Search results for: windanker offshore wind farm

422 results

A list of search results

  • 2 October 2020
    Ports & Logistics, Wind Farm Update

    The Spanish Navantia-Windar consortium has launched the production of foundation components for the Saint-Brieuc offshore wind farm in the Brest polder, France. Navantia-Windar has presented the main achievements delivered in its construction program for 34 of the 62 foundations that will be built in France for the wind farm. The technology chosen by Ailes Marines, […]

  • 13 February 2023
    Wind Farm Update

    Windar Renovables has announced that the first transition piece has been upended for the 800 MW Vineyard Wind I offshore wind farm in the United States. First of a total of 62 transition pieces to be manufactured by Windar Renovables has been already upended in the Port of Avilés in Spain. In 2019, Windar Renovables […]

  • 3 July 2023
    Contracts & Tenders, Grid Connection, Wind Farm Update

    The PGE and Ørsted joint venture has signed contracts with Navantia-Windar and Orient Cable (NBO) for delivery of foundations and array cables for Baltica 2, which is the first stage of the Baltic Offshore Wind Farm in the Polish Baltic Sea. Navantia-Windar will be supplying monopile foundations, the largest exceeding 100 metres and weighing over […]

  • 13 March 2023
    Operations & Maintenance

    Windar Renovables has delivered the first transition pieces to Iberdrola’s 476 MW Baltic Eagle offshore wind farm in Germany. The loading of the transition pieces manufactured by the Spanish company at its facilities in Avilés began this weekend onto the general cargo vessel Happy Dragon. The ship, currently located at Port Mukran, according to the […]

  • 18 February 2021
    Business & Finance, Contracts & Tenders, Wind Farm Update

    The Navantia-Windar joint venture has received its first jacket foundation components for the Saint-Brieuc offshore wind farm manufactured in the Brest polder, France. Navantia-Windar established the manufacturing hub in the Brest polder in 2019, subcontracting multiple local companies for its first French project and the largest jacket foundation contract for the joint venture. According to […]

  • 19 June 2023
    Wind Farm Update

    The Navantia-Windar consortium has started shipping the remaining jacket foundations for the French Saint-Brieuc offshore wind farm, being built by Iberdrola through its wholly-owned subsidiary Ailes Marines in the Bay of Saint-Brieuc in Brittany. Each batch will comprise four jackets of the 38 that are still in the Navantia Seanergies Fene shipyard. All 62 foundations […]

  • 6 July 2023
    Wind Farm Update

    The 496 MW Saint-Brieuc offshore wind farm, being built by Iberdrola through its wholly-owned subsidiary Ailes Marines in the Bay of Saint-Brieuc in Brittany, has produced its first green power. The project is Iberdrola’s first in France and only the second offshore wind farm to produce power in the country, according to the press release. […]

  • 30 June 2023
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Seaway7 has signed a contract with ScottishPower Renewables, Iberdrola’s UK arm, for the transport and installation of foundations and inter-array cables for the 1.4 GW East Anglia Three offshore wind farm. The deal is worth between USD 500 million and USD 750 million, as per Subsea7’s definition of a very large contract and the classification […]

  • 26 June 2023
    Contracts & Tenders, Wind Farm Update

    Bureau Veritas has been awarded a major contract to provide integrated site services for ScottishPower Renewables’ 1.4 GW East Anglia Three offshore wind farm in the UK. Under the multi-million-pound contract, Bureau Veritas will provide quality, fabrication management, and inspection services, representing ScottishPower Renewables within a significant portion of the project supply chain. In addition, […]

  • 4 July 2023
    Contracts & Tenders, Grid Connection

    Hellenic Cables, together with Jan De Nul Group, has been awarded by TenneT the turnkey delivery of three HVAC offshore grid connection cables for the offshore wind farms to be developed in zones N-3.7 and N-3.8 in Germany. These cables will connect the wind farms to the DolWin kappa converter station, from where HVDC cables […]

  • 31 August 2021
    Contracts & Tenders, Wind Farm Update

    Iberdrola will submit a bid for the construction of a new offshore wind farm in the Baltic Sea in the ongoing offshore wind auction in Germany, the company said on 30 August. The Spain-headquartered offshore wind developer said it would file its proposal for the Windanker project on 1 September as part of a plan […]

  • 3 July 2023
    Infrastructure, Vessels

    Belgium-based DEME has announced that the vessel Green Jade, the first floating, DP3 heavy lift and installation ship constructed in Taiwan, officially joined its fleet. Green Jade joined DEME’s fleet after a naming ceremony was held at the Kaohsiung shipyard in Taiwan. The vessel is similar to Orion, which joined the company’s fleet in the […]

  • 2 October 2019
    Wind Farm Update

    Windpark Fryslân has achieved the financial close for the 382.7 MW Windpark Fryslân nearshore wind farm in the IJsselmeer, the Netherlands. Ten banks and the province of Fryslân are jointly financing Windpark Fryslân, which is being built south of the Afsluitdijk, six kilometers off the Frisian coast. The nearshore wind farm is being built by […]

  • 4 March 2021
    Ports & Logistics, Wind Farm Update

    Spain’s Windar renovables is shipping out the first batch of pin-piles manufactured for the Saint-Brieuc offshore wind project in France. Tadarsa Logistics is assisting Windar renovables in loading out the first 15 pin-piles for the turbine jacket foundations and four pin-piles for the substation jacket foundation at the port of Avilés. The vessel and the […]

  • 18 June 2020
    Contracts & Tenders, Wind Farm Update

    Spain’s Navantia-Windar consortium has received a firm order from the compatriot energy company Iberdrola for the turbine jacket foundations to be installed on the Saint-Brieuc wind farm offshore France. The contract, valued at EUR 350 million, will see Navantia-Windar manufacture and assemble 62 jacket foundations and the accompanying pin piles which will support the wind […]

  • 28 February 2018
    Contracts & Tenders, Wind Farm Update

    Senvion has contracted TÜV Rheinland to oversee the production of wind turbine blades for the Trianel Windpark Borkum II offshore wind farm.

  • 20 June 2023
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Iberdrola Deutschland and SHS – Stahl Holding Saar, an operational management holding company that performs tasks for the two major steel companies in the German state of Saarland, Dillinger and Saarstahl, have signed a 15-year power purchase agreement (PPA) for the Baltic Eagle offshore wind farm. Under the PPA, SHS will cover 200 GWh of […]

  • 29 November 2022
    Contracts & Tenders, Wind Farm Update

    Ocean Winds has signed a capacity reservation agreement with the Navantia-Windar consortium to manufacture 62 wind turbine jacket foundations to be built in Fene, La Coruña, Spain for the Dieppe le Tréport wind farm offshore France. This project, which will soon materialise in the form of a contract, is the largest one awarded to Navantia […]

  • 13 May 2016
    Business & Finance

    Offshore wind industry could potentially create 10,000 jobs in the Spanish region of Galicia in the coming years, Enrique Mallon, the Secretary General of the association of metal workers of Galicia (ASIME), said during Galician Offshore International HUB 2016 forum held in Ferrol on 12 and 13 May. “If we do things right, both the administration […]

  • 2 March 2023
    Contracts & Tenders, Wind Farm Update

    Spanish energy company Iberdrola has appointed Ramboll to deliver the foundation design for their 300 MW Windanker project in the German Baltic Sea. This will be the third foundation design Ramboll delivers for Iberdrola’s Baltic Hub. Ramboll has delivered the concept design of monopile and jacket foundations and will deliver the detailed design for a […]

  • 7 September 2020
    Wind Farm Update

    Van Oord has installed the first of the 89 monopiles at the Windpark Fryslân in the IJsselmeer Lake, the Netherlands. The remaining 88 foundations are expected to be installed by January 2021, Windpark Fryslân said. Unique Installation Approach – Sarens Soccer Pitch The 382.7 MW Windpark Fryslân is being built in the Frisian part of the IJsselmeer […]

  • 30 October 2020
    Contracts & Tenders, Grid Connection

    Visser & Smit Hanab has secured a contract by Van Oord to perform inter-array cable termination and testing work at the Windpark Fryslân nearshore wind farm in the Netherlands. The routing, termination and testing activities will commence as soon as the cable installation starts. Visser & Smit Hanab is also in charge of installing the […]

  • 20 December 2019
    Contracts & Tenders, Wind Farm Update

    Van Oord has selected Tekmar Energy’s Cable Protection System (CPS) TekLink® Mechanical Latch for the Windpark Fryslân nearshore wind farm in the Netherlands. The 382.7MW Windpark Fryslân comprises 89 Siemens Gamesa 4.3MW wind turbines to be installed in the IJsselmeer some six kilometers off the Frisian coast. Tekmar Energy is providing 167 cable protection systems […]

  • 21 November 2012
    Business & Finance

    SüdWestStrom Windpark GmbH &Co. KG is not buying the 400 MW offshore wind farm BARD Offshore 1. Delays in the completion of the wind farm and the modified risk assessment of offshore wind farms have led to a decision that the holding company SüdWestStrom Windpark GmbH &Co. KG and the project company SüdWestStrom StadtKraftWerk / […]

  • 19 June 2017

    Wood Group’s clean energy business, previously known as SgurrEnergy, supported Trianel Windpark Borkum II (TWB II) to financial close, as it had been appointed by Trianel Windkraftwerk Borkum II GmbH & Co. KG to act as lender’s technical adviser.

  • 18 May 2023
    Contracts & Tenders, Wind Farm Update

    Iberdrola has signed an agreement with Windar Renovables for the construction of 95 transition pieces for the East Anglia Three offshore wind farm in UK waters. This is the largest order of this type of foundation to date for Windar Renovables and the production will be carried out mainly at the Asturian company’s facilities located […]