157 results found for 'Orion'

157 results found for 'Orion'
Order results by

A list of search results

  • 14 March 2025
    Fixed-Bottom, Grid Connection, Offshore Platforms, Project Updates, Wind Farm Update

    The first of three offshore substations has been installed at the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project, located 43 kilometres off the coast of Virginia Beach, the US. The 3,907-metric tonne lift marks the completion of the installation of the first topside onto the jacket, which was previously installed by DEME. According to […]

  • 31 January 2025
    Business & Finance, Contracts & Tenders, Equipment, Foundations, Manufacturing, Supply Chain

    Vattenfall and BASF have signed contracts with EEW Special Pipe Constructions (EEW SPC) and CS Wind Offshore for component supply and with DEME and Jan De Nul for installation services for the Nordlicht 1 and Nordlicht 2 offshore wind farms in Germany. Germany’s EEW SPC will manufacture 112 monopile foundations, processing around 141,000 tonnes of […]

  • 1 January 2025
    Business development, Equipment, Fixed-Bottom, Floating Wind, Operations & Maintenance, Project Updates, Supply Chain, Technology, Vessels, Wind Farm Update, Wind Turbines

    New wind turbine models, vessels and equipment, and project updates were the most read topics on offshoreWIND.biz in 2024. In this overview, we are bringing the ten most popular news in 2024. In January 2024, Siemens Gamesa received a EUR 30 million grant from the EU for a project called Highly Innovative Prototype of the […]

  • 28 October 2024
    Fixed-Bottom, Foundations, Project Updates, Supply Chain, Wind Farm Update

    The DP3 installation vessel Orion, owned and operated by the Belgian offshore construction specialist DEME, is scheduled to begin installing the remaining monopile foundations at the Vineyard Wind 1 site in the US on or around 28 October, as disclosed in the project’s recent offshore wind mariner update. Prior to installation, the POLARIS and HOS RUGER […]

  • 4 November 2024
    Fixed-Bottom, Project Updates, Wind Farm Update

    Dominion Energy has revealed that 78 monopile foundations and four pin piles for one offshore substation were installed at the 2.6 GW Coastal Virginia Offshore Wind (CVOW) project in the US during the first installation season. Dominion Energy said that it achieved its initial goal of installing at least 70 monopiles into the seafloor 27 […]

  • 10 October 2024
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    Seaway7 has finished the full engineering, procurement, installation, and commissioning (EPIC) work for the cables at the 882 MW Moray West offshore wind farm in Scotland. Seaway7 has installed 118 kilometres of 66 kV inter-array cables, linking the wind farm’s 60 turbines to two offshore substations, along with an additional 15 kilometres of 66 kV […]

  • 12 September 2024
    Cables, Fixed-Bottom, Grid Connection, Project Updates, Wind Farm Update

    DEME Group has laid the first export cable for Dominion Energy’s 2.6 GW Coastal Virginia Offshore Wind (CVOW) project, while also reaching a milestone by installing the 70th monopile foundation at the site off Virginia Beach in the US. As previously reported, Dominion Energy selected the consortium of DEME Group and Prysmian as the Balance of Plant […]

  • 5 October 2015
    Vessels

    The name giving ceremony of the offshore support vessel Acta Orion will take place on October 22th, when Mrs Didi te Gussinklo Ohmann will name the vessel. The vessel is named after one of the most recognizable constellations in the night sky. Govert Jan van Oord suggested Acta Orion’s name, as Orion is the adjacent constellation […]

  • 2 May 2020
    Vessels

    A heavy-lift crane installed on the offshore installation vessel Orion has collapsed while undergoing load tests at the Liebherr construction yard in Rostock, Germany. The Orion is under construction and owned by COSCO (QIDONG) OFFSHORE CO., LTD. COSCO is expected to deliver the DP3 vessel to DEME NV in the second half of May. Several […]

  • 28 March 2017
    Vessels

    C-Job Naval Architects will provide the Basic Design package for the new wind farm installation vessel ordered by DEME from COSCO (QiDong) Offshore in China.

  • 30 September 2014

    The Orion Energy Centre in Inverness will be the focal point as industry experts look to develop new mooring and anchoring systems which will lead to significant cost savings in the renewable energy sector. The project which is led by Tension Technology International Ltd is being managed out of the Orion Energy Centre in Inverness. […]

  • 23 October 2015
    Vessels

    The new build construction support vessel Acta Orion, owned by Acta Marine, was christened at the naming ceremony held on 22 October at the port of Harlingen, the Netherlands. Didi te Gussinklo Ohmann, Van Oord’s Gemini project director, performed the ceremony. Acta Marine said it is expanding its fleet with this purpose build “Walk to […]

  • 23 January 2020
    Vessels

    DEME Group’s DP3 offshore installation vessel Orion has undergone the first liquid natural gas (LNG) bunkering. The world’s largest LNG bunker vessel Kairos, operated by Nauticor, supplied Orion with LNG at the Port of Rostock in Germany. According to DEME, this marks only the second ship-to-ship LNG bunkering operation to take place in Germany and […]

  • 21 January 2016
    Operations & Maintenance, Vessels, Wind Farm Update

    The Acta Orion, the latest addition to Acta Marine’s fleet of Wind Farm Support Vessels (WFSVs), has started its work on the Gemini wind farm project, located in the Dutch part of the North Sea. The main role of the Acta Orion is to provide support during the construction phase of the offshore wind farm. Currently, the Acta Orion is actively […]

  • 1 March 2017
    Vessels

    As of 2019, GeoSea will use a next generation vessel – named Orion – for the construction of the large offshore wind farms, after its mother company DEME placed an order for the 216.5m DP3 installation vessel with COSCO shipyard in China.

  • 15 October 2019
    Vessels

    DEME Group’s DP3 offshore installation vessel Orion is on the way to Europe for the final construction phase before heading to its first offshore wind project. According to DEME, Orion will arrive in Rostock, Germany, in a few weeks, where it will be equipped with a Liebherr crane that has a lifting capacity of 5,000t. The […]

  • 21 November 2018
    Vessels

    DEME Group’s 216.5-metre DP3 offshore installation vessel Orion was launched at the COSCO Qidong shipyard in China on Wednesday, 21 November 21.

  • 15 April 2024
    Equipment, Fixed-Bottom, Foundations, Project Updates, Supply Chain, Vessels, Wind Farm Update

    Belgian offshore construction company DEME, using its vessel Orion, has completed the installation of monopiles at the Moray West offshore wind farm site in Scotland.  Monopile installation at Moray West started in October 2023, with Boskalis’s vessel Bokalift 2 deployed for the work and Orion taking over in February. DEME’s Orion installed 29 monopiles for Ocean […]

  • 4 May 2022
    Vessels

    Belgium-headquartered DEME has revealed that the “revolutionary” offshore installation vessel Orion officially joined its fleet. The vessel arrived last month at DEME offshore base near Vlissingen in the Netherlands after sailing out of Bremerhaven, Germany. Orion is equipped with Liebherr’s Heavy Lift Crane 295000 which has a maximum capacity of 5,000 tonnes and a maximum […]

  • 16 January 2017

    Orion Group is looking to recruit over 40 welders and platers in the Central Belt of Scotland, as well as across the country, after the job opportunities arose from offshore wind projects.

  • 5 May 2020
    Business & Finance, Vessels

    DEME is currently looking for a replacement vessel for the installation of Moray East jacket foundations, following the crane accident onboard the installation vessel Orion. The company is considering both the vessels in its own fleet and externally to carry out the installation of Moray East jackets, first eight of which have now arrived at […]

  • 15 July 2019
    Vessels

    DEME Group’s DP3 offshore installation vessel Orion has left the COSCO Qidong shipyard in China to start the first series of sea trials. During the sea trials the vessel’s performance will be measured and her dual fuel engines will be tested to their maximum power, DEME said. The 216.5-metre Orion will have the capacity to accommodate a […]

  • 31 October 2018
    Vessels

    A 2,000-tonne deckhouse has been lifted and installed on DEME Group’s DP3 offshore installation vessel Orion. The vessel is currently under construction at a COSCO shipyard in China. The keel laying ceremony was held in March. The Orion will come equipped with a 5,000 tonne Liebherr HLC 295000 crane with a lifting height of up to 180 metres and […]

  • 7 May 2019
    Vessels

    DEME Group’s new DP3 offshore installation vessel Orion has been outfitted with a helideck. Orion was launched at the COSCO Qidong shipyard in China in November last year, while the 216.5m long vessel is scheduled for delivery by the end of 2019. The vessel will be deployed for the construction of the largest offshore wind farms, servicing […]

  • 11 November 2020
    Ports & Logistics, Vessels

    The recovery and repair of the crane that collapsed on board the installation vessel Orion during lifting trials in May are progressing at Liebherr facilities in Rostock, where the crane’s auxiliary jib and the jib head have now been transferred. The company started working on getting the crane back into service in September, when the […]

  • 14 February 2017
    Operations & Maintenance, Technology, Vessels

    Olympic Shipping has chosen Kongsberg Maritime’s new K-Walk integrated vessel gangway solution for installation aboard the multipurpose offshore vessel (MPSV), Olympic Orion to provide transfer of personnel and materials between the vessel and offshore wind turbines.