Search results for: blade

2645 results

A list of search results

  • 14 September 2015
    Wind Farm Update

    By laying in the first power cable between the monopiles “SB 28C” and “SB 29C”, Vattenfall and Stadtwerke München (SWM) have started the inter array cabling of the Sandbank offshore wind farm, 90 km west of the coast of German island Sylt. Approximately 96 km of cables are to be installed within the wind farm. […]

  • 20 June 2018
    Wind Farm Update

    Seaway Heavy Lifting (SHL), using its vessel Oleg Strashnov, installed the 77th jacket foundation at the Beatrice site on 20 June, according to some media posts from those involved in the project, following the project’s Notice to Mariners from 18 June that reported 76 jackets being in place.

  • 6 September 2021
    Wind Farm Update

    Ørsted is set to officially open the Borssele 1 & 2 offshore wind farm today (6 September), after postponing the project’s inauguration a number of times due to COVID-19. The developer of the 752 MW offshore wind farm in the Netherlands, which has been operational since the fourth quarter of 2020, will also celebrate the […]

  • 4 July 2022
    Contracts & Tenders, Wind Farm Update

    Parkwind has awarded Semco Maritime a five-year service contract for the offshore substation at the Arcadis Ost 1 offshore wind farm in the German Baltic Sea. From 2022 to 2027, Semco Maritime will perform service assignments at the offshore platform northeast of Rügen island in Germany. The company’s scope of work will include scheduled and […]

  • 6 February 2018
    Business & Finance

    Ørsted, Siemens Gamesa and Sif Group currently hold the biggest slices of cakes in their respective fields, when looking at the total installed offshore wind capacity in Europe. 

  • 23 June 2017
    Wind Farm Update

    DONG Energy has decided to use only monopile foundations on the 174-turbine Hornsea Project One offshore wind farm.

  • 23 October 2015
    Business & Finance, Wind Farm Update

    Belgian Nobelwind offshore wind project has reached financial close, securing approximately EUR 655 million from investors and financial institutions, the project company Nobelwind SA confirmed to Offshore WIND this morning. The company, comprising Belgian offshore wind developer Parkwind NV, Japanese Sumitomo Corporation and Dutch investment fund Meewind, said the project is now ready to enter the construction phase, which is […]

  • 19 March 2018
    Business & Finance, Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    Ørsted has signed a contract with Taiwan-based Century Wind Power (CWP) for the construction of a jacket foundation transition piece mock-up.

  • 1 March 2017
    Business & Finance

    The European Investment Bank (EIB) has provided a EUR 38 million loan to Szczecin and Świnoujście Seaports Authority for investments improving the seaports’ nautical access and quay infrastructure.

  • 3 July 2020
    Contracts & Tenders, Wind Farm Update

    Offshore wind developer Parkwind has signed a contract with Steelwind for the fabrication of the monopile foundations for the Arcadis Ost 1 offshore wind farm. The contract was signed at Steelwind’s headquarters in Nordenham, Germany. This signature follows Parkwind’s recent order of the wind farm’s offshore substation at Bladt Industries. Under the contract, Steelwind will […]

  • 27 March 2017
    Vessels, Wind Farm Update

    Seaway Heavy Lifting (SHL) will begin installing piles for jacket foundations at the Beatrice offshore wind farm on 27 March. The work will be carried out by the heavy lift vessel Stanislav Yudin, recently equipped with NAMI’s purpose built 700-tonne Pile Installation Frame (PIF).

  • 8 February 2018
    Ports & Logistics, Vessels, Wind Farm Update

    SAL Heavy Lift’s crane vessel Svenja has delivered 12 monopile foundations for the Hornsea Project One wind farm to the Able Seaton Port on the River Tees.

  • 16 June 2021
    Business & Finance, Wind Farm Update

    Parkwind has reached financial close on the Arcadis Ost 1 offshore wind farm, its first project in Germany, which now officially enters construction phase. Belgian offshore wind developer said the project raised about EUR 570 million of debt from a group of nine lenders. The lenders are KBC Bank, Belfius Bank, Helaba, KfW IPEX-Bank, Coöperatieve […]

  • 1 August 2013
    Wind Farm Update

    54 of 108 monopile foundations and transition pieces have now been installed at the West of Duddon Sands offshore wind farm, a 50/50 joint venture between DONG Energy and ScottishPower Renewables. On Saturday 27th July, the West of Duddon Sands team complete installation of the 54th transition piece marking the halfway point in installation of […]

  • 9 July 2012
    Business & Finance, Grid Connection, Technology

    CG has been awarded the contract for the grid connection study and supply of main transformer 275 MVA and 2 reactors of 65 MVAr at the Northwind offshore wind farm in Belgium. The Northwind wind farm, previously named “Eldepasco”, will have an installed production capacity of 216 MW. The connection between the Offshore High Voltage […]

  • 4 March 2022
    Vessels, Wind Farm Update

    DEME is currently mobilising its jack-up vessel Neptune as well as the Blue Tern jack-up, chartered from Fred. Olsen Windcarrier, for monopile installation that is set commence at the Kaskasi offshore wind farm site in Germany. The vessels will also be joined by Sea Challenger which will install the project’s transition pieces, according to a […]

  • 11 March 2013
    Business & Finance

    Seaway Heavy Lifting (SHL) has won a new contract with Gwynt y Môr Offshore Wind Farm Limited to begin the second half of foundation installation off the North Wales coast. SHL’s crane vessel ‘Stanislav Yudin’ will go to Liverpool Bay in May this year to install the last 80 of the 160 monopile foundations and […]

  • 22 March 2012
    Grid Connection

    CG has been awarded the contract for the grid connection study and supply of main transformer 275 MVA and 2 reactors of 65 MVAr at the Northwind offshore wind farm in Belgium. The Northwind wind farm, previously named “Eldepasco”, will have an installed production capacity of 216 MW. The connection between the Offshore High Voltage […]

  • 13 November 2015

    Race Bank In July, A2SEA won a contract to provide the SEA CHALLENGER offshore installation vessel for the installation of wind turbines at DONG Energy’s Race Bank offshore wind farm from early 2017. Also, MMT has been contracted to carry out unexploded ordnance (UXO) inspections and removal MMT along the export cable routes and within […]

  • 2 June 2021
    Wind Farm Update

    CTCI Machinery Corporation (CTCI MAC) has completed the production of all 48 pin piles for the jacket foundations that will be installed on the first phase of the Changfang & Xidao offshore wind farm in Taiwan. The company, a subsidiary of Taiwanese engineering services provider CTCI, said that all the 48 pin piles were manufactured […]

  • 24 November 2011
    Jobs & Recruitment

    RENEWABLE energy jobs could help Hull ride out the economic crisis, it has been claimed. However, city council leader Steve Brady said the prospect of energy firms bringing new investment and jobs to the region was the only bright spot on an otherwise gloomy horizon. He spoke out after latest figures showed almost one in […]

  • 13 June 2014

    In just over 2 months Ballast Nedam Offshore has installed 47 out of 80 monopiles on the Butendiek Offshore Wind Farm. The installation works started at the 1st of April and on the 10th of June monopile no. 47 was installed. This demonstrates reliable approach based on one of the proven installation concepts in combination with one of […]

  • 29 August 2011
    Wind Farm Update

      MT Højgaard has awarded Jumbo Offshore the transport and installation contract for all of the 111 Transition Pieces (TP’s) for the Anholt Offshore Wind Farm (Denmark). The 400 MW wind farm is currently being developed by DONG Energy. The Anholt Wind Farm is located in the ‘Kattegat’, near Anholt Island, and will be the […]

  • 13 October 2021
    Contracts & Tenders, Vessels, Wind Farm Update

    Ørsted has contracted Jan De Nul for the transport and installation of 107 XXL monopiles and one offshore substation topside at Gode Wind 3 and Borkum Riffgrund 3 offshore wind farms in Germany. Under the final contract signed with Ørsted, Jan De Nul will deploy its new installation vessel Les Alizés for the work. Starting […]

  • 13 January 2021
    Business & Finance

    Siemens Gamesa and Siemens Energy are joining forces to develop a solution that fully integrates an electrolyzer into an offshore wind turbine as a single synchronized system to directly produce green hydrogen. Siemens Gamesa will adapt its development of SG 14-222 DD – the world’s most powerful offshore wind turbine – to integrate an electrolysis […]

  • 14 September 2015

    DONG Energy has named Germany’s EEW SPC (EEW) as the main supplier of foundations for its 660 megawatt (MW) Walney Extension offshore wind farm off the Cumbrian coast. The contract covers the supply of 87 foundations for which the monopile structures will be manufactured by EEW in Rostock. The associated transition pieces will be produced under […]