Top Five Offshore Wind Premium Articles on Offshore Energy in 2021

Throughout the last year, some of our Premium articles published on Offshore Energy sparked significant interest. Here, we are bringing the top five offshore wind Premium articles on Offshore Energy in 2021:

Ørsted/Illustration
  • A new method to install offshore wind turbines is said to cut installation time by 89 per cent, minimise noise pollution and vibrations, and significantly lower the installation costs:
  • A Denmark-based developer decided to cancel an offshore wind project after not managing to find a turbine model that would fit the project’s original design parameters:
  • German offshore wind operator had issued a contract notice for repair works on transition pieces across a wind farm in the German North Sea:
  • A major construction milestone was reached at what is soon to be the largest operating offshore wind farm:
  • Ørsted has proposed to build a large-scale offshore wind project in Vietnam which would have an installed capacity well beyond the offshore wind farms currently under construction or in development, and would require an investment of over EUR 10 billion:

If you want to check out the free trial and subscription options on our sister site Offshore Energy, visit the subscription page: