List of the highlighted articles
Rampion Export Cable Works Heating Up
Works on the export cables which will bring ashore the energy generated by the 400MW Rampion offshor...
Fugro Lays Final Rampion Inter-Array Cable
Fugro has laid the final inter-array cable at the 400MW Rampion offshore wind farm off Sussex, UK. ...
VBMS Brings Moby Dig to Dry Land
An excavator stranded while working on the Rampion offshore wind project in Sussex has been lifted a...
Evolution of Offshore Foundations
By Dario Mulazzani, DAVI Product & Market Specialist Wind Energy & Heavy-Duty Division. Loca...
Eager.one supports the future of offshore floating installation
Offshore heavy lifting: Why use power, if you have balance? The offshore wind industry is growing si...
Hexatronic Cable Heading to Rampion
Swedish fiber optic cable infrastructure provider Hexatronic is delivering 17.5 kilometres of its do...
Wind Solution on Rampion Duty
C-bed’s flotel Wind Solution has arrived to Sussex to provide offshore accommodation for the c...
Vroon Sends Second PSV to Rampion
Vroon Offshore Service’s platform supply vessel (PSV) VOS Prelude has joined MPI Offshore̵...
Examining the economic potential of offshore wind in North Holland
Report reveals North Holland’s excellent position for support of wind projects In a boost to renewab...
Rampion OSS Topside Touches Down off Sussex
Scaldis has installed the 2000-tonne offshore substation topside on the 400MW Rampion offshore wind ...
Global Wind Service on Rampion Duty
A team of Global Wind Service UK LTD (GWS) technicians is currently working off Sussex on the instal...
Fugro Returning to Rampion Next Week
Fugro’s multi-purpose offshore vessel Fugro Symphony will return to the 400MW Rampion offshore...
Economic benefits of accelerating submarine cable repairs – interconnector case study
By Jakub Vastmans, Senior Manager Service Product Management at NKT Over the past decades, thousands...
MPI Discovery Installs First Rampion Turbine
MPI Offshore’s jack-up vessel MPI Discovery installed the first of 116 3.45MW MHI Vestas wind ...
Turbine Installation Set to Start at Rampion
MPI Offshore’s wind turbine installation vessel MPI Discovery has arrived at the 400MW Rampion...
E.ON Tackling Faulty Export Cable Bit at Rampion
A section of one of the export cables for the 400MW Rampion offshore wind farm was cut out due to a ...
Rampion Offshore Substation Jacket In Place
The offshore substation jacket for the 400MW Rampion offshore wind farm has been installed off the c...
James Fisher's Vessel to Guard Rampion During Construction
James Fisher Marine Services (JFMS), part of James Fisher and Sons plc, has been awarded a guard ves...
Locals Invited to Hear about Rampion
The Newhaven Chamber of Commerce is organising an information event in Newhaven to discuss the lates...
Final Rampion Foundation Piled into Seabed
Jack-up vessels MPI Discovery and Pacific Orca have completed the installation of 116 turbine founda...
EDS Wins Rampion Cable Termination and Testing Contract
UK-based high voltage engineering specialist, EDS Group, has been chosen to complete cable terminati...
Rampion Set For Flurry of Offshore Works
Fugro’s multi-purpose offshore vessel Saltire is expected to start burying inter-array cables ...