10000 results found for 'first'

10000 results found for 'first'
Order results by

A list of search results

  • 17 June 2012
    Business & Finance, Wind Farm Update

    Principle Power, Energias de Portugal, Repsol, A. Silva Matos (ASM), Vestas Wind Systems A/S and InovCapital announced the inauguration of Portugal’s first offshore wind turbine on June 16th, 2012. The turbine is installed on an innovative floating foundation called the WindFloat. In addition to being the first offshore wind turbine in Portugal, this is the first offshore wind turbine to be […]

  • 29 September 2020
    Wind Farm Update

    Bladt Industries has completed the load out of the first transition pieces (TPs) for the Hornsea Two offshore wind farm at its facilities in Aalborg. In mid-September, the company carried out the load-out of the first six anode cages built for the 1.4 GW offshore wind project, saying the first six transition pieces would soon […]

  • 14 November 2014
    Training & Education

    The UMass Wind Energy IGERT presented their research up at University of Maine at the Advanced Structures and Composite Center. They were hosted by Habib Dagher, the director of the center, and got a chance to visit VolturnUS, a 65-foot-tall floating turbine prototype that is 1:8th the scale of a 6-megawatt (MW), 423-foot rotor diameter […]

  • 26 May 2023
    Grid Connection, Industry, Infrastructure, Wind Farm Update

    Ørsted and Eversource have marked the sail away of the first American-built offshore wind substation, which departed a Texas fabrication facility and is en route to the US East Coast. The substation is transiting across the Gulf of Mexico and then up the East Coast for installation at the South Fork Wind project site in […]

  • 29 September 2010
    Technology

    CarboCAT® is a catamarn built with carbon fibre composite technology. It can be built in many sizes and adapted to suit many different purposes – from sea ambulances to large passanger ferries. Kockums first CarboCAT®, named CarboClyde, is adapted to the maintenance of off-shore wind power stations. The ship was delivered to the buyer Fintry […]

  • 20 March 2020
    Wind Farm Update

    Fugro has completed the first tranche of offshore site investigations at innogy’s Sofia offshore wind project in the UK. The first tranche is complete with the multi-purpose vessel Fugro Pioneer having finished the geophysical survey of the wind farm’s export cable corridor. According to innogy, the vessel will be back to carry out more survey […]

  • 11 August 2010
    Business & Finance

    Adjusted EBIT up 11 percent year on year. 2,800MW of new, climate-friendly generating capacity enters service. 2010 forecast unchanged – adjusted EBIT expected up 0 to 3 percent and adjusted net income at prior-year level. Following a strong first quarter, Düsseldorf-based energy company, E.ON recorded significant increases in its key financial figures for the first […]

  • 11 April 2022
    Wind Farm Update

    France is currently one blade short of having its first commercial offshore wind turbine as the team on board the vessel Vole au vent is completing the installation of the first GE Haliade 150-6MW unit at the Saint-Nazaire offshore wind farm site. Jan De Nul’s jack-up vessel sailed out of the Nantes-Saint Nazaire Port last […]

  • 6 February 2013

    On February 4, EWEA 2013 kicked off in Vienna, Austria. The following are videos bringing details on the first two days of the event: Day One: At the opening of Europe’s leading wind energy event, politicians and high level industry representatives also spoke of the need to secure the further growth of wind energy in Europe […]

  • 18 April 2012

    Moventas, one of the industry’s leading wind gear manufacturers, and The Switch, a leading supplier of megawatt-class permanent magnet generator and full-power converter packages, today announced they are delivering the first commercial order for FusionDrive®, the smartest gear and generator combination in the market. The first delivery is going to Germany-based DeWind, one of the […]

  • 19 February 2020
    Grid Connection

    Fred. Olsen Windcarrier has completed its first-ever offshore wind cable job.

  • 30 November 2015
    R&D, Technology

    The first of the two tidal turbines to be deployed on the Paimpol-Bréhat experimental site off France has completed its sea trials and is ready for deployment at the site off Ploubazlanec, France, according to DCNS. The turbine underwent a series of tests in the harbor of Brest to verify its mechanical and electrical performance. Positioned […]

  • 20 June 2017
    Wind Farm Update

    The first of the total 5 turbines for the Hywind Scotland project has been lifted onto its floating foundation in Stord, Norway, and is ready for the deployment off the Scottish coast.

  • 13 April 2020
    Wind Farm Update

    The first Siemens Gamesa 8 MW turbine has been installed on the 752 MW Borssele 1+2 offshore wind farm in the Dutch North Sea. The team working on DEME’s jack-up Sea Challenger installed the wind farm’s first turbine over the weekend, Ørsted said. In total, the wind farm will comprise 94 of the Siemens Gamesa […]

  • 14 June 2017
    Operations & Maintenance, Wind Farm Update

    German wind turbine maker Senvion has been appointed by Beleolico Srl, a Belenergia S.A. affiliate, as the supplier for the 30MW Taranto offshore wind farm.

  • 27 January 2021
    Wind Farm Update

    Fred. Olsen Windcarrier’s jack-up Bold Tern has returned to Port of Nigg after installing the first four Vestas (MHI Vestas) 9.5 MW wind turbines at the Moray East wind farm off Scotland. The 950 MW Moray East will feature 100 V164-9.5MW units installed at the site some 22 kilometres off the Aberdeenshire coast. The team […]

  • 17 May 2021
    Wind Farm Update

    Ørsted has started construction of the 2 MW H2RES offshore wind-to-hydrogen project in Denmark, for which the company reached a final investment decision (FID) in January. With a groundbreaking ceremony held on 17 May and led by Dan Jørgensen, the Danish minister for Climate, Energy & Utilities, Ørsted marked the onsite start of construction of […]

  • 8 February 2019
    Business & Finance, Vessels

    The Tokyo-based Penta-Ocean Construction Co. has taken delivery of Japan’s first offshore wind turbine installation vessel, which is now ready for first work. Penta-Ocean Construction, who ordered the CP-8001 vessel from Japan Marine United Corporation (JMU) in 2016, held the completion ceremony last week. According to the vessel designer GustoMSC, the delivery marks an important milestone […]

  • 26 January 2018

    Siemens Gamesa has completed the assembly of the first wind turbine nacelle in its offshore factory in Cuxhaven, Germany. 

  • 29 November 2024
    Fixed-Bottom, Foundations, Manufacturing, Project Updates, Supply Chain, Wind Farm Update

    First TP-less monopile for RWE’s Nordseecluster A offshore wind project has been completed at Dajin Heavy Industry’s Penglai facility in China. In a recent social media update, Dajin Heavy Industry announced that the Nordseecluster project represents a major milestone for the company, as it is their largest offshore monopile project to date, featuring 104 units. […]

  • 1 March 2018
    Operations & Maintenance, Ports & Logistics, Wind Farm Update

    ST3 Offshore has sent off a barge carrying the first three jackets for Ørsted’s Borkum Riffgrund 2 offshore wind farm from its serial manufacturing plant in Stettin, Poland, to Cuxhaven, Germany.

  • 21 March 2018
    Operations & Maintenance, Ports & Logistics, Vessels, Wind Farm Update

    Siemens Gamesa has shipped out the first nacelles for the 309MW Rentel offshore wind farm from Cuxhaven, Germany, to the installation port in Ostend, Belgium.

  • 1 November 2016
    Operations & Maintenance, R&D, Technology, Vessels

    UK-based Automated Ships Ltd and Norway’s Kongsberg Maritime have signed a Memorandum of Understanding to build the world’s first unmanned and fully-automated vessel for offshore operations. In January 2017, Automated Ships Ltd will contract ‘Hrönn’, which will be designed and built in Norway in cooperation with Kongsberg, and will be in operation in 2018, the […]

  • 19 January 2021
    Technology, Wind Farm Update

    MingYang Smart Energy’s MySE8.3-180 hybrid drive offshore wind turbine has made its debut at the Xinghua Bay II offshore wind farm, the Chinese turbine maker said. Unveiled in November 2019, the MySE8.3-180 turbine features 86.5-metre blades sweeping an area of 24,900 square metres, MingYang said. During the installation, a single blade installation was applied to […]

  • 12 April 2023
    Infrastructure, Vessels

    The first steel was cut for Huaxia Financial Leasing’s wind farm installation vessel at CIMC Haiyang Shipyard in China. Built by CIMC Raffles, the vessel will have 139 metres in length, a width of 50 metres, a depth of 10 metres, a 1,500-tonne leg-encircling crane with a working radius of 45 metres, and a 250-tonne […]

  • 5 January 2023
    Vessels

    Ulstein Verft has held a steel-cutting ceremony for the second Construction Service Operation Vessel (CSOV) that the company is building for the Norway-based shipowner Olympic Subsea ASA. The vessel, which carries yard number 319, is the second of two offshore wind newbuilds for which the shipowner signed a contract back in July 2022. In November […]