10000 results found for 'first'

10000 results found for 'first'
Order results by

A list of search results

  • 1 October 2021
    Business & Finance, Vessels

    Kokusai Cable Ship (KCS) and Mitsui O.S.K. Lines (MOL) have signed a Memorandum of Understanding (MoU) for collaborative operations of cable-laying vessels for the offshore wind market. The two Japanese companies plan to jointly research commercial opportunities in new subsea cable-laying demand, mainly for offshore wind projects in Japan and throughout Asia. MOL and its […]

  • 27 December 2021
    Grid Connection, Wind Farm Update

    The 802 MW Jiangsu Qidong, China’s largest offshore wind farm, achieved a full capacity grid connection on Saturday, 25 December. The Jiangsu Qidong offshore wind farm comprises three projects; H1, H2, and H3, each with an accompanying offshore booster station. The wind farm is located between 31 and 40 kilometres off the coast of Qidong, […]

  • 8 April 2021
    Business & Finance, Wind Farm Update

    UK’s independent energy supplier OVO Energy has entered into a power purchase agreement (PPA) with Ørsted to buy the output from the Barrow offshore wind farm. OVO Energy will purchase 100% of the power from the 90 MW Barrow wind farm which has been operational since 2006. By the end of the year, the company […]

  • 20 January 2021
    Technology

    GE Renewable Energy has officially received a type certificate from DNV GL for the Haliade-X offshore wind turbine with a 13 MW power output. The Haliade-X 12 MW prototype, installed in the Port of Rotterdam in 2019, obtained a full type certificate from DNV GL in November 2020. The prototype has then been optimized to […]

  • 7 December 2020
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Cable-monitoring company Marlinks has secured a contract to provide cable depth and temperature monitoring for the Norther offshore wind project in Belgium. Both the wind farm’s export and inter-array cables will be monitored using Marlinks’ technology. The company said that its DTS-based technology (Distributed Temperature Sensing) harnesses the power of optical fiber to continuously monitor […]

  • 6 February 2020
    Business & Finance

    Bech-Bruun has advised Marubeni Corporation and its partners on the legal and commercial matters in relation to the Akita Noshiro offshore wind project in Japan.

  • 20 November 2019
    Contracts & Tenders, Wind Farm Update

    Spain’s Tecade has won a contract to manufacture 20 transition pieces (TPs) for the 950MW Moray East offshore wind project in Scotland. The EUR 12.7 million contract has been secured through Navantia and through Nervión Industries, the company said. Work on the units has already started at Tecade’s plant in the Port of Seville. Tecade […]

  • 11 November 2019
    Vessels

    Vroon’s walk-to-work vessel VOS Start has begun operating at the Northwester 2 offshore wind project in Belgium. For the charter, VOS Start has been fitted with a three-dimensional motion-compensation system (3D Tip), with a lifting capacity of up to 5t. All operations are being conducted from the port of Ostend, with the vessel on duty […]

  • 11 September 2018
    Business & Finance, Operations & Maintenance

    Australia-headquartered Neptune and the Taiwanese subsea services company Global Aqua have formed a partnership to jointly work on offshore wind projects in Taiwan.

  • 21 December 2018
    R&D, Technology

    The Danish Government Scheme for Energy Technology Development and Demonstration Program (EUDP) has awarded DKK 16 million (more than EUR 2 million) to Rope Robotics.

  • 1 May 2018

    Rentel NV is holding an Open Yard Day for the Rentel offshore wind farm on 6 May in the Port of Ostend, Belgium.

  • 27 May 2019
    R&D

    Universal Foundation has begun industrialized suction bucket installation tests under a project that is part of the Energy Technology Development and Demonstration Program (EUDP). Universal Foundation is carrying out the EUDP project in a consortium with Siemens Gamesa, Aalborg University, Fred. Olsen Windcarrier and Offshoreenergy.dk. According to the company, the trial installation activity of the […]

  • 12 September 2019
    Contracts & Tenders

    Singapore’s Kim Heng Marine & Oilfield (KHMO) has secured a contract by a repeat customer to carry out Horizontal Directional Drilling (HDD) at an offshore wind project in South East Asia. The HDD contract, expected to commence in September, entails the implementation of a dirigible, trenchless technique and design for the installation of underground and subsea […]

  • 2 July 2019
    Wind Farm Update

    EnBW has installed 44 of the 87 Siemens Gamesa wind turbines on the Hohe See and Albatros offshore wind farms in the German North Sea. Fred. Olsen Windcarrier’s installation vessels Brave Tern and Blue Tern load the components for four wind turbines at a time at the port of Esbjerg in Denmark and attach them […]

  • 16 August 2019

    South Korean wind turbine manufacturer Doosan Heavy Industries & Construction has placed the second order with AMSC for its 5.5MW electrical control systems (ECS). The 5.5MW full conversion wind turbine design and prototype is the product of a joint development between South Korea-based Hyundai and AMSC. In November 2017, Doosan acquired the 5.5MW prototype, design, and rights to […]

  • 4 July 2017
    Operations & Maintenance, Vessels

    Denmark’s Northern Offshore Services has entered into a commercial agreement with the Hamburg-based Opielok Offshore Carriers to take on management of the company’s only crew transfer vessel (CTV) – OOC Nerz.

  • 6 September 2017
    Vessels

    Bibby Marine Services Limited held a naming ceremony for Bibby WaveMaster 1 in Rotterdam on Wednesday, 6 September.

  • 23 May 2016
    Vessels, Wind Farm Update

    Blue Water USA has been providing hub logistics services to General Electric (GE) in the Port of Providence, Rhode Island, for the 30 MW Block Island wind farm project since December 2015.  The scope of the services includes heavy lift and storage of turbine components for the first offshore wind farm in the United States, as […]

  • 23 May 2016
    Operations & Maintenance, Wind Farm Update

    Germany’s 8.2 Consulting AG has won a three-year extension of a contract for periodic inspections at the 288MW Meerwind Süd | Ost offshore wind farm. The contract extension follows the successful completion of the first periodic inspections at the wind farm last year. The contract was extended by WindMW GmbH, the operator of Meerwind. The extension puts WindMW in […]

  • 30 March 2015
    Operations & Maintenance

    Seajacks has completed Operations & Maintenance (O&M) project at Sheringham Shoal offshore wind farm. The company was commissioned by Statkraft, operator and joint owner, to support 2 gearbox changes at 317MW wind farm off the Norfolk coast. Seajacks provided specialist technicians, tooling and lifting equipment for the project, working closely with the Statkraft project team in […]

  • 31 March 2017
    Authorities, Wind Farm Update

    On 28 March, the UK Planning Inspectorate issued a report of recommendation on the East Anglia THREE offshore wind farm to the Secretary of State for Business, Energy and Industrial Strategy (BEIS), Greg Clark, who now has three months to issue a decision.

  • 24 August 2015

    DBB Jack-Up has appointed a new Chief Commercial Officer who will join the company from 1st October 2015. Ole Jacob Wang Nielsen has decided to pursue new ventures and will start his own consultancy company as of 1st September 2015. His first task will be to support the development of the Boom Lock system for […]

  • 5 November 2015

    Louisiana-based Keystone Engineering Inc. has been named the winner of this year’s Be Inspired Award for offshore innovation for its role in the Block Island Wind Farm. The award honors the work of organizations advancing infrastructure design, construction, and operations throughout the world. This year there were more than 360 nominations for Be Inspired Awards from […]

  • 4 April 2016
    Grid Connection, Vessels, Wind Farm Update

    A 1,888 tonne topside built for the high voltage substation of the 400 MW Horns Rev 3 offshore wind farm left Schiedam last weekend and is en route to Esbjerg, Denmark. The transportation of the topside is being carried out by Royal Wagenborg, using the company’s largest tug, Waterland, and the largest barge, Wagenborg Barge 9.  A specialized team of Wagenborg ballast engineers assisted […]

  • 12 January 2017
    Grid Connection, Operations & Maintenance, Technology

    Siemens’ direct drive offshore wind turbines have generated 2.5 terawatt hours (TWh) of electricity since the prototype 6MW direct drive turbine was installed at Høvsøre, Denmark in May 2011. To put the amount of electricity produced by its direct drive offshore wind turbines into perspective, Siemens said that 2.5TWh of electricity is enough to meet the annual […]

  • 24 May 2016
    Vessels, Wind Farm Update

    Subsea support vessel (SSV) VOS Sugar, the newest addition to Vroon’s fleet, has started work on the BARD Offshore 1 wind farm, supporting dive operations and maintenance work on wind-turbine foundations for NDE Offshore. NDE Offshore, a Sweden-based provider of subsea services, will conduct a combined topside and subsea campaign for the first time. The campaign comprises of […]