Search results for: changhua

449 results

A list of search results

  • 14 July 2017
    Grid Connection, Technology, Wind Farm Update

    Hengtong Electricity Power Industry Group – Jiangsu Hengtong High Voltage Submarine Cable Co. has released what the company said is the world’s longest single no joint 220kV submarine cable, and delivered the first batch of the 220kV submarine cable for the Longyuan Dafeng offshore wind farm.

  • 22 July 2020
    Ports & Logistics, Wind Farm Update

    The first batch of pin piles for the Formosa 2 jacket foundations have been offloaded at the Port of Taichung and are now waiting for installation, which is about to start soon.  Each of the pin piles – produced by EEW Korea, EEW KHPC and EEW Malaysia – is up to 78.9 metres long, has […]

  • 10 July 2013

    On July 3-5, the 2013 Clean Energy Expo China (CEEC) was staged in the National Convention Center in Beijing. As a representative of the new energy industry, China Longyuan Power was invited to participate in the great event and drew lots of professional visitors, thus becoming a highlight of the whole expo. During the opening […]

  • 12 December 2012
    Authorities

    From December 5th to 6th, Qiao Baoping, secretary of the Party Leadership Group and deputy president of China Guodian Corporation came to make an investigation in Jiangsu Rudong Offshore Wind Farm. Mr. Qiao highly recognized the development of Longyuan’s offshore wind power as well as put forward his sincere hope. Xie Changjun, president and vice […]

  • 22 November 2011

    In the next five years, China’s investment in offshore wind is expected to exceed 25 billion RMB. This figure is set to increase along the years with the installed capacity of offshore wind will reach 10 million KWs in 2015 and 30 million KWs in 2020. Noppen hosted the 2nd Offshore Wind Power Technology and […]

  • 30 May 2017

    Van Oord Our leading position in offshore wind was in 2019 displayed in the projects Norther, Deutsche Bucht and the Borssele sites III & IV and V. For the Norther project, Van Oord’s offshore installation vessel Aeolus installed all foundations and turbines. Our cable-installation vessel Nexus installed all inter array cables and the export cable. […]