10000 results found for 'turbine'

10000 results found for 'turbine'
Order results by

A list of search results

  • 10 August 2021
    Operations & Maintenance, R&D, Technology

    Scientists at the National Renewable Energy Laboratory (NREL) have developed a lightning protection system for wind turbine blades using a new composite and an innovative thermal welding process. Created in partnership with General Electric and LM Wind Power and with funding from the US Department of Energy’s Technology Commercialization Fund, the wind turbine ”lightning shield” […]

  • 20 May 2021
    R&D, Technology

    The Fraunhofer IWES is now starting construction work on a third rotor wind turbine blade test bench at its Großer Westring site in Bremerhaven, Germany. Once complete, the bench will be used to test state-of-the-art prototypes measuring 115 metres in length and even more. Some EUR 19 million are set to be invested in the […]

  • 18 August 2023
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up vessel Brave Tern has installed 31 out of 62 Siemens Gamesa SG 8.0-167 DD wind turbines at the Saint-Brieuc offshore wind farm in France. The first wind turbine was installed in May on position number SB44, located in the northern part of the offshore construction site. The wind turbines are manufactured […]

  • 20 September 2022
    Wind Farm Update

    A set of wind turbine towers for the Saint-Brieuc offshore wind farm in France has arrived in Brest on board the Rotra Mare vessel. In Brest, the towers will undergo final outfitting ahead of installation in the Bay of Saint-Brieuc in the English Channel. The towers are being delivered by Haizea Breizh, the French subsidiary […]

  • 13 July 2022
    Vessels, Wind Farm Update

    Cadeler has signed a Vessel Reservation Agreement with ScottishPower Renewables for the transportation and installation of 95 wind turbines for the 1.4 GW East Anglia Three offshore wind farm. In February 2021, ScottishPower Renewables selected Siemens Gamesa as the preferred bidder to supply and install 14+ MW wind turbines on East Anglia Hub, including East Anglia Three, […]

  • 22 October 2018
    Contracts & Tenders, Jobs & Recruitment, Ports & Logistics, Wind Farm Update

    Ørsted has selected Siemens Gamesa Renewable Energy as the preferred supplier for the Greater Changhua offshore wind farms with a combined capacity of 900MW.

  • 5 July 2018
    Wind Farm Update

    The first of the total of 60 wind turbines has been installed at the Arkona offshore wind farm, located off the coast of Rügen in the German Baltic Sea.

  • 15 August 2019
    Wind Farm Update

    Jan De Nul’s vessel Taillevent has installed the first turbine at the Trianel Windpark Borkum II (TWBII) offshore wind farm. The 200MW TWBII wind farm will comprise 32 Senvion 6.2M152 turbines installed on monopile foundations at the site some 40km north of the island of Borkum in the German North Sea. Taillevent is loading the turbine components in sets […]

  • 26 February 2019
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up Bold Tern has departed from Hull, the UK, carrying the second batch of turbines for the Hornsea Project One offshore wind project. The vessel installed the first Siemens Gamesa 7MW turbine at the site some 120km off the Yorkshire coast in early February. Bold Tern is in charge of transporting and installing half […]

  • 19 February 2019
    Business & Finance

    MHI Vestas has reached a milestone for its V164 turbine model with the installation of the 200th unit. According to MHI Vestas, the milestone turbine has been installed at the Norther offshore wind farm in Belgium. It is the fifth out of 44 8.4MW turbines to be installed at the 370MW project. Van Oord’s installation vessel Aeolus started […]

  • 23 February 2018
    Vessels, Wind Farm Update

    The Seafox 5 jack-up has left the Port of Eemshaven in the Netherlands loaded with the first set of turbine components to be installed on the 396MW Merkur offshore wind farm in the German North Sea.

  • 29 December 2017
    Operations & Maintenance, R&D, Wind Farm Update

    Fred. Olsen Windcarrier has recently posted a video showing the turbine installation process on Iberdrola’s 350MW Wikinger offshore wind farm in the German Baltic Sea.

  • 19 September 2017
    Vessels

    MPI Offshore’s wind turbine installation vessel MPI Adventure has left the Port of Esbjerg, Denmark, with a final set of turbine components to be installed on the 400MW Rampion offshore wind farm.

  • 16 August 2017
    Wind Farm Update

    The final floating wind turbine for the Hywind Scotland project has been towed to the site and installed at its designated location off Peterhead, Scotland, according to BBC.

  • 6 November 2017
    Technology, Wind Farm Update

    Doosan Heavy Industries & Construction has acquired the prototype turbine, design, and rights to manufacture and sell a 5.5MW wind turbine developed by Hyundai Electric & Energy Systems and AMSC. Doosan will supply the 5.5MW units – the country’s most powerful domestically produced offshore wind turbines – to the first phase of the Southwest Offshore Wind Project.

  • 7 May 2018
    Wind Farm Update

    A2Sea’s jack-up installation vessel Sea Installer left the Port of Ostend, Belgium, on 5 May with the first 7MW Siemens Gamesa wind turbines destined for installation at the 309MW Rentel offshore wind farm in the Belgian North Sea.

  • 4 May 2018
    R&D, Technology

    Principle Power has joined a project led by German turbine manufacturer Senvion to develop the Next Generation 10+MW rated, Robust, Reliable and Large Offshore Wind Energy Converters for Clean, Low Cost and Competitive Electricity (ReaLCoE).

  • 6 October 2017

    With just a few days to go before the annual Offshore Energy Exhibition and Conference kicks off with a bang – or rather with a gala dinner – we are now presenting you Saitec Offshore, one of 11 companies to present at the event’s brand new start-up zone.

  • 24 May 2017
    Vessels, Wind Farm Update

    Wind farm installation vessels (WFIVs) Seajacks Scylla and Bold Tern are getting ready to install the last turbines at Iberdrola’s 402MW Veja Mate offshore wind farm in the German North Sea.

  • 4 May 2017
    Vessels, Wind Farm Update

    Wind turbine installation vessel (WTIV) Pacific Orca has arrived to the Peel Ports Great Yarmouth to load Siemens wind turbine components ahead of her first trip to the 336MW Galloper offshore wind farm.

  • 18 June 2024
    Business & Finance, Contracts & Tenders, Operations & Maintenance, Supply Chain

    Danish wind turbine manufacturer Vestas has awarded its compatriot Maersk a contract for transporting the extra heavy powertrains of its largest ever-built wind turbine V236. The heart piece of the 15 MW wind turbine weighs 260 tonnes alone and will be installed in the nacelle in Vestas’ factory in Lindø, Denmark. Maersk will manage the […]

  • 19 March 2024
    Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update, Wind Turbines

    The installation of Siemens Gamesa’s 14 MW wind turbines at the Moray West offshore wind farm site in Scotland is scheduled to start in April. The vessel chartered to install the turbines, Cadeler’s Wind Orca, has just arrived in Esbjerg, Denmark, to mobilise for the project after completing a crane upgrade in the Netherlands. In […]

  • 29 September 2020
    Business & Finance, Ports & Logistics

    Siemens Gamesa has begun the construction of its offshore wind turbine plant in the Port of Le Havre, France. The company revealed earlier this summer that the consortium led by GTM Normandie-Centre is in charge of the turbine plan construction. As part of the consortium, ENGIE Solutions is responsible for all technical trades for the […]

  • 13 July 2020
    Technology, Wind Farm Update

    China’s first 10 MW offshore wind turbine was connected to the grid on July 12 at Xinghua Bay Wind Farm Phase II off the Fujian province. Dongfang Electric Corporation (DEC) sent off the prototype 10 MW offshore anti-typhoon wind turbine from its factory to the project site at the end of June. The height of […]

  • 5 May 2020
    Operations & Maintenance, Ports & Logistics, Vessels

    The walk-to-work vessel Wind Innovation is currently deployed at the Borkum Riffgrund 2 offshore wind farm in Germany, where a wind turbine upgrade campaign is under way. During the last week of April, the vessel mobilised for the project at DHSS support base in Eemshaven, the Netherlands, according to DHSS. The Wind Innovation arrived to […]

  • 24 April 2020
    Contracts & Tenders, R&D

    DTU Wind Energy has opened a tender for the lease of test stands at the Høvsøre test center for large wind turbines. The call for tenders is conducted as an open procedure and therefore only comprises one phase. The deadline for submitting applications is 28 May by 16:00 local time. In June 2018, the Danish […]