Grid Connection, Wind Farm Update

    Bladt Industries has installed a helideck on the first out of the three substation topsides currently under construction for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm in the UK.

  • 17 November 2016
    Wind Farm Update

    DONG Energy has awarded Siem Offshore Contractors (SOC) with a contract for the transport and installation of parts of the inner-array grid cable system for the 1.2GW Hornsea Project One offshore wind farm. SOC’s scope of work includes the installation of 81 submarine composite cables as well as the associated post-lay trenching works. The project engineering […]

  • 27 February 2019
    Contracts & Tenders

    Siemens Gamesa has awarded SMC with a contract to provide marine coordination services across the 1.2GW Hornsea Project One offshore wind farm. Based some 120 kilometres off the coast of Yorkshire, the project is being developed by Ørsted and will consist of 174 7MW Siemens Gamesa wind turbines, covering an area of 407 square kilometres. SMC and […]

  • 4 March 2020
    Business & Finance

    Ørsted has reported an increase of DKK 1 billion (circa EUR 134 million) in its full-year EBITDA guidance due to updated assumptions regarding the divestment of the transmission asset for the Hornsea One offshore wind farm. The Danish company said it now expects EBITDA excluding earnings from new partnership agreements to be DKK 16-17 billion this […]

  • 3 May 2019
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up Bold Tern has completed the installation of 28 turbines at the Hornsea Project One offshore wind farm in the UK. The vessel, which is in charge of installing half of the project’s 174 turbines, has picked up the 8th batch of the Siemens Gamesa units in the Port of Hull and […]