Search results for: SG 11.0-200 DD

87 results

A list of search results

  • 29 September 2023
    Business development, Fixed-Bottom, Floating Wind, R&D, Supply Chain, Technology, Wind Turbines

    The wind turbine blade test centre Blaest in Aalborg, Denmark, inaugurated a new test rig on 26 September, in which the centre decided to invest after entering an agreement with Siemens Gamesa to test the company’s current range of offshore blades. The first blade is already being put through paces on the new test rig […]

  • 24 October 2023
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update

    Vattenfall and France-based Air Liquide have signed a power purchase agreement (PPA) covering 115 MW of capacity of the 1.5 GW Hollandse Kust Zuid, one of the largest offshore wind farms in the world. Contracted over a 15-year period beginning in 2026, the PPA will bring the overall renewable power capacity available to Air Liquide […]

  • 12 June 2023
    Contracts & Tenders, Ports & Logistics

    Siemens Gamesa has selected Køge Port in Denmark as the planned location for the pre-assembly and installation of wind turbines for the Aflandshage offshore wind farm. The Aflandshage offshore wind farm will feature up to 26 Siemens Gamesa’s SG 11.0-200 DD offshore wind turbines with an individual capacity of between 9.5 MW and 11 MW, […]

  • 20 June 2023
    Wind Farm Update

    The 759 MW Hollandse Kust Noord offshore wind farm has produced its first green power and delivered it via TenneT’s offshore grid to the Dutch mainland. “We often talk about milestones along a project’s journey, and CrossWind has had a number to date, but to have the wind turbines generating green electricity safely and successfully […]

  • 9 June 2023
    Contracts & Tenders, Grid Connection, Wind Farm Update

    The Correll Group, Electrical Engineering Division has secured a contract with Prysmian Powerlink for the testing and terminations of the 66 kV inter-array cables and offshore substation topside on the GodeWind 3 and Borkum Riffgrund 3 offshore wind farms in Germany. The project will be completed in three phases, said the Correll Group. The first […]

  • 3 October 2023
    Fixed-Bottom, Project Updates, Wind Farm Update

    66 out of 69 wind turbines have been installed at the 759 MW Hollandse Kust Noord (HKN) offshore wind farm in the Dutch North Sea. The Hollandse Kust Noord offshore wind farm will feature 69 Siemens Gamesa’s SG 11.0-200 DD wind turbines. The first unit was installed in April this year by the jack-up Seajacks Scylla. […]

  • 20 October 2023
    Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    The 69th and final Siemens Gamesa SG 11.0-200 DD wind turbine was installed at the 759 MW Hollandse Kust Noord wind farm in the Dutch North Sea on Thursday, 19 October, CrossWind, the owner and developer of the wind farm said. The final turbine’s three 97-metre long blades were lifted into position on Thursday evening, […]

  • 29 September 2023
    Fixed-Bottom, Project Updates, Wind Farm Update

    Dutch King Willem-Alexander and board members of Vattenfall, BASF, and Allianz officially inaugurated the offshore wind farm Hollandse Kust Zuid 1-4 on 29 September. Having 139 wind turbines and an installed capacity of 1.5 GW, Hollandse Kust Zuid is one of the largest offshore wind farms in the world. The subsidy-free 1.5 GW wind farm, […]

  • 14 July 2023
    Contracts & Tenders

    CrossWind has awarded Rosetti Marino an Engineering, Procurement, Construction, and Installation and Commissioning (EPCIC) contract for an offshore green hydrogen production and storage plant, located within CrossWind’s Hollandse Kust Noord offshore wind farm in the Netherlands. Rosetti Marino said that the pilot plant, called the Baseload Power Hub and fully integrated into an offshore wind […]

  • 14 August 2023
    Business development, Technology

    The Vestas V236-15.0 MW™ prototype offshore wind turbine has set a world record for the most power output by a single wind turbine in a 24-hour period, producing 363 megawatt-hours in that time span, the Danish wind turbine manufacturer said. The prototype was installed at the Østerild National test centre for large wind turbines in […]

  • 4 July 2023
    Environment, Wind Farm Update

    Copenhagen’s power supply company HOFOR has contracted Per Aarsleff A/S (Aarsleff) for the supply of foundations for the Aflandshage offshore wind farm that will be built in the Øresund Strait. The contract includes Nature-Inclusive Design, which will see artificial reefs being built at Aflandshage to house cod, crabs and other small marine wildlife. The artificial […]

  • 17 July 2023
    Authorities, Wind Farm Update

    The US Bureau of Ocean Energy Management (BOEM) is expected to soon announce its decision on whether to approve the Revolution Wind offshore wind farm as the federal agency has now completed the environmental analysis of the project, which Ørsted and Eversource plan to build offshore Rhode Island. BOEM issued the Final Environmental Impact Statement (FEIS) […]

  • 6 November 2023
    Business & Finance, Contracts & Tenders, Fixed-Bottom, Planning & Permitting, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    Several days ago, Ørsted called it quits on the Ocean Wind 1 offshore wind farm in the US, with some of the main issues leading to the decision to abandon the project being supply chain bottlenecks, primarily vessel shortages. This has affected not only the now-dropped Ocean Wind 1 but also the company’s Revolution Wind […]

  • 17 April 2023
    Vessels, Wind Farm Update

    The first of 69 wind turbines has been installed at the 759 MW Hollandse Kust Noord offshore wind project in the Dutch North Sea. The offshore wind farm, located some 18.5 kilometres off the coast of Egmond aan Zee in the Netherlands, is developed by CrossWind, a joint venture between Shell and Eneco. The wind […]

  • 17 April 2023
    Contracts & Tenders, Vessels, Wind Farm Update

    Danish wind farm installation vessel owner and operator Cadeler A/S has signed a contract with Siemens Gamesa for the transportation and installation of 26 Siemens Gamesa’s SG 11.0-200 DD wind turbines at the Aflandshage offshore wind farm. This will be the first time in several years, the company will be back on home ground to install wind […]

  • 23 March 2023
    Business development, Innovation, Research & Development, Technology

    The SG 14-236 DD prototype, Siemens Gamesa’s largest ever wind turbine, has produced its first power and delivered it to the grid. With 115-metre-long blades and a rotor diameter of 236 metres, the turbine’s capacity of up to 15 MW with Power Boost allows it to produce 30 per cent more energy than its predecessor, […]

  • 3 April 2023
    Grid Connection, Wind Farm Update

    The Dutch-German transmission system operator (TSO), TenneT, has announced that the grid connection for the 759 MW Hollandse Kust Noord offshore wind farm is ready for commissioning. Now the wind farm’s operator, CrossWind, can connect the 69 Siemens Gamesa’s SG 11.0-200 DD 11 MW wind turbines to the offshore substation located some 20 kilometres off the […]

  • 9 March 2023
    Contracts & Tenders

    Muehlhan Wind Service (MWS) has signed a contract with Siemens Gamesa for pre-assembly work for the Hollandse Kust Noord offshore wind farm, currently being built in the Netherlands by CrossWind, a joint venture of Shell and Eneco. Under the full-scope pre-assembly contract, MWS will be responsible for mechanical and electrical pre-assembly, crane/lifting operations, and the complete […]

  • 27 February 2023
    Wind Farm Update

    100 out of the 140 Siemens Gamesa 11.0-200 DD wind turbines have been installed at the 1.5 GW Hollandse Kust Zuid, the world’s first subsidy-free offshore wind farm and soon to be the largest offshore wind farm in operation. ”We have finished the installation of offshore wind turbine number 100 at the Hollandse Kust Zuid […]

  • 23 February 2023
    Business development, Technology

    Siemens Gamesa completed the installation of its prototype SG 14-236 DD offshore wind turbine on 22 February. The wind turbine, which can reach a capacity of up to 15 MW with the company’s Power Boost feature, will now be put through paces at the Danish national test centre for large wind turbines in Østerild. The […]

  • 16 February 2023

    Siemens Gamesa has installed the first of the three 115-metre blades on the SG 14-236 DD offshore wind turbine prototype at the Danish national test center for large wind turbines in Østerild. The SG 14-236 DD features a 236-metre diameter rotor, with a 43,500 m2 swept area, approximately the size of 6.1 standard football pitches. […]

  • 20 February 2023
    Technology, Wind Farm Update

    CrossWind, a joint venture between Shell and Eneco developing the 759 MW Hollandse Kust Noord wind farm off the Netherlands, has signed a contract with Elogen, a Gaztransport & Technigaz (GTT) group company, to design and manufacture a Proton Exchange Membrane (PEM) electrolyser with a power of 2.5 MW. The electrolyser will convert the green […]

  • 7 October 2022
    Contracts & Tenders, Wind Farm Update

    Sif Group has completed the first two of the 70 monopiles to be manufactured for CrossWind’s 759 MW Hollandse Kust Noord offshore wind farm in the Netherlands. With a combined weight of 64,356 tonnes, the 70 monopiles are designed in such a manner that they do not require transition pieces. The design is said to […]

  • 9 February 2023
    Wind Farm Update

    Van Oord has installed the final monopile for CrossWind’s Hollandse Kust Noord (HKN) offshore wind farm at the construction site some 18.5 kilometres off the coast of Egmond aan Zee in the Netherlands. Van Oord, as a Balance of Plant contractor for CrossWind, installed all 70 monopiles at the construction site with the first unit […]

  • 30 January 2023
    Operations & Maintenance, Vessels, Wind Farm Update

    The first wind turbine parts for the 759 MW Hollandse Kust Noord (HKN) offshore wind project arrived in the Dutch port of Eemshaven last week. The tower sections were transported on the roll on/roll off (Ro-Ro) vessel Rotra Vente, operated by Deugro. The vessel arrived at the port under the agency of Amasus Agency Eemshaven, Delfzijl. […]

  • 30 June 2020
    Contracts & Tenders, Wind Farm Update

    Vattenfall has placed a firm order with Siemens Gamesa for 140 SG 11.0-200 DD wind turbines to be installed at the Hollandse Kust Zuid wind farm off the Netherlands. The Swedish offshore wind developer opted for Siemens Gamesa’s 11 MW turbine model with a 200-metre diameter rotor, and not the SG 11.0-193 DD Flex model […]