Eagle Claw plans to build wind turbine manufacturing center at Port of Muskogee (USA)
Eagle Claw on Tuesday announced plans to build a 150,000-square-foot manufacturing center at the Port of Muskogee.
The center, which is…
Jay F. Marks
[mappress]
Source: newsok, June 30, 2010;
Related news
List of related news articles
-
Posted: 4 days ago
Fraunhofer IWES Wraps Up Survey in Baltic Sea
Fraunhofer IWES has conducted a boulder detection and geohazard survey of 50 turbine locations and t...
Posted: 4 days ago -
Posted: about 1 month ago
Teesworks OW Manufacturing Site Secures Planning Permit
Planning permission has been granted for an offshore wind manufacturing site at Teesworks on the sit...
Posted: about 1 month ago -
Posted: 2 months ago
First Triton Knoll Turbine Parts Arrive at Able Seaton Port
The first turbine blades to be installed on the Triton Knoll offshore wind farm have arrived at Able...
Posted: 2 months ago -
Posted: about 1 month ago
Construction Manager Wanted for New Jersey Wind Port
The New Jersey Economic Development Authority (NJEDA) has issued a Request of Qualifications for con...
Posted: about 1 month ago