Offshore Wind
  • Fixed-Bottom
  • Floating Wind
  • Supply Chain
  • Contracts & Tenders
  • Grid Connection
  • More news
JobsNewsletter
Offshore Wind logo

Your trusted source for global offshore wind news, part of the Navingo network.

Topics
  • Fixed-Bottom
  • Floating Wind
  • Grid Connection
  • Power-to-X
  • Supply Chain
Network
  • Offshore Wind
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Featured›DEME’s New Offshore Construction Vessel to Be Built in China, Delivery in 2028
Featured

September 19, 2025 · about 1 year ago

DEME’s New Offshore Construction Vessel to Be Built in China, Delivery in 2028

DEME Group has ordered a new offshore construction vessel (OCV) that will be capable of performing trenching, burial, and cable-laying operations and is set to have a methanol-ready propulsion design for future fuel flexibility. The OCV will be constructed by PaxOcean at the Zhoushan shipyard in Chi

2 minutes read
  • LinkedIn
  • X
  • Email
DEME’s New Offshore Construction Vessel to Be Built in China, Delivery in 2028
Source: DEME Group

DEME Group has ordered a new offshore construction vessel (OCV) that will be capable of performing trenching, burial, and cable-laying operations and is set to have a methanol-ready propulsion design for future fuel flexibility.

The OCV will be constructed by PaxOcean at the Zhoushan shipyard in China, and will, once delivered in 2028, complement DEME’s existing cable installation vessels Living Stone and Viking Neptun.

Based on the Norwegian SALT 310 design, the vessel will be 123 metres long and will be equipped with a DP2 dynamic positioning system, a 150-tonne active heave-compensated offshore crane, a hangar for two work-class remotely operated vehicles (ROVs), a hybrid 1,000-kWh battery system, and a methanol-ready propulsion design for future fuel flexibility.

It will be able to accommodate up to 123 people and is configured to sport two 2,500-tonne cable carousels.

DEME said that the investment was sizable, meaning it represents a value of between EUR 50 million and EUR 150 million.

Hugo Bouvy , Managing Director Offshore Energy at DEME, said: “With more than 5,000 km of subsea cables installed across wind farms in Europe and the United States, DEME continues to support clients in delivering offshore projects efficiently and reliably. Building on this track record, the new OCV further enhances DEME’s cable installation capabilities and expands its versatile fleet of vessels and solutions.”

Of note, PaxOcean unveiled at the beginning of this year that it had signed shipbuilding contracts for two OCVs with a “renowned European shipowner” , including an option for two additional vessels.

Reach the Offshore Wind industry in one go!

Offshore Wind is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Wind on:

Filed under

FeaturedHeadlinesPress releasesRegional newsBusiness & FinanceBusiness developmentCablesGrid ConnectionInnovationOutlook & StrategyVessels

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ampelmann Completes Cargo Drone Campaign at Triton Knoll Offshore Wind Farm
  2. 2ACOUSTISCAN: Acoustic Partial Discharge Monitoring Strengthens Offshore Wind Reliability
  3. 3ABL to Support Marine Operations at Gennaker Offshore Wind Farm
  4. 4Dong Fang Offshore Takes Delivery of First Newbuild SOV, Adds New Vessel Order with Vard

Daily Offshore Wind News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free