375 results found for 'BorWin6'

375 results found for 'BorWin6'
Order results by

A list of search results

  • 4 December 2020
    Contracts & Tenders, Grid Connection

    TenneT TSO GmbH has issued a tender notice for the design, manufacture, installation, and commissioning of the BorWin6 converter platforms. Located in the North Sea Cluster 7, the 900 MW BorWin6 is scheduled to be commissioned by 2027. The offshore grid connection will collect the three-phase electric power generated at an offshore wind farm to […]

  • 21 September 2021
    Contracts & Tenders, Grid Connection

    TenneT has issued a call for tenders for Structural Health Monitoring systems (SHM systems) and their installation on twelve offshore HVDC platforms, including both existing and platforms yet to be installed offshore. Under a five-year, EUR 3.25 million contract, the tender winner will develop and install a monitoring concept for the support structures of the […]

  • 2 June 2021
    Contracts & Tenders, Grid Connection

    Transmission system operator TenneT has issued a notice for a turnkey contract covering the cable system needed to connect the BorWin6 offshore platform to the German grid. With the 930 MW BorWin6 project, TenneT is planning a direct current connection in the North Sea Cluster 7. Scheduled to be commissioned by 2027, the BorWin6 offshore […]

  • 15 February 2022
    Contracts & Tenders, Grid Connection

    A consortium comprising McDermott and Global Energy Interconnection Research Institute and C-EPRI Electric Power Engineering (GEIRI / C-EPRI) has been awarded a contract for offshore and onshore converter stations for the German BorWin6 offshore grid connection which will be delivered by TenneT to link 980 MW of offshore wind capacity to the German grid. “With […]

  • 7 July 2023
    Contracts & Tenders, Grid Connection

    Asso.subsea has signed a contract with Nexans for the transportation, installation and protection of the nearshore section of the BorWin6 offshore cable in Germany, with offshore work scheduled for 2025. The company will be involved in the design and execution of this part of the project in shallow waters and will also assist Nexans in […]

  • 25 March 2020
    Grid Connection

    TenneT Offshore GmbH has issued a tender for the technical planning of an onshore cable route as part of the planning approval process for the BorWin6 offshore grid connection in the German North Sea. The tender includes the technical planning of the country route of the BorWin6 cable system, which lands in Neuenkoog (Büsum) and […]

  • 26 February 2025
    Business & Finance, Cables, Grid Connection, Offshore Platforms

    Siemens Energy has selected the German company Pfisterer for the supply of turnkey cable systems for the BorWin4 and DolWin4 offshore grid connections in the North Sea. Pfisterer is in charge of implementing the entire 66 kV AC cable infrastructure between the gas-insulated switchgear (GIS) transformer and submarine cable connection on the DolWin4 and BorWin4 […]

  • 7 July 2023
    Authorities, Wind Farm Update

    Skyborn Sweden (Skyborn) has submitted a permit application to the Swedish government to build the 2,800 MW Fyrskeppet offshore wind farm north of Örskar in Uppsala County, about 50 kilometres off the coast. The Fyrskeppet offshore wind farm is expected to generate up to 11 TWh fossil-free electricity when completed, which could be enough to […]

  • 7 July 2023
    Business & Finance, Business development

    The Port of Esbjerg has entered into a cooperation agreement with PensionDanmark under which the port will receive DKK 5.8 billion (about EUR 779 million) for the construction of facilities for the production of offshore wind turbines. PensionDanmark has decided to invest up to DKK 7 billion (around EUR 940 million) in the Port of […]

  • 4 November 2020
    Contracts & Tenders, Grid Connection

    TenneT has invited tenders for services related to cable repair and maintenance in both Germany and the Netherlands, which include locating cable faults. The services will be delivered across several grid connections and interconnectors. The transmission system operator (TSO) is looking to conclude a contract for a service-level agreement with a provider of cable fault […]

  • 20 March 2013
    Business & Finance

    GL Garrad Hassan has acted as technical adviser to Mitsubishi Corporation (MC) on their recent acquisition of a 49% stake in the BorWin1 and BorWin2 German offshore high-voltage, direct current (HVDC) links. The company acted as the sole technical advisor to MC providing due diligence assessment of the BorWin assets and follow on support to […]

  • 11 September 2018
    Grid Connection, Ports & Logistics

    The BorWin gamma topside has started its journey from the Drydocks World – Dubai to the German North Sea.

  • 13 January 2012
    Wind Farm Update

    TenneT Offshore GmbH eyes subsea cable installation contractor. The contractor will be in charge of establishing a grid connection between an onshore transformer substation and one or several offshore Wind farms located in the offshore wind farm cluster BorWin on the North Sea. The services include in particular the financing, design, construction, planning and maintenance […]

  • 27 March 2020
    Business & Finance, Grid Connection

    Copenhagen Infrastructure Partners (CIP) has bought minority stakes in joint venture companies related to the operation of four grid connection systems in the German sector of the North Sea: BorWin1, BorWin2, HelWin2, and DolWin2.

  • 7 October 2016
    Grid Connection

    Transmission systems operator TenneT and Siemens have held a topping-out ceremony for the Emden/Ost converter station, part of the 900MW BorWin3 grid connection project. The land station Emden/Ost is an essential element for the grid connection of offshore wind farms, TenneT said. With the BorWin3 project a high voltage direct current (HVDC) transmission will be realized […]

  • 29 August 2018
    Grid Connection

    Drydocks World – Dubai has completed the topside for the 900MW BorWin gamma HVDC platform, which will soon sail to its offshore site in the German part of the North Sea, where it is expected to arrive mid-September. 

  • 8 October 2018
    Grid Connection

    The BorWin gamma topside has completed its journey from Dubai to the installation site in the German North Sea, TenneT reports.

  • 11 October 2018
    Grid Connection

    The BorWin gamma topside has been installed onto its jacket foundation at the offshore site in the German North Sea.

  • 30 January 2015
    Grid Connection

    Siemens has handed over the first North Sea grid connection, BorWin2, to TenneT following successful completion of test runs. The offshore platform of the BorWin2 grid connection is located around 100 kilometers off the German coast – northwest of the island of Borkum, after which the project was named. “This is the first offshore grid […]

  • 14 May 2019
    Grid Connection

    Corrosion Protection Consult GmbH has signed a contract to provide corrosion protection inspection on the BorWin gamma converter station in the German North Sea. The contract started recently and is expected to be completed by the end of June. The scope of work includes monitoring and inspection of the coating works at the newly installed converter […]

  • 27 August 2024
    Contracts & Tenders, Fixed-Bottom, Grid Connection, Offshore Platforms, Operations & Maintenance, Supply Chain, Vessels

    TenneT has invited tenders for the provision of a platform supply vessel (PSV) and crew to conduct supply tours to TenneT’s offshore platforms in the German North Sea. According to a contract notice issued on 21 August, the transmission system operator (TSO) will award a multiple-year charter contract for an initial duration of five years, […]

  • 16 February 2015
    Business & Finance, Grid Connection, R&D, Wind Farm Update

    DC Netz BorWin3 GmbH has awarded a contract to N-Sea Offshore Wind BV to undertake unexploded ordnance (UXO) surveys at BorWin3 site.  Specifically, the work covers surveying of the seabed to help the identification and removal of undiscovered ordnance along the cable route of BorWin3. The planned BorWin3 submarine cable connection is a DC power transmission link with a […]

  • 20 August 2018
    Contracts & Tenders

    Petrofac has hired SeaRenergy to support the hook-up and commissioning of TenneT’s 900MW BorWin3 HVDC platform (BorWin Gamma), once the topside is installed on top of its foundation already in place at the site off Germany.

  • 7 February 2017
    Grid Connection

    The transformer for TenneT’s substation, which will collect and distribute the electricity from the BorWin3 offshore grid connection, has been transported on Saturday from the seaport in Emden to the site at Emden/Ost in the northwest of Germany.

  • 13 June 2017
    Business & Finance, Grid Connection

    Transmission system operator (TSO) TenneT Holding B.V. has launched and priced another Green Bond issue under its green bond program of EUR 1 billion.

  • 20 October 2014
    Contracts & Tenders, Grid Connection

    TenneT-owned DC-Netz BorWin4 GmbH is inviting tenders for BorWin4 connection system located in the North Sea. BorWin4 is a 900MW system for transmitting electrical power between offshore wind farms in the BorWin Cluster and a grid connection point on land. The project comprises onshore and offshore converter station, as well as an offshore platform. The […]