Search results for: Global Tech I

257 results

A list of search results

  • 30 March 2016
    Technology

    Bachmann Monitoring’s condition monitoring system (CMS) is covering 22 percent of German offshore wind turbines installed in 2015. The company is planning to equip further projects in 2016, said Ulrich Oertel, head of the Monitoring Technologies Development department at Bachmann. “This includes, for example, the extension of the conventional power train CMS and structure monitoring.” All 80 turbines at the Global Tech I […]

  • 1 September 2014
    Business & Finance

    The erection of 80 AREVA wind turbines was successfully completed at the Global Tech I wind farm with the last rotor star installation finalized on Friday.  The commissioning of turbines can begin when the grid connection is available. AREVA’s 5 Megawatt M5000-116 turbines were manufactured at the Group’s Bremerhaven and Stade sites, in northern Germany. […]

  • 11 February 2019
    Contracts & Tenders, Operations & Maintenance

    Bremerhaven-based INNOVEN Marine Service has won a contract to provide offshore supply vessel services to the Global Tech I and BARD Offshore 1 wind farms in the German North Sea. The contract covers the transport of containers carrying dangerous goods and general cargo from Emden to the wind farms and back, as well as substation refueling services. […]

  • 19 June 2013

    An accident occurred in Emden’s Great Sea Lock in the early evening of June 17, when a composite of two Dutch tugboats and a pontoon collided with a dolphin structure, the Waterway Police of Wilhelmshaven (Wasserschutzpolizei Wilhelmshaven) reported. The towing composite was carrying three tripod foundations for the construction of offshore wind turbines. Since it […]

  • 17 August 2012

    Dipl.-Wirt.-Ing. (FH) Willi Balz congratulates PNE WIND AG on the sale of their offshore wind park ‘Gode Wind’ to the Danish DONG Energy. The chairman of the board of Windreich AG is pleased, that with DONG Energy, the world market leader in the area of offshore wind energy with more than 20 years of offshore […]

  • 4 September 2013
    Business & Finance

    Citizens of Wolfschlugen have gotten engaged in Windreich’s Global Tech I offshore wind project. In that respect, they have formed a civil society, which owns a stake in the holding company Global Tech I GmbH. This makes it possible for private individuals to shape an efficient energy transition for the first time. After seeing the […]

  • 13 December 2021
    Operations & Maintenance, Vessels

    Rem Offshore’s newbuild Construction Service Vessel (CSV), Rem Energy, has started a charter sea trial for Siemens Gamesa in the German North Sea. The vessel is deployed at the 400 MW Global Tech I wind farm located 140 kilometres from Emden in the German Exclusive Economic Zone. Once the sea trials are completed, Siemens Gamesa […]

  • 8 March 2011

    The wind turbine manufacturer Wind-Weser Bremerhaven is building 40 wind turbine foundations for offshore wind farm Global Tech I.   [mappress]   Source: radiobremen, March 08, 2011  

  • 23 March 2010

    Keppel Verolme BV (Keppel Verolme) and consortium partner AREVA Energietechnik GmbH, a German subsidiary of French energy company AREVA, have secured a EUR 62 million (S$117.6 million) contract from Wetfeet Offshore Windenergy GmbH (Wetfeet Offshore) to build a Mobile Offshore Application Barge (MOAB) for a new offshore wind farm in the German Exclusive Economic Zone […]

  • 13 May 2021
    Operations & Maintenance, Vessels

    DOF Subsea has equipped its multipurpose vessel Skandi Constructor, currently deployed on offshore wind projects in Germany, with a SMST walk-to-work system. A contract signed between the two companies for a motion compensated gangway marks SMST’s first delivery of walk-to-work equipment to the Norwegian company. DOF is already operating the gangway on board Skandi Constructor […]

  • 20 April 2014
    Wind Farm Update

    40th AREVA Wind Turbine Installed at Global Tech I The construction of towers and nacelles in the North Sea wind farm Global Tech I is running in full gear: During the weekend the 40th AREVA Wind turbine has been installed. Siemens Bags BorWin3 Contract from TenneT Siemens has received an order from TenneT for an […]

  • 22 May 2015
    Wind Farm Update

    Operators of alpha ventus, Riffgat, Global Tech I and Trianel Borkum offshore wind farms have joined to cooperate in emergency rescue at sea. For the first time, different operators have developed a unified rescue plan for four North Sea wind farms, located 15-95 kilometers off the island of Borkum. The aim is to create a high-quality emergency care from […]

  • 3 November 2013

    Stanislav Yudin Installs 80 Gwynt y Mor Foundations in Record Time (UK)  Seaway Heavy Lifting’s vessel, Stanislav Yudin, has successfully completed a record run of foundation installation works at Gwynt y Mor Offshore Wind Farm. UK: St. Jude Storm Could Halt London Array  The world’s largest offshore wind farm, the London Array could be affected […]

  • 12 December 2013
    R&D

    In the next few days, HOCHTIEF Solutions will commission a further powerful jack-up vessel for the construction of offshore wind farms. In the company of around 300 guests from the European offshore market the ship named VIDAR will officially be commissioned in Bremerhaven on December 12. The jack-up vessel was developed especially for construction and […]

  • 7 September 2014

    DolWin Beta Becomes Resident of North Sea (Gallery) DolWin beta, the offshore HVDC platform that will connect three offshore wind farms in the German part of the North Sea, is now anchored and ballasted to the seabed, Aibel has announced on its social media pages. Greater Gabbard OWF’s Cabling Infrastructure Worries Local Fishermen The developers […]

  • 16 June 2013

    UK: Seajacks Orders World’s Largest OWF Installation Vessel Seajacks International has entered into a contract with Samsung Heavy Industries to build the world’s largest and most advanced offshore wind farm installation vessel. Belgium: Pacific Osprey to Deploy 6MW Turbine at Belwind OWF In the first half of July, the Pacific Osprey, operated by Swire Blue […]

  • 16 March 2014

    The Netherlands: New O&M System to Cut Down Offshore Wind Costs A new system for wind farm operations and maintenance is set to significantly reduce the maintenance costs. The system has been developed by the Energy Research Centre of the Netherlands (ECN) using data from energy company Essent/RWE. East Anglia Zone Could Become Center of […]

  • 10 July 2014
    Technology

    Offshore WIND’s photo of the day: Liebherr Heavy Lift Offshore Crane, type CAL 45000-1200 Litronic, is installing rotor blades at the Global Tech I offshore wind farm in the German part of the North Sea.  Liebherr’s new heavy lift offshore crane CAL 45000-1200 Litronic® started with the installation of AREVA Wind’s rotor stars at Global […]

  • 8 September 2013

    UK: SHI’s 7 MW Wind Turbine Jacket on Its Way to Installation Site (VIDEO)  Samsung Heavy Industries’ (SHI) offshore wind turbine jacket began its journey toward Energy Park Fife in Methil this weekend. First AREVA Wind Turbines on Their Way to Global Tech I Site (Germany)  The jack-up platform Thor, owned by HOCHTIEF Solutions, is […]

  • 29 September 2013

    Belgium: Alstom Hires Bold Tern Alstom has hired “Bold Tern” jack-up installation vessel, owned by Fred. Olsen Windcarrier, to complete the offshore operations at the Belwind offshore wind farm. Japanese Offshore Wind Taking Pace A lot is happening on the offshore wind power front in Japan. In June Japan unveiled its first commercial floating turbine […]

  • 23 June 2013

    Germany: Accident in Emden during Transportation of Tripods An accident occurred in Emden’s Great Sea Lock in the early evening of June 17, when a composite of two Dutch tugboats and a pontoon collided with a dolphin structure, the Waterway Police of Wilhelmshaven (Wasserschutzpolizei Wilhelmshaven) reported. German Students Develop Transport Concept for Wind Farm Maintenance […]

  • 12 August 2013

    The energy transition and offshore industry have been the focus of politicians and the public, and have also been discussed in a very controversial manner, with many falsehoods spread all over Germany. Triggered by such developments, relevant stakeholders are eager to give their own side of the story to the public. As a result, Dipl. […]

  • 5 June 2012
    Business & Finance

    The 6.5%-Bond issue 2011/2016 of Windreich AG, dealt at the Small Business Sector – the quality segment of the Stuttgart Stock Exchange is fully allocated. “We have utilized a good value performance in the last few days to issue an additional 5 million Euros,”  Mr. Willi Balz, the Chairman of the Windreich AG Board and CFO, […]

  • 12 May 2013

    Denmark: Dong Saves Three Days Per Installed Cable Each time, a cable is installed between wind turbines at an offshore wind farm, time spent offshore can be reduced by approximately three days. A new cable laying concept from DONG Energy points the way to reducing costs.  First Wind Turbine Installed at Riffgat Offshore Wind Farm […]

  • 6 November 2013

     Last month, five tripods were loaded out in the Port of Vlissingen by Verbrugge Terminals and its partner Sarens. The tripods are intended for German Global Tech I offshore wind farm. The wind farm will consist of 80 wind turbines amounting to a total capacity of 400MW. Full operation of the wind farm is expected […]

  • 20 May 2013

    Japan to See Floating Wind Turbines by End of the Year  Japan could see a floating wind and current hybrid power generation system, the world’s first, off its coast by the end of this year… Global Tech I Transformer Station Successfully Installed (Germany) Yesterday, the transformer station for the offshore wind farm Global Tech I […]