740 results found for 'Triton offshore wind farm'

740 results found for 'Triton offshore wind farm'
Order results by

A list of search results

  • 21 December 2011

    On December 16, 2011, Bremen Mayor and Senator of Finance, Karoline Linnert in front of 250 guests at BLG-car terminal christened OFFSHORE BHV 1 pontoon. Soon, this vessel will be transporting up to 900 tonnes of heavy foundation structures for the Global Tech I wind farm. The tripod structures will remain at the terminal until […]

  • 14 November 2014
    Operations & Maintenance

    Nuon employee Teus van Verseveld found out that a telescope works perfectly fine in inspection of wind turbines, saving the company both time and money. Operations & Maintenance manager at Nuon Teus van Verseveld is an active birdwatcher who usually keeps his telescope in the back of the car. “I found out that I could use […]

  • 10 August 2023
    Vessels, Wind Farm Update

    DEME’s jack-up installation vessel Sea Installer is on its way to the Vineyard Wind 1 offshore wind farm site, where the vessel will soon install what will be the first wind turbines offshore the US state of Massachusetts. The vessel, which first called the port of Halifax in Canada at the beginning of this month, […]

  • 3 June 2019
    Contracts & Tenders

    Ørsted has contracted Bladt Industries to produce 135 transition pieces for the Hornsea Project Two offshore wind farm in the UK. The fabrication of the transition pieces is planned to begin this year at Bladt’s site in Aalborg, Denmark, with delivery expected to take place from mid-2020 to mid-2021. “We are proud that Ørsted have trusted Bladt Industries as […]

  • 26 June 2019
    Wind Farm Update

    Ørsted has placed an order with the Rostock-based EEW Special Pipe Constructions GmbH for 30 transition pieces for the 1,386MW Hornsea Two offshore wind project in the UK. The transition pieces will be manufactured at EEW Offshore Structures Britain (EEW OSB) in Teesside, the UK. Production will start in September 2019. According to Sascha Hofmeister, Managing […]

  • 4 July 2022
    Contracts & Tenders, Grid Connection

    DNV has been contracted to undertake an independent assessment of the design of the energy island planned to be built in Belgium. The assessment will provide Elia with guidance on any improvements required to minimise risk throughout its construction and operation through a combination of workshops and continuous assurance reviews, according to DNV. “Key areas […]

  • 13 August 2012
    Grid Connection

    Research and Markets has announced “Grid Connectivity Issues Faced by the German Offshore Wind Industry” report by GlobalData. Offshore wind is one of the most important technologies to the current German energy strategy. The country plans to have ceased all nuclear energy generation by 2022, and focus is increasing on renewable energy technologies. The country […]

  • 16 February 2024
    Business & Finance, Industry

    OEG Energy Group (OEG) has completed the acquisition of Netherlands-based Marine Coordination Services (MCS), a specialist provider of marine coordination and offshore project services. MCS will join the OEG Renewables (“OEGR”) division, further expanding OEG’s marine coordination capabilities and opening new market opportunities to offer integrated service solutions in the European offshore wind sector. “We […]

  • 19 August 2013
    Wind Farm Update

    Construction of the Global Tech 1 Wind Farm commenced in September 2012. Its foundation structures are being transported to the construction site from BLG’s offshore terminal at Bremerhaven with the installation vessel INNOVATION. Meanwhile, 51 of the 60 metre high tripods weighing 900 tons each have now been installed there. Following the transport and intermediate […]

  • 5 March 2017

    GeoSea to Build Large Offshore Wind Farms with New Next-Gen Vessel As of 2019, GeoSea will use a next generation vessel – named Orion – for the construction of the large offshore wind farms, after its mother company DEME placed an order for the 216.5m DP3 installation vessel with COSCO shipyard in China. TenneT Consulting […]

  • 6 September 2013
    R&D

    Fast Market Research recommends “Monopile Foundation: Dominance in Offshore Wind Foundation Industry” from GlobalData, now available in its offering. The global offshore wind power industry has grown rapidly in recent years. Countries looking to increase their dependency on wind energy are increasingly looking to offshore wind projects due to high capacity factors and high wind […]

  • 5 February 2015

    Along with its annual report on offshore wind in Europe last year, European Wind Energy Association (EWEA) has also published an infographic that shows statistical details of the industry.  Here are some other fun facts about the European offshore wind from EWEA’s report: –  The average water depth of wind farms completed, or partially completed, in 2014 was 22.4 […]

  • 25 August 2013

    Floating Gyro-Stabilized VAWT to Be Tested in Norway (VIDEO) A model of a floating gyro stabilized Vertical Axis Wind Turbine (VAWT) for offshore and near-shore applications, which is called Gwind, will be tested in the harbor of Stavanger this autumn, according to the Norwegian Centre for Offshore Wind Energy (NORCOWE). AREVA, Windreich Sign Cooperation Contract […]

  • 4 July 2022
    Wind Farm Update

    The first wind turbine foundation at the Saint-Brieuc offshore wind farm has been installed, the developer Ailes Marines informed today, 4 July. Using Subsea 7’s Seven Borealis vessel, Van Oord installed the first jacket foundation, located in the northern part of the project site and has already started installing the second one in the same […]

  • 1 June 2022
    Business & Finance

    Belgium-headquartered Sarens and UK-based PSG Marine & Logistics Ltd have formed a joint venture (JV) to support both the bottom-fixed and floating offshore wind projects with heavy lifting, transportation, and logistics services from the Port of Cromarty Firth. “We are extremely pleased to form this joint venture with the reference player in global heavy lift […]

  • 13 November 2023
    Business & Finance, Fixed-Bottom, Project Updates, Wind Farm Update

    Octopus Energy’s generation arm has made its first offshore wind investment in Germany with the acquisition of a 5 per cent stake in the 288 MW Butendiek offshore wind farm from Ewz, the Zurich Municipal Electric Utility. Located 32 kilometres west of Sylt Island in the North Sea, the Butendiek offshore wind farm features 80 […]

  • 8 February 2021
    Business & Finance, Wind Farm Update

    Amazon has signed an agreement with Shell Energy Europe to offtake renewable power from the subsidy-free Hollandse Kust Noord offshore wind farm being constructed in the Netherlands. Starting in 2024, Amazon will offtake a total of 380 MW from the wind farm, 250 MW from Shell and 130 MW from Eneco. According to Shell, this […]

  • 5 June 2020
    R&D

    The U.S. National Offshore Wind Research and Development Consortium will award a total of USD 10.3 million (around EUR 9.1 million) to twelve projects selected in its latest solicitation for offshore wind research and development (R&D). The funding will support research in areas such as the U.S. offshore wind supply chain, offshore wind impact on […]

  • 20 February 2024
    Fixed-Bottom, Project Updates, Supply Chain, Wind Farm Update, Wind Turbines

    The first Siemens Gamesa 108-metre-long wind turbine blades have left its manufacturing factory in Hull for the Moray West offshore wind project in Scotland. Nine of the 180 blades destined for the 882 MW offshore wind farm were loaded onto the Rotra Mare transporter ship at the Siemens Gamesa blade factory in Hull, and are […]

  • 13 May 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    The first six foundations for Dominion Energy’s Coastal Virginia Offshore Wind (CVOW) project have been loaded onto DEME Group’s installation vessel, Orion. In addition, work on the second offshore substation for the 2.6 GW project has started at CS Wind Offshore’s production site in Aalborg, Denmark. The first six monopiles, which are produced by EEW […]

  • 5 August 2022
    Contracts & Tenders, Vessels

    Dutch offshore access provider Ampelmann will supply an E5000 motion compensated gangway to Norway-based Volstad Maritime to assist with cabling and commissioning operations on the Saint-Brieuc wind farm offshore France. Unveiled in 2019, the E5000 is a full motion compensated system that is capable of transferring personnel and cargo of up to approximately five tonnes. […]

  • 24 September 2020
    Wind Farm Update

    Seajacks Scylla installed the 33rd jacket foundation at the Moray East offshore wind farm site on 20 September, according to the project’s Notice of Operations from 21 September. The jack-up vessel is transporting the jacket foundations to the project site from Global Energy Group’s site in Nigg. The first jacket was installed at the beginning of […]

  • 4 July 2022
    Contracts & Tenders, Wind Farm Update

    Parkwind has awarded Semco Maritime a five-year service contract for the offshore substation at the Arcadis Ost 1 offshore wind farm in the German Baltic Sea. From 2022 to 2027, Semco Maritime will perform service assignments at the offshore platform northeast of Rügen island in Germany. The company’s scope of work will include scheduled and […]

  • 2 August 2018
    Grid Connection, Wind Farm Update

    High voltage engineering specialist, EDS HV Group, part of James Fisher and Sons plc, has completed installation, termination and testing work at the Blyth Offshore Demonstrator wind farm.

  • 16 April 2024
    Authorities, Fixed-Bottom, Planning & Permitting, Project Updates, Wind Farm Update

    Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project has received an air quality permit from the US Environmental Protection Agency (EPA) – the final federal permit required to begin offshore construction. The installation of monopiles at the project site off the coast of Virginia Beach is scheduled to begin in May. Belgian offshore […]

  • 17 April 2024
    Equipment, Fixed-Bottom, Project Updates, Supply Chain, Vessels, Wind Farm Update

    Dutch company CAPE Holland has secured a contract with DEME for foundation installation equipment that will be used at the Coastal Virginia Offshore Wind (CVOW) project site in the US. Under the contract, CAPE Holland, part of Venterra Group, has provided its CAPE VLT-640 Quad spread and a separate CAPE VLT-640 unit to the Belgian […]