310 results found for 'modular offshore grid'

310 results found for 'modular offshore grid'
Order results by

A list of search results

  • 11 December 2018
    Business & Finance, Grid Connection, Wind Farm Update

    Eneco has concluded a long-term power purchase agreement (PPA) for the SeaMade offshore wind project in Belgium.

  • 24 January 2023
    Contracts & Tenders, Grid Connection

    Belgian transmission system operator Elia is in the market for two (High Voltage Direct Current) HVDC converter stations and the associated maintenance. The tender covers a detailed design, engineering, procurement, manufacturing, transport, installation, construction, testing, commissioning, and maintenance of two HVDC converter stations with a DC voltage level of +-525kV. One HVDC converter station will […]

  • 17 May 2019
    Grid Connection

    The first cable to connect Elia’s Modular Offshore Grid (MOG) plug to the Belgian grid made landfall in early May, with the second cable expected to reach the shore later this month, the Belgian offshore grid operator said. The first cable was connected to the mainland, where it was then connected to the existing onshore underground […]

  • 1 August 2019
    Grid Connection

    DEME Group’s cable laying and multipurpose vessel Living Stone has completed the installation of 85km of subsea export cable at Elia’s Modular Offshore Grid (MOG). Living Stone collected the cable at the manufacturer Hellenic Cable in Greece, transported it to the project site in Belgium and carried out cable installation, offshore jointing and four pull-ins. The cable now connects […]

  • 19 November 2019
    Contracts & Tenders, Grid Connection

    JECS Offshore Services has secured a contract to provide support to Hellenic Cables during termination works on the export cables at the SeaMade offshore wind farm in Belgium. JECS Offshore will design, supply and erect the scaffolding access platforms required for technicians to prepare and position the cables and carry out the terminations of the […]

  • 21 November 2017
    Contracts & Tenders, Grid Connection, Operations & Maintenance, Wind Farm Update

    Parkwind has issued a tender seeking companies to design, build, install and commission the offshore high voltage substation (OHVS) for its Northwester 2 wind farm in the Belgian North Sea.

  • 18 October 2019
    Wind Farm Update

    The first offshore substation transition piece and J-tube cage for the SeaMade offshore wind farm are on their way from Belgium to the Sif terminal in Rotterdam, the Netherlands, DEME Group said. The transition piece was loaded out at Smulders’ yard in Hoboken. Together with the foundation, which is already in Rotterdam, the transition piece and […]

  • 8 September 2020
    Contracts & Tenders, Grid Connection, Operations & Maintenance

    Belgian transmission system operator Elia has issued a tender seeking transport services between Ostend and offshore platforms in the North Sea. The tender is divided into two lots. Lot 1 covers provision of crew transfer services by a helicopter, including light luggage, between an onshore heliport in Ostend and offshore platforms situated some 40 kilometres […]

  • 14 May 2020
    Wind Farm Update

    The Northwester 2 offshore wind farm is fully operational, with all 23 MHI Vestas 9.5 MW turbines supplying power to the Belgian grid. Northwester 2 is the first to use the V164-9.5 MW turbines, the most powerful turbines to enter commercial operation to date, which now supply green energy via Elia’s Modular Offshore Grid (MOG). […]

  • 27 September 2019
    Grid Connection

    EDS HV Group has completed testing, jointing and termination work at Elia’s Modular Offshore Grid (MOG) in the Belgian North Sea. EDS worked to establish a connection between the MOG’s offshore submarine cables and the onshore cables at Elia’s Stevin 380kV onshore substation in Zeebrugge. Sub-contracted by cable manufacturer Hellenic Cables, EDS said it completed the preparation […]

  • 30 November 2023
    Contracts & Tenders, Supply Chain

    Energy and marine consultancy ABL has been awarded a contract to provide marine warranty survey (MWS) services for the offshore transportation and installation (T&I) operations relating to the Modular Offshore Grid 2 (MOG2) energy island project in the Belgian sector of the North Sea. ABL’s scope of work includes the review of all procedural documentation, vessel inspections to assess the suitability […]

  • 17 November 2017
    Contracts & Tenders, Grid Connection, Wind Farm Update

    Belgian offshore wind developer Otary has issued a tender for engineering, procurement, construction, and installation (EPCI) of high voltage substations on the Seastar and the Mermaid offshore wind farms.

  • 14 April 2020
    Wind Farm Update

    DEME’s cable installation vessel Living Stone has started the inter-array cabling work at the SeaMade offshore wind farm.

  • 17 December 2018
    Contracts & Tenders, Ports & Logistics, Wind Farm Update

    On 14 December, Siemens Gamesa and REBO (Renewable Energy Base Oostende) signed a contract for Belgian SeaMade offshore wind farm, which will feature 58 Siemens Gamesa offshore wind turbines. 

  • 28 May 2024
    Cables, Grid Connection, Offshore Platforms, Operations & Maintenance, Project Updates, Wind Farm Update

    The repairs on the cable linking the 309 MW Rentel offshore wind farm to mainland Belgium have been completed about four months after it failed. The fault was located just below the Rentel transformer platform, said the Belgian transmission system operator (TSO) Elia. A new section of the cable, approximately 400 metres long, was attached to […]

  • 11 May 2021
    Environment, Technology, Vessels

    DEME’s dual-fuel cable laying vessel Living Stone has completed her liquefied natural gas (LNG) sea trials after being bunkered with LNG for the first time. The ship-to-ship bunkering was conducted in Vlissingen, the Netherlands, by Titan LNG’s FlexFueler, DEME said. Living Stone completed her sea trials back in 2018. The vessel’s first assignment was on […]

  • 8 March 2018
    Business & Finance, Contracts & Tenders, Wind Farm Update

    Siemens Gamesa Renewable Energy has been chosen as the preferred wind turbine supplier for the Seastar and the Mermaid offshore wind projects in the Belgian North Sea.

  • 24 November 2017
    Business & Finance, Contracts & Tenders, Grid Connection, Ports & Logistics, Wind Farm Update

    Belgian offshore wind developer Parkwind is looking for a provider of an export cable for the 228MW Northwester 2 wind farm in the Belgian North Sea.

  • 30 June 2017
    Contracts & Tenders, Grid Connection

    A detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia will soon be open for construction tendering, Ramboll informed. 

  • 3 December 2018
    Business & Finance, Wind Farm Update

    The 487MW SeaMade offshore wind farm in the Belgian North Sea has reached financial close.

  • 1 June 2020
    Grid Connection, Wind Farm Update

    The 252 MW Seastar offshore wind farm in Belgium has been connected to Elia’s Modular Offshore Grid (MOG). Seastar is part of the 487 MW SeaMade project which comprises 58 Siemens Gamesa 8.4 MW turbines. The connection of the wind farm marks the completion of the MOG located 40km off Belgium’s coast. The switching platform […]

  • 30 November 2018
    Vessels

    DEME Group’s new cable laying and multipurpose vessel Living Stone has started her first offshore wind assignment on the Hornsea Project One wind farm off the North Sea coast of the UK.

  • 20 July 2018
    Authorities, Business & Finance, Wind Farm Update

    Developers of the Mermaid and the Seastar wind farms in the Belgian North Sea have merged the two projects into one – the 487.2MW Seamade.

  • 16 March 2018
    Business & Finance, Contracts & Tenders, Grid Connection

    Belgian transmission system operator Elia is on track to complete the Modular Offshore Grid by September 2019 after awarding all the main contracts for the project.

  • 16 April 2018
    Contracts & Tenders, Grid Connection

    The Paris office of LOC Renewables, a part of LOC Group has been contracted by the Belgian transmission system operator Elia to provide Marine Warranty Survey (MWS) services for the Modular Offshore Grid (MOG) project.

  • 18 March 2020
    Grid Connection, Wind Farm Update

    The second SeaMade offshore substation topside has been installed in the Seastar concession area in the Belgian North Sea. The wind farm’s first substation was installed in the Mermaid concession area at the beginning of March. Each with a weight of 1,200 tonnes, the substations transform the wind energy that is produced to 225kV, which in […]