440 results found for 'Haliade-X'

440 results found for 'Haliade-X'
Order results by

A list of search results

  • 19 July 2023
    Authorities, Business development, Wind Farm Update

    Ørsted has filed a complaint against Cape May County with the Superior Court of New Jersey as the developer has not yet received a permit required for investigation works at a section of a county road. The company says this is creating “a cascading and adverse effect” on the recently approved 1.1 GW Ocean Wind […]

  • 3 May 2018
    Business & Finance, Wind Farm Update

    The industry has been waiting for Vattenfall to give out more information on its Hollandse Kust Zuid 1 & 2 zero-subsidy bid after the company won the Dutch tender in March, especially since Ørsted – world’s leading offshore wind developer and one of the first to have unsubsidised projects in the pipeline – decided to pass on bidding to build the offshore wind farm. 

  • 2 December 2021
    Business & Finance, Wind Farm Update

    SSE Renewables and Equinor have reached financial close on Dogger Bank Wind Farm C, the third phase of what will be the world’s largest offshore wind farm when complete in March 2026. SSE Renewables and Equinor are already constructing the first two phases of the 3.6 GW Dogger Bank Wind Farm with Eni, a joint […]

  • 2 April 2019

    Executive summary The development of offshore wind represents an interesting technology opportunity for the US. On one hand, offshore wind is a European invention, and early technologies will have to be almost exclusively imported from Europe. On the other, though, the rapid pace of technology development in offshore wind offers significant potential for the US […]

  • 24 November 2021
    Business & Finance, Wind Farm Update

    15-year offtake Power Purchase Agreements (PPAs) have been signed for the third phase of the 3.6 GW Dogger Bank, the world’s largest offshore wind farm, SSE Renewables and Equinor said. Dogger Bank Wind Farm will be constructed over 130 kilometres out to sea off the north-east coast of England and is expected to be fully […]

  • 7 December 2022
    Industry, Technology

    This is a guest article by Daniel Gerber, Senior Vice President, Global Product Group Manager Wind, System Drives, ABB. The critical role of wind in the world’s future energy needs is clear: the Ocean Renewable Energy Coalition states that 1,400 gigawatt (GW) of offshore wind power will sustain one tenth of global electricity demand by […]

  • 2 September 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    Vattenfall has chosen to put the 640 MW Kriegers Flak offshore wind farm on hold until further notice because the investment conditions in Sweden are not feasible at this time, according to the developer. Vattenfall said that the investment prerequisites for offshore wind in Sweden are currently not viable, and the company has therefore decided […]

  • 2 February 2021

    By Dario Mulazzani, DAVI Product & Market Specialist Wind Energy & Heavy-Duty Division. Located in such a dynamic and extremely powerful element as the sea, foundations represent one of the main elements of any offshore wind farm, accounting for over one-fourth of the total equipment cost. As they must support the wind turbines, absorbing all […]

  • 10 September 2018
    Operations & Maintenance, Vessels, Wind Farm Update

    Norwegian ship designer and shipbuilder Ulstein has cut the first steel for a Service Operations Vessel (SOV) ordered by Bernhard Schulte. The SOV yard number 315 is of the SX195 design from Ulstein, and is destined to operate for GE Renewable Energy on the Merkur offshore wind farm in the German North Sea. The vessel […]

  • 19 August 2021
    Grid Connection, Wind Farm Update

    DEME has installed the first offshore substation (OSS) in France at the Saint-Nazaire wind farm off the Guérande peninsula. Weighing 2,100 tons, the OSS topside was installed at the site on August 18. The substation’s jacket foundation was installed earlier this week. The electrical substation was constructed by a consortium including Atlantique Offshore Energy, the […]

  • 3 November 2017
    R&D, Technology

    The floating island concept, revealed earlier this year, will now be further studied and developed through a Horizon 2020-funded project Space@Sea that started on 1 November and will run for three years.

  • 31 July 2018
    Contracts & Tenders, Vessels

    GE Renewable Energy has contracted Bernhard Schulte Offshore to provide a new-build service operation vessel (SOV) for the 396MW Merkur offshore wind farm.

  • 23 August 2024
    Business development, Industry, R&D, Research & Development, Technology

    Researchers at the US Department of Energy’s National Renewable Energy Laboratory (NREL) have found a practical path for manufacturing bio-derivable wind turbine blades that can be recycled and reused, potentially ending the practice of landfilling old blades. The paper “Manufacture and testing of biomass-derivable thermosets for wind blade recycling” involved work from investigators at five […]

  • 9 October 2013
    R&D, Technology

    The OWI-Lab climate chamber is a realization of the ‘Offshore Wind Infrastructure Application Lab’ (OWI-Lab). This lab is a R&D initiative which aims to initiate and support innovation projects concerning offshore wind energy. The project’s purpose is to increase the reliability and efficiency of offshore wind farms by investing in open testing and monitoring equipment […]

  • 11 December 2023
    Fixed-Bottom, Floating Wind, Planning & Permitting, R&D, Research & Development

    As more countries climb the offshore wind map and, at the same time, the industry is facing uncertainties, energy yield assessment needs to be validated as widely as possible across diverse geographies, rather than assume the efficacy of a one-size-fits-all approach, according to K2 Management (K2M). The project advisory and engineering consultancy has published ‘Offshore […]

  • 11 February 2016
    Business & Finance, Grid Connection

    UK-based health-and-safety specialist Steel River Consultants (SRC) has been selected to act as hazard identification (HAZID) facilitator and provide CDM support and health and safety advisory services to cable supplier Prysmian on a project to construct an electricity link between the UK and Norway. The North Sea Link (NSL) project, a project owned 50 per cent each by […]

  • 13 October 2016
    R&D, Technology, Training & Education, Wind Farm Update

    Royal Boskalis Westminster has, on behalf Aberdeen Offshore Windfarm Limited (AOWFL), completed the first of two trial installations of suction buckets in Aberdeen Bay at the proposed location of the Aberdeen offshore wind farm, also known as European Offshore Wind Deployment Centre (EOWDC). The installation of the smaller suction bucket at the site proved successful, Gunnar Groebler, Vattenfall’s Head […]

  • 24 June 2024
    Business & Finance, Business development, Collaboration, Contracts & Tenders, Fixed-Bottom, Outlook & Strategy, Supply Chain

    OX2 and Varberg Energi have agreed in principle for Varberg Energi to procure renewable electricity from the Galene offshore wind farm located near Varberg, Sweden, as well as from OX2’s solar project in the vicinity. The long-term goal of the agreement is for the companies to enter into a Power Purchase Agreement (PPA) for the […]

  • 23 July 2024
    Business development, R&D, Research & Development, Technology

    Norway’s Wind Catching Systems (WCS) has received Approval in Principle (AiP) from DNV for its 40 MW Windcatcher design, which the company says is an important milestone on the route to commercial demonstration of its Windcatcher technology. The objective of an AiP is to perform a third-party technical evaluation of a design to assess whether […]

  • 17 June 2024
    Fixed-Bottom, Vessels

    China-based Tier 1 supplier to the offshore wind industry, ZTT, will put its flagship monopile installation vessel Zhongtian 39, launched in October 2023, through an upgrade to prepare the vessel “to take on its next mission with unmatched capabilities”. The upgrade will include the integration of a DP2 dynamic positioning system into the vessel which […]

  • 17 May 2024
    Business development, Floating Wind, Project Updates, Research & Development, Wind Farm Update

    Copenhagen Energy has finalized the wind measurement strategy for its Northern Luzon, an offshore wind project that the company is developing together with PetroGreen Energy Corporation (PGEC) in the Philippines. The outcome of the wind measurement strategy, which was developed in close collaboration with DNV, involves two key results: firstly, validating the initial estimates for […]

  • 19 December 2016
    Contracts & Tenders, Grid Connection

    Energinet.dk has invited tenders for burial and protection of 150kV subsea cables at Kriegers Flak Combined Grid Solution (CGS). The works include burial and protection of approximately 2 x 24km of submarine cable route, which is to be divided into trenching and jetting work for the Krieger’s Flak CGS connection. The contract will also cover, inter alia, boulder […]

  • 10 January 2024
    Business & Finance, Business development, Contracts & Tenders, Grid Connection, Infrastructure, Project Updates, Supply Chain, Wind Farm Update

    OX2 and its partner Ingka Investments have signed a cooperation agreement with the Swedish electric power distribution company, Ellevio, and submitted applications for connection of the Galene offshore wind farm in Sweden. The 400 MW Galene, the northern part of the 1.7 GW Galatea-Galene project, will be built about 21 kilometres west of Varberg and […]

  • 31 January 2013

    Two approximately 200 ton test weights were unloaded by heavy lift crane barge Conquest MB1, from the DP feeder vessel Abis Dublin. The test lifts were successfully performed in weather conditions with waves of 0.5 to 1.5 meter, waveperiods of 2 to 9 seconds and windspeeds of 23 to 29 knots (12 to 15 m/s. […]

  • 27 May 2024
    Floating Wind, R&D

    Stiesdal has revealed that its TetraSpar Demonstrator, located in Norway, has reached a capacity factor of 63 per cent. Since its commissioning in late 2021, the TetraSpar Demonstrator has been operational at METCentre in Norway, delivering green energy, gathering data, validating numerical models, supporting research and development projects, and serving as a living laboratory for […]

  • 14 March 2024
    Fixed-Bottom, Floating Wind, Planning & Permitting, R&D, Research & Development

    In its annual results for 2023, RWE reported on last year’s financial performance and many of its offshore wind developments, but also on research projects related to the wake effect at offshore wind farms. Last year, RWE, together with various project partners, completed two wake-effect studies and embarked on a new research project in the […]