Search results for: wind orca

243 results

A list of search results

  • 27 July 2012

    Swire Pacific Offshore Operations (Pte) Limited (“SPO”), the parent company of Swire Blue Ocean A/S, today took delivery of Pacific Orca, the world’s largest windfarm installation vessel (“WIV”), from Samsung Heavy Industries (“SHI”). The vessel will be deployed to provide service for the Danish utility company DONG Energy. The vessel’s particulars include a length of […]

  • 25 February 2019
    Business & Finance, Wind Farm Update

    Swire Blue Ocean’s jack-up vessel Pacific Orca is installing the 64th turbine of the 588MW Beatrice offshore wind farm at a record location. Swire Blue Ocean said the location holds two records for the company as it represents the furthest north spot and the deepest installation with approximately 55 meters in depth. Beatrice Offshore Windfarm […]

  • 5 February 2016
    Vessels

    Jack-up vessel Pacific Orca has arrived at the Port of Esbjerg to carry out the last load-out of monopiles and transition pieces for the Sandbank offshore wind farm. After all 72 foundations are in place, the installation of Siemens 4 MW wind turbines will begin. This will also be done also from the base port in Esbjerg. The 288 […]

  • 8 May 2019
    Wind Farm Update

    Swire Blue Ocean’s jack-up vessel Pacific Orca has loaded the last five Siemens Gamesa 7MW turbines destined for the Beatrice offshore wind farm. Pacific Orca has been picking up the turbines in sets of five at the Nigg port, Siemens Gamesa’s pre-assembly base, and installing them at the site 13km off the Caithness coast in the UK. According […]

  • 19 November 2020
    Technology, Vessels

    The Green Jade floating heavy lift installation vessel, owned by CSBC-DEME Wind Engineering (CDWE) and currently under construction at CSBC shipyard in Kaohsiung, will be equipped with a system for recovery of green electricity from the waste heat of its engines. German company Orcan Energy, specialising in technology for conversion of waste heat into electricity, will […]

  • 4 December 2012

    In November, Blue Water Shipping acted as agent for the world’s largest wind turbine installation vessel “Pacific Orca”, which was undergoing minor adjustments at Lindoe Industrial Park before duty calls. Blue Water Shipping was responsible for coordination with the port authorities as well as with the customs authorities, transport of the ship’s crew in connection […]

  • 9 March 2011
    Business & Finance

    Swire Blue Ocean’s parent company, Swire Pacific Offshore Operations (Pte) Ltd., is pleased to announce that it has executed its option with Samsung Heavy Industries (Samsung) in Korea to build a second Windfarm Installation Vessel. The new vessel, Pacific Osprey, will be the same specification as Pacific Orca, currently under construction at Samsung and delivering […]

  • 23 July 2019
    Operations & Maintenance, Vessels

    Swire Blue Ocean has completed the first operations under a recently signed offshore maintenance and service agreement with Siemens Gamesa. As previously reported, Siemens Gamesa and SBO signed a long-term charter agreement for the jack-up vessel Pacific Orca. The charter has been running since June 2019 and will end in February 2021. The agreement covers wind […]

  • 31 July 2014

    Today, a large installation jack up vessel, the Pacific Orca, is arrived at BOW terminal. The Pacific Orca perform their demobilization after its installation of 77 foundations for offshore wind project Borkum Riffgrund 1. Large installation tools and sea fastening will be removed from the deck. After that they will start immediately at the BOW […]

  • 21 October 2020
    Business & Finance, Vessels, Wind Farm Update

    Cadeler, formerly known as Swire Blue Ocean, is ready to send its Pacific Orca vessel in early 2021 to support foundation installation at the Hornsea Two offshore wind farm in the UK. The company has been subcontracted by DEME to deliver a vessel which will support the installation of the wind farm’s 165 monopile foundations, and Pacific […]

  • 16 October 2019
    Operations & Maintenance, R&D, Technology

    The ORCA Hub, a consortium of five UK universities, has unveiled fully autonomous drones that can inspect offshore energy infrastructure. The ORCA Hub is led by the Edinburgh Centre for Robotics, a partnership between Heriot-Watt University and the University of Edinburgh. The consortium also includes Imperial College London, the University of Oxford and the University of Liverpool. […]

  • 9 April 2018
    Vessels, Wind Farm Update

    Wind turbine installation vessel (WTIV) Pacific Orca has started installing wind turbine towers on Vattenfall’s European Offshore Wind Deployment Centre (EOWDC) in the Aberdeen Bay.

  • 4 December 2013
    Operations & Maintenance, Wind Farm Update

    The maintenance work at the Robin Rigg Offshore Wind Farm is ongoing, depending on weather conditions. This maintenance programme will involve the transfer of technicians out to selected turbines by Crew Transfer Vessels on a daily basis. The Kingfisher Information Service – Offshore Renewable & Cable Awareness project (KIS-ORCA) has warned that two new Crew […]

  • 4 February 2019
    Wind Farm Update

    Swire Blue Ocean’s jack-up vessel Pacific Orca has installed two-thirds of a total of 84 turbines at the Beatrice offshore wind farm. The vessel installed 56 of the 7MW Siemens Gamesa turbines last week and has 28 to go, according to Beatrice Offshore Windfarm Limited (BOWL). This content is available after accepting the cookies. Change […]

  • 18 February 2011

    Vattenfall’s German offshore project DanTysk has signed a contract on a vessel for the transportation and installation of 80 wind turbines. The installation vessel, Pacific Orca, is being built by Samsung Heavy Industries in South Korea to be delivered in 2012. Vattenfall and Stadtwerke München will build the DanTysk offshore wind farm as a joint […]

  • 16 August 2018
    Ports & Logistics, Vessels, Wind Farm Update

    Nine Siemens Gamesa 7MW wind turbines have so far been installed on the 588MW Beatrice offshore wind farm in the Outer Moray Firth, Scotland, Beatrice Offshore Windfarm Limited (BOWL) said.

  • 1 September 2014

    Jee Ltd, a subsea engineering and training company, will draw on its extensive subsea installation analysis experience to host a free-to-attend webinar exploring the topic on 11 September 2014. Taking place globally, the webinar – ‘Optimising Installation Analysis – a Pragmatic Approach’ – will be presented by Jee Subsea Engineer, Robert Davies, with contributions from […]

  • 13 June 2016

    Houlder today reported that it is completing assembly of a second set of 256t hydraulic Pile Restraint Arms, which will ensure foundation piles at the Rampion offshore wind site are kept vertical as they are hammered into the seabed. The pile-handling arms will be installed on Swire Blue Ocean’s installation vessel Pacific Orca, where they will provide the horizontal restraint required to […]

  • 9 August 2013
    Wind Farm Update

    SEA INSTALLER has finished installation of foundations at the West of Duddon Sands Offshore Wind Farm. She is now mobilising for installation of WTGs. The mobilisation takes place in Vlissingen, Holland. Afterwards, she will continue with the installation of 108 WTGs. The work is being carried out by two of the world’s most advanced installation vessels: Swire […]

  • 20 November 2017
    Business & Finance, Jobs & Recruitment

    Lars Blicher, CEO and Director at Swire Blue Ocean, resigned from the position on 16 November.

  • 1 October 2013
    Wind Farm Update

    The first of 108 Siemens 3.6MW turbines has been successfully installed at the West of Duddon Sands offshore wind farm, a 50/50 joint venture between DONG Energy and ScottishPower Renewables. Following the recent milestone of hitting the halfway mark on foundation installation, on Friday 27th September the West of Duddon Sands team completed installation of […]

  • 25 September 2018
    Wind Farm Update

    Swire Blue Ocean’s Pacific Orca has installed 20 out of 84 Siemens Gamesa 7MW turbines at the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.

  • 9 July 2019
    Operations & Maintenance, Vessels

    Siemens Gamesa and Swire Blue Ocean have signed a long-term agreement for offshore service operations. As part of the new agreement, Siemens Gamesa is chartering the wind farm installation vessel (WFIV) Pacific Orca from June 2019 to February 2021 ”to more efficiently service the rising of offshore projects across North Europe”. ”She can service all the types […]

  • 4 December 2013
    R&D

    Neart na Gaoithe Offshore Wind Limited will be carrying out 110 seabed Cone Penetration Tests (CPTs) at the Neart na Gaoithe offshore wind farm site, the KIS-ORCA announced on its website. The tests will commence between the 7th and 10th December 2013, and will be completed approximately within 26 days, weather permitting. The Neart na […]

  • 23 December 2013
    R&D, Technology, Wind Farm Update

    As part of the Dudgeon offshore wind farm development, Fugro GEOS deployed a wave buoy in April on behalf of Statoil for a period of 12 months. The buoy will measure waves, currents and water level and will transmit the data to shore via satellite telemetry, according to KIS-ORCA’s website. The wave buoy is a […]

  • 11 July 2018
    Ports & Logistics, Wind Farm Update

    Seaway Heavy Lifting’s vessel Oleg Strashnov has installed the 86th and final jacket foundation on the Beatrice offshore wind farm in the Outer Moray Firth, Scotland.