425 results found for 'TenneT 2 GW'

425 results found for 'TenneT 2 GW'
Order results by

A list of search results

  • 1 July 2022
    Business & Finance, Contracts & Tenders, Grid Connection, Industry, Technology

    Dutch-German transmission system operator (TSO) TenneT has launched a qualification system for the delivery of 2 GW High Voltage Direct Current (HVDC) offshore platforms and HVDC converter systems. The scope of this qualifications system covers the Category Converter, and/or the Category Platform, TenneT said. The Category Converter covers HVDC converter systems for offshore and onshore […]

  • 19 February 2024
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    A consortium led by Seatrium and GE Vernova will be constructing its third offshore wind project in the Netherlands for Dutch transmission system operator (TSO) TenneT, with the construction work commencing on 1 June 2024. In March 2023, Seatrium was awarded a five-year framework cooperation agreement with GE Vernova by TenneT for the supply three […]

  • 26 October 2021
    Grid Connection

    The Dutch IJmuiden Ver Wind Farm Zone, which is set to house TenneT’s next-generation offshore grid solution with a capacity of 2 GW per connection, is likely to incorporate three instead of two 2 GW grid connection systems and have 6 GW instead of 4 GW of total installed offshore wind capacity. This is according […]

  • 30 March 2023
    Contracts & Tenders, Grid Connection

    The Dutch-German transmission system operator (TSO), TenneT, has signed multiyear agreements with three consortia for the delivery of eleven 2 GW grid connections in the North Sea that will connect German and Dutch offshore wind farms to their respective grids on land. Under the eleven contracts – worth EUR 23 billion in total – Hitachi […]

  • 29 April 2024
    Authorities, Planning & Permitting

    The Netherlands’ previous goal to achieve 21 GW of offshore wind capacity by the end of 2031 has been postponed by one year, now targeting achievement by 2032. On 25 April, the office of the Ministry of Economic Affairs and Climate sent a letter to the parliament on the progress of the 2030 Offshore Wind […]

  • 3 November 2021
    Contracts & Tenders

    The Dutch Ministry of Economic Affairs and Climate Policy, through the Netherlands Enterprise Agency (RVO), has launched a tender for geophysical investigations in an extended area in the North of the IJmuiden Ver Wind Farm Zone (WFZ), where an additional 2 GW of offshore wind capacity could be accommodated on top of the 4 GW […]

  • 22 April 2021
    Authorities, Grid Connection

    The Dutch Ministry of Economic Affairs and Climate and the transmission system operator (TSO) TenneT have opened consultation on the IJmuiden Ver Gamma 2 GW offshore wind connection project, the third offshore grid in the wind farm zone along with IJmuiden Ver Alpha and Beta. Local residents, companies and other parties have until 21 May […]

  • 14 January 2025
    Grid Connection, Offshore Platforms, Technology

    TenneT has contracted Nokia to provide optical networking technology for eight new 2 GW offshore converter platforms in the Dutch North Sea that will transmit electricity generated by offshore wind farms to the Netherlands. The Dutch-German transmission system operator (TSO) will use the communication network to monitor and manage the remote and uncrewed 2 GW […]

  • 3 March 2023
    Business & Finance, Contracts & Tenders, Grid Connection

    TenneT has selected NKT and Prysmian to install five 525 kV XLPE HVDC cable connections for grid projects which will link new Dutch offshore wind farms to the national grid. TenneT’s next-generation, 2 GW grid connections in the Netherlands are scheduled to be completed between 2028 and 2030. NKT will build the cable connections for […]

  • 15 January 2025
    Business & Finance, Cables, Contracts & Tenders, Grid Connection, Project Updates, Supply Chain

    Nexans has secured the contract for the LanWin2 offshore grid connection in Germany, valued at EUR 1 billion, under the framework agreement TenneT awarded the French subsea cable supplier in May 2023. The project involves the engineering, procurement, construction, and installation (EPCI) of 250 kilometres of 525 kV high-voltage direct current, cross-linked polyethylene (HVDC XLPE) […]

  • 18 October 2023
    Contracts & Tenders, Equipment, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    Engineering company Iv-Offshore & Energy has signed a contract with Seatrium for the design of the 2 GW IJmuiden Ver Beta offshore converter platform in the North Sea. Under the contract, Iv will be responsible for the detailed engineering of the offshore converter platform for both the topside and the jacket as well as for […]

  • 4 February 2021
    Grid Connection

    Dutch transmission system operator TenneT has opened a tender procedure for a geotechnical soil investigation at the 4 GW IJmuiden Ver offshore wind site. TenneT seeks geotechnical information on two, optionally three, platform locations at IJmuiden Ver which are suitable to progress the design and installation requirements for offshore high voltage substations. The geotechnical soil […]

  • 3 February 2025
    Business & Finance, Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    Transmission system operator (TSO) TenneT has signed a realisation agreement with the consortium of pension fund ABP, pension investor APG, and wind energy developer SSE for the Dutch offshore grid connection of the 2 GW IJmuiden Ver Alpha wind farm. The realisation agreement enables the development and construction of the physical grid infrastructure required to […]

  • 23 June 2022
    Business & Finance, Contracts & Tenders, Grid Connection, Technology

    Transmission system operator TenneT is preparing a ”large-scale” offshore tender to connect 40 GW of new offshore wind capacity in Germany and the Netherlands by 2030. In the Esbjerg Declaration in May at the North Sea Energy Summit, Germany, the Netherlands, Denmark, and Belgium agreed to jointly install at least 65 GW of offshore wind […]

  • 12 September 2024
    Grid Connection, Offshore Platforms

    A consortium of GE Vernova and Seatrium has held a steel-cutting ceremony to mark the start of construction work on TenneT’s IJmuiden Ver Beta offshore converter platform, one of the first Dutch 2 GW grid connection projects. The first steel was cut at Seatrium’s Tuas Boulevard shipyard in Singapore. The high voltage direct current (HVDC) […]

  • 19 April 2021
    Contracts & Tenders, Grid Connection

    Dutch transmission system operator (TSO) TenneT has launched a new tender for geotechnical soil investigation at the IJmuiden Ver (IJV) offshore wind area, looking for the work to be carried out at three locations that will house offshore transformer stations. In February, the TSO invited bids for geotechnical soil investigation for IJmuiden Ver Alpha and […]

  • 22 August 2024
    Contracts & Tenders, Grid Connection, Offshore Platforms, Supply Chain

    TenneT has closed the tender and awarded contracts to companies that will provide HVDC engineering support to the already-selected EPCI contractors for the 2 GW bipolar HVDC converter stations that will make the new offshore grid connections in the Netherlands.  Dutch transmission system operator (TSO) signed the contracts, valued at a total of EUR 7 […]

  • 5 May 2023
    Contracts & Tenders, Grid Connection

    TenneT has awarded NKT, Nexans, and a consortium of Jan De Nul, LS Cable, and Denys with contracts to install 525 kV HVDC cable systems for ten offshore wind projects in the Netherlands and Germany. The total volume of the contracts for the production and installation of the ten cable systems amounts to approximately EUR […]

  • 10 June 2025
    Grid Connection, Offshore Platforms

    Construction has started on the BalWin delta offshore converter platform, which is scheduled to be installed in the North Sea in 2028. Fabrication of the BalWin delta platform began last week in Batam, Indonesia, marked by a festive ceremony as block production of the topside got underway. According to the German transmission system operator (TSO) […]

  • 4 July 2024
    Business development, Cables, Contracts & Tenders, Grid Connection, Innovation, Offshore Platforms, Supply Chain

    The Dutch/German offshore transmission system operator (TSO) TenneT is working on a concept for an offshore subsea transformer that could, according to the TSO, speed up the offshore grid expansion. At the end of June, TenneT launched a tender in Germany for feasibility studies into the concept. According to the information in the tender notice, […]

  • 6 December 2021
    Contracts & Tenders, Grid Connection

    TenneT has launched the tender for the 525 kV DC cable system for the Dutch IJmuiden Ver projects, which will see the transmission system operator (TSO) building at least two 2 GW offshore grid connections to link the wind farms in this wind energy zone to the national grid. The TSO, which expects to award […]

  • 26 June 2020
    Contracts & Tenders, Grid Connection

    TenneT TSO B.V. has awarded Next Geosolutions with a contract to carry out cable route surveys on three wind zones in the Dutch North Sea. The transmission system operator has also signed a backup agreement with Fugro for the work. Under the agreement, Next Geosolutions will carry out cable route surveys on the 700 MW […]

  • 24 July 2020
    Contracts & Tenders

    The Netherlands Enterprise Agency (RVO) is preparing to issue a call for tenders for geotechnical soil investigations at the IJmuiden Ver offshore wind farm zone. The tender, expected to be open on 31 August, will be divided into two lots. The first lot will entail seabed Core Penetration Testing (CPT), while the second lot will […]

  • 1 September 2020
    Contracts & Tenders

    As announced in July, the Netherlands Enterprise Agency (RVO), has now issued an invitation to tender for geotechnical soil investigations at the IJmuiden Ver Wind Farm Zone (IJVWFZ), located some 62 kilometres off the Dutch coast. The tender is divided into two lots, one to be awarded for seabed Core Penetration Testing (CPT) and the […]

  • 17 May 2023
    Contracts & Tenders, Grid Connection, Vessels

    TenneT has signed multi-year framework agreements with Allseas and Heerema Marine Contractors for the transport and installation of at least fourteen 2 GW offshore platforms. The fourteen 2 GW converter stations will be installed in the Dutch and German parts of the North Sea. The framework agreement will cover at least twenty-eight slots until 2031; […]

  • 6 July 2022
    Contracts & Tenders, Grid Connection

    Nexans has won the contract for cabling work on the BorWin6 offshore grid connection in Germany, which TenneT awarded following a tendering process. Under the contract with TenneT, awarded through a tendering process, Nexans is responsible for the production and laying of cables, including the sea, tidal flat, and land cables.  The cable laying work […]