Search results for: south work

2034 results

A list of search results

  • 27 June 2023
    Business & Finance, Operations & Maintenance

    Dublin-headquartered aircraft lessor LCI has started delivering helicopters that will be leased under long-term arrangements to HeliService USA and be used on offshore wind projects. These are the first dedicated offshore wind helicopters in the United States. The offshore helicopter transport provider based in Rhode Island, US, is leasing two AW169 helicopters, one of which […]

  • 17 August 2021
    Wind Farm Update

    The developers of the Star of the South wind farm offshore Australia are starting work on the Environmental Impact Statement (EIS) and the Environment Effects Statement (EES) for the up to 2.2 GW project. These are the most detailed environmental assessments a project can go through in Australia with specialists undertaking 25 technical studies to […]

  • 19 July 2023
    Environment

    Ørsted has commissioned three nearshore artificial nesting structures (ANS) designed to house Black-legged kittiwake off the East Suffolk coastline as part of plans to compensate for the potential impacts of the Hornsea 3 offshore wind farm on the species. The structures, fabricated by Suffolk-based Red7Marine and Four Tees Engineering, are located approximately one kilometre offshore, […]

  • 1 December 2017
    Business & Finance, Wind Farm Update

    Deepwater Wind is currently preparing to submit more than 20 local, state and federal applications for its South Fork offshore wind farm in early 2018 and has now opened an office in East Hampton, New York, to support the development of the project, according to U.S. media.

  • 31 May 2019
    Grid Connection

    The New York Public Service Commission (NYPSC) is seeking public comment on a proposed electric transmission line which would connect the South Fork offshore wind farm to the state’s grid. Deepwater Wind South Fork, LLC, a subsidiary of Ørsted, is seeking authorization to install an approximately 3.5 mile submarine export cable from the New York State […]

  • 19 October 2018
    Authorities, Wind Farm Update

    The Bureau of Ocean Energy Management (BOEM) will publish a Notice of Intent to prepare an Environmental Impact Statement for the Construction and Operations Plan for the South Fork Wind Project offshore Rhode Island.

  • 30 October 2018
    Authorities, Wind Farm Update

    The US Bureau of Ocean Energy Management (BOEM) will hold public meetings in early November to help inform the environmental review of Deepwater Wind’s 90MW South Fork offshore wind farm project.

  • 14 March 2017
    Wind Farm Update

    Seabed surveys at the South Fork offshore wind farm site in the state of New York will commence in late May/ early June.

  • 20 January 2022
    Authorities, Wind Farm Update

    South Fork Wind, New York’s first offshore wind farm, has received the final decision from the federal level needed to move the project toward the start of construction as the US Department of the Interior’s Bureau of Ocean Energy Management (BOEM) has now given its final approval of the project’s Construction and Operations Plan (COP). […]

  • 18 January 2022
    Grid Connection, Wind Farm Update

    Construction work on the 132 MW South Fork wind farm offshore New York is scheduled to start on or about 28 January, South Fork Wind, a joint venture between Ørsted and Eversource Energy, said. According to the developer, the project has now received necessary permits to install the export cable system onshore and in the […]

  • 30 June 2023
    Authorities, Wind Farm Update

    The US Bureau of Ocean Energy Management (BOEM) will initiate its eleventh offshore wind environmental review with Equinor and BP’s 2.4 GW Beacon Wind 1 and 2 wind farms, proposed to be built offshore Massachusetts and connected to the grid in New York and Connecticut. BOEM published a Notice of Intent (NOI) to prepare an […]

  • 23 March 2021
    Contracts & Tenders

    Korean engineering company Saman Corp. has hired Offshore Wind Consultants (OWC) to take on the owners’ engineering role at the 300 MW Sinan offshore wind project in South Korea. OWC will deliver owners’ engineering services including review of site conditions, contract support for detail engineering, EPC contract, O&M, supervision, marine warranty services and other contracts. […]

  • 13 August 2018
    Contracts & Tenders, Operations & Maintenance, Wind Farm Update

    South Korea’s Doosan Heavy Industries & Construction (DHIC) has signed a maintenance service contract with Korea Offshore Wind Power (KOWP) for the 60MW Southwest Offshore Demonstration Wind Farm.

  • 17 February 2023
    Wind Farm Update

    Offshore construction will soon continue on the South Fork offshore wind project in New York with the installation of the project’s 68-nautical mile (about 126 kilometres) submarine cable to kick off in early 2023. The work installing South Fork Wind’s submarine cable involves six stages: seabed preparation, sea-to-shore interconnection preparation, nearshore cable laying, nearshore cable […]

  • 26 May 2023
    Business & Finance

    Ørsted and Eversource Energy have signed an agreement under which Ørsted will acquire 50 per cent interest in the uncontracted offshore wind lease area in the US the two companies currently own together. Eversource is also looking at selling its 50 per cent stake in the three jointly owned contracted offshore wind projects: South Fork […]

  • 23 June 2023
    Business development, Research & Development, Vessels, Wind Farm Update

    GEOxyz has been selected by the Dutch-German transmission system operator (TSO) TenneT to carry out geophysical and geotechnical surveys for the export cable route for the Nederwiek III offshore wind farm (NW3) in the Netherlands. The Dutch Ministry of Economic Affairs and Climate and TenneT are planning an underground high-voltage connection from the Nederwiek offshore wind farm […]

  • 6 January 2021
    Authorities, Wind Farm Update

    The U.S. Bureau of Ocean Energy Management (BOEM) has published a Draft Environmental Impact Statement (EIS) for the South Fork offshore wind farm and will open a 45-day public comment period on 8 January. After the public consultation period, BOEM will address all received comments and publish a Final EIS, which is expected to be […]

  • 26 August 2021
    Contracts & Tenders, Grid Connection, Wind Farm Update

    The developers of the South Fork offshore wind farm, Ørsted and Eversource, have selected Texas-based Kiewit Offshore Services to design and build the offshore substation for the project, with the work scheduled to start in November. The offshore substation for New York’s first offshore wind farm will be the first-ever to be built in the […]

  • 10 May 2018
    Operations & Maintenance, Ports & Logistics, Wind Farm Update

    US offshore wind developer Deepwater Wind has indicated its interest in establishing a hub on the Brooklyn waterfront to support its South Fork Wind Farm and future projects off New York, subject to necessary approvals.

  • 10 July 2023
    Business & Finance

    Nordic Capital has reached an agreement to sell Denmark-based Bladt Industries to the wind turbine tower manufacturer CS Wind. During the Nordic Capital ownership, the company completed a company-wide strategic pivot to focus solely on the growing offshore wind industry, becoming a pureplay renewable energy supplier, according to the press release. “Our company has undertaken […]

  • 29 August 2013
    Technology

    With a series of scientific dives conducted by its marine biologist, 40SouthEnergy continues to work hard in order to develop its wave technology south of St Mary’s Airport in the Isles of Scilly, as the company announced on its Facebook page. The company says that it is trying to accelerate the development as much as […]

  • 21 June 2023
    Business & Finance, Fixed-Bottom, Floating Wind

    On 21 June, in the presence of the Republic of Korea’s President Yoon Suk-Yeol, Managing Partner of Copenhagen Infrastructure Partners (CIP), Jacob Baruël Poulsen, signed an Investment Notification Form with which CIP is committing to invest USD 350 million (approximately EUR 320.5 million) into offshore wind projects in Korea. The investments from CIP’s Flagship funds […]

  • 6 March 2023
    Infrastructure, Ports & Logistics

    The Connecticut Port Authority has revealed that the Northeast Bulkhead, also known as the “delivery berth”, was completed at New London’s State Pier in the US. The 40-acre New London State Pier Terminal will be used to assemble and deliver offshore wind turbines for the Ørsted and Eversource joint venture’s South Fork Wind project this […]

  • 27 June 2023
    Collaboration, Outlook & Strategy

    POSCO International has signed a Memorandum of Understanding (MoU) with Denmark-based Copenhagen Infrastructure Partners (CIP) to cooperate on offshore wind and green hydrogen business development. Under the MoU, the two companies will work together to develop offshore wind projects in Pohang, which would serve as a base for supplying renewable energy to POSCO’s Pohang Steelworks […]

  • 26 September 2018
    Vessels, Wind Farm Update

    US-based GZA GeoEnvironmental has begun a multi-million dollar offshore geotechnical engineering program for Deepwater Wind in Rhode Island Sound at the sites of the proposed South Fork Wind and Revolution Wind projects. Working from a 200-foot class lift boat mobilized earlier this month from Quonset Point, Rhode Island, a 28-person GZA-led crew is now taking and […]

  • 7 June 2021
    Authorities, Wind Farm Update

    Ørsted and Eversource have decided to reduce the number of wind turbines at the South Fork offshore wind farm from 15 to 12. The 130 MW project, which was planned to comprise up to 15 wind turbines with a capacity of between 6 MW and 12 MW, will now most likely opt for 11 MW […]