A list of search results

  • 17 March 2021
    Ports & Logistics, Wind Farm Update

    The first wind turbine tower section built for the 900 MW Greater Changhua 1 and 2a offshore wind farm has arrived at the Port of Taichung, Taiwan, Ørsted, the developer of the project, said. This is the first of 333 tower sections in total that are being manufactured locally by the consortium of CS Wind […]

  • 22 February 2021
    Contracts & Tenders, Grid Connection

    CWind Taiwan has secured a contract by Van Oord to charter a survey vessel for the nearshore cable route survey at the Greater Changhua 1 & 2a offshore wind project in Taiwan. Starting this March, CWind Taiwan will use Ocean Surveyor 3 to support Van Oord in conducting multibeam surveys of the wind farm. According […]

  • 18 February 2021
    Authorities, Business & Finance

    UK Export Finance (UKEF) is providing a GBP 200 million buyer credit guarantee to help finance the Greater Changhua 1 offshore wind farm in Taiwan. UK companies Seajacks and Trelleborg have already capitalized on UKEF’s support by winning export contracts with project developer Ørsted. Seajacks will ship the material needed to install the turbines and Trelleborg’s […]

  • 5 February 2021
    Wind Farm Update

    EEW Group has completed the production and delivered 123 pin piles for Ørsted’s Greater Changhua 1 & 2a offshore wind project in Taiwan. The production of the pin piles took place from December 2019 until the end of January 2021 at EEW KHPC in South Korea. The project was executed on time and with zero […]

  • 29 December 2020
    Business & Finance

    A consortium comprising Caisse de dépôt et placement du Québec (CDPQ) and Taiwanese private equity fund Cathay PE is acquiring a 50 per cent ownership share in Ørsted’s 605 MW Greater Changhua 1 offshore wind farm in Taiwan for approximately TWD 75 billion (around EUR 2.2 billion). Under the agreements Ørsted signed with the consortium […]

  • 13 October 2020
    Wind Farm Update

    The first batch of jacket foundation pin piles has been completed for Ørsted’s Greater Changhua 1 & 2a offshore wind project in Taiwan. The first 112 pin piles, around one third of the total needed for the 900 MW project, were made by Taiwanese suppliers Century Wind Power (CWP) and Formosa Heavy Industries (FHI), as […]

  • 30 July 2020
    Wind Farm Update

    A joint venture of Mammoet and Giant Heavy Machinery Services has started working with Sing Da Marine Structure Corporation (SDMS) on the locally-produced jacket foundations for the Greater Changhua offshore wind project in Taiwan. The joint venture will be performing the assembly, transportation and load-out of the jackets, each weighing approximately 1,200t. The PTC200-DS Ring […]

  • 17 June 2020
    Grid Connection, Wind Farm Update

    Construction of the onshore substations and transmission system for the Greater Changhua 1 & 2a offshore wind project in Taiwan is moving full speed ahead, according to Ørsted. Ørsted stated it is working with Star Energy Corporation (SEC), a subsidiary of EPC contractor Taiwan Cogeneration Corporation, to implement the highest Quality, Health, Safety and Environment […]

  • 20 May 2020
    Contracts & Tenders

    LOC Group has secured a contract with Ørsted to provide marine warranty survey services (MWS) for the Greater Changhua 1 & 2a offshore wind farms in Taiwan. Under the agreement, LOC will provide MWS services for the transportation and installation of the inter-array and export cables. Technical document review and operational approvals will be undertaken […]

  • 22 April 2020
    Contracts & Tenders

    Pulse Structural Monitoring has won a contract to provide digital structural monitoring and insight services and equipment for Ørsted’s Greater Changhua offshore wind project in Taiwan. Pulse is in charge of providing the design, fabrication, yard installation and commissioning of the monitoring instrumentation on three wind turbine foundations. The Acteon company said it will supply […]

  • 21 April 2020
    Wind Farm Update

    Heerema Fabrication Group is set to manufacture the pre-piling template for the Greater Changhua offshore wind project in Taiwan. The template, which will enable Heerema Marine Contractors to install the piles accurately, consists of three pile sleeves connected by framing, including hydraulically adjustable pile guides and mudmats. Heerema Vlissingen will fabricate the steel structure and […]

  • 26 November 2019
    Grid Connection

    Ørsted has contracted Trelleborg to provide the NjordGuard cable protection system (CPS) for the Greater Changhua 1 & 2a offshore wind project in Taiwan. Trelleborg will provide 235 NjordGuard cable protection systems and bellmouths, which will protect all inter-array and export cables on the wind farms. Production will be carried out at Trelleborg’s manufacturing facility […]

  • 8 November 2019
    Grid Connection, Wind Farm Update

    Ørsted has held a groundbreaking ceremony to mark the kick-off of the onshore substation construction for the Greater Changhua 1 & 2a offshore wind project in Taiwan. In November 2018, Ørsted awarded an EPC contract to Taiwan Cogeneration Corporation (TCC) to build two onshore substations, cable corridors and transition joint bays for the 900MW project. […]

  • 22 August 2019
    Contracts & Tenders, Wind Farm Update

    Seajacks International has won a contract by Ørsted for the transport and installation of turbines at the Greater Changhua 1 and 2a offshore wind projects in Taiwan. Seajacks is planning to use its jack-up vessel Seajacks Scylla for the transport and installation of 111 Siemens Gamesa 8MW turbines at the project site located 35-50km off the coast of […]

  • 9 August 2019
    Contracts & Tenders

    Heerema Marine Contractors (HMC) has secured a contract for the transport and installation of turbine foundations and the installation of offshore substations at the Greater Changhua 1 and 2a offshore wind projects in Taiwan. HMC will utilize its vessel Aegir for the transportation and installation of 111 turbine foundations and the installation of two offshore substations at […]

  • 20 June 2019
    Business & Finance, Wind Farm Update

    Ørsted has signed a guaranteed five-year syndicated green revolving loan facility for its Greater Changhua offshore wind projects in Taiwan. The NTD 25 billion (circa EUR 714.3 million) green facility attracted 15 banks to join in less than two months, which represents the first time local state-owned banks are involved in financing offshore wind projects, Ørsted said. Ørsted will now […]

  • 13 May 2019
    Grid Connection, Wind Farm Update

    Singapore-based Keppel FELS Ltd has secured a contract from Ørsted to provide two offshore substations for the Greater Changhua wind sites in Taiwan. Valued at more than SGD 150 million (around EUR 98 million), the contract comprises detailed engineering, procurement, construction, testing and commissioning for two 600MW substations. It excludes certain electrical components to be […]

  • 13 December 2018
    Business & Finance

    Ørsted has appointed the Bank of Taiwan, Cathay United Bank and BNP Paribas as lead arrangers for financing the Greater Changhua offshore wind projects in Taiwan.

  • 24 October 2018
    Contracts & Tenders, Wind Farm Update

    Ørsted has signed a contract with CSBC Corporation for the manufacture of ”a significant number” of wind turbine foundation pin-piles for the first 900MW Greater Changhua projects in Taiwan.

  • 12 September 2018
    Business & Finance, Contracts & Tenders

    Ørsted has awarded its Taiwanese partner Woen Jinn Harbour Engineering (WJ) with a contract for the inter-array cable installation at the Greater Changhua offshore wind projects.

  • 27 April 2018
    Contracts & Tenders, Operations & Maintenance, Vessels

    Ørsted has signed a Memorandum of Understanding (MoU) with Taiwan Navigation and Eastern Navigation for the development of a local service operations vessel (SOV) solution for the Greater Changhua offshore wind project in Taiwan.

  • 24 April 2018
    Contracts & Tenders, Operations & Maintenance, R&D, Vessels, Wind Farm Update

    Ørsted has signed a contract with Taiwan-based EGST to conduct three geophysical surveys at the offshore site of the Greater Changhua wind project in Taiwan.

  • 2 April 2018
    Business & Finance, Contracts & Tenders, Grid Connection, Operations & Maintenance, Wind Farm Update

    Ørsted has assigned CR Classification Society to perform a structural review of the offshore substation design for the Greater Changhua offshore wind projects in Taiwan.

  • 7 March 2018
    Business & Finance, Wind Farm Update

    Ørsted plans to finance the Greater Changhua offshore wind projects by capital contributions from the Ørsted Group combined with debt capital sourced from local Taiwanese financial institutions.

  • 1 December 2017
    Business & Finance, Contracts & Tenders, Grid Connection, Operations & Maintenance, R&D, Wind Farm Update

    Ørsted has signed a Memorandum of Understanding (MoU) with Woen Jinn Harbour Engineering to make the Taiwanese company the preferred offshore cable installation partner for the Greater Changhua offshore wind projects.