2120 results found for 'voltaire'

2120 results found for 'voltaire'
Order results by

A list of search results

  • 19 November 2018
    Contracts & Tenders, Grid Connection, Wind Farm Update

    French cable maker Nexans has won a contract to provide a subsea export cable system for the nearshore section of Ørsted’s 1.4GW Hornsea Project Two offshore wind farm in the UK. The contract is worth over EUR 150 million and will see Nexans supplying 200 kilometres of the 245 kV high voltage alternating current (HVAC) subsea export […]

  • 15 January 2018
    Business & Finance, Contracts & Tenders, Grid Connection, Wind Farm Update

    High voltage engineering specialist, EDS HV Group (EDS), part of James Fisher and Sons plc, has been awarded a contract to complete cable termination and testing work at the Hohe See offshore wind farm by cable manufacturer Zhongtian Technology Submarine Cable (ZTT).

  • 17 February 2017
    Business & Finance, Wind Farm Update

    Siemens Wind Power will, for the first time, provide complete offshore wind power plant solutions including foundations, after EnBW placed an order for its 497MW Hohe See project, for which Siemens is partnering with GeoSea, part of the DEME Group.

  • 20 January 2017
    Contracts & Tenders, Grid Connection, Technology

    Elia Asset N.V., part of the Elia Group, has invited tenders for the installation of the Offshore SwitchYard (OSY) Platform for the Modular Offshore Grid (MOG) project in the Belgian North Sea. The contract includes, but is not limited to, installation, engineering, providing cargo barge, transport to the offshore location and demobilisation of the installation […]

  • 12 May 2017
    Contracts & Tenders, Grid Connection, Wind Farm Update

    TenneT has launched a qualification process for candidates interested in tendering for the delivery of offshore platforms that will connect wind farms at Hollandse Kust Zuid and Hollandse Kust Noord offshore areas to the Dutch grid on the mainland.

  • 18 July 2017
    Wind Farm Update

    Van Oord has awarded Seaproof Solutions with a contract for the supply of cable protection systems for the Norther offshore wind farm in Belgium.

  • 16 February 2015
    Grid Connection

    After buying the Thanet offshore transmission infrastructure in December last year, Balfour Beatty has announced the disposal of an 80% interest in the project for £40 million. Thanet OFTO is the high-voltage electricity transmission system connecting the 300MW Thanet Wind Farm, off the coast of Kent, to the onshore transmission grid. Assets include one offshore […]

  • 21 September 2023
    Contracts & Tenders, Fixed-Bottom, Operations & Maintenance, Project Updates, Supply Chain, Wind Farm Update

    Semco Maritime has partnered with the Danish service provider, KK Wind Solutions, on a new offshore wind service contract for the High voltage (HV) Services at Ørsted’s Borkum Riffgrund 1 & 2 and Gode Wind 1 & 2 wind farms in the German North Sea. Both Semco Maritime and KK Wind Solutions specialize in delivering […]

  • 22 October 2012
    Business & Finance, Operations & Maintenance

    Mercon and Liandon announce that Imtech has joined their MLK Projects consortium. MLK Projects was founded by Liandon and Mercon earlier this year to market a new innovation in offshore substations named COSS for Compact Offshore Substation. As associated engineering company, KCI was heavily involved in the design. Victor Krijt, Business Development Manager at Liandon […]

  • 18 September 2016

    Vattenfall to Build Two Nearshore Wind Farms in Denmark Vattenfall has won the Danish nearshore wind tender after submitting the final bid for Vesterhav Syd and Vesterhav Nord sites on 1 September and offering the lowest bid of 0,475 kr/kWh. Borssele Story Not Over for Shell? Royal Dutch Shell is considering bidding at the upcoming […]

  • 10 July 2018
    Vessels, Wind Farm Update

    The walk-to-work vessel Stril Server, together with the crew transfer vessel Marieco Mariah, is currently working on cable commissioning works on wind turbine foundations at the Beatrice project site, in preparation for the installation of wind turbines.

  • 29 March 2012
    Grid Connection

    Siem Offshore Contractors GmbH (“SOC”), a wholly owned subsidiary of Siem Offshore Inc., announced today that SOC has been awarded the contract for the installation of the inner array grid cables as well as associated services for the Amrumbank West Offshore Wind Farm (“OWF”) project by Amrumbank West GmbH (“AWG”), a subsidiary of E.ON Climate […]

  • 10 March 2021
    Technology, Wind Farm Update

    Siemens Energy will install 22 units of distribution transformers at Yuhuan Offshore Wind Power Project Phase 1, China’s first commercial 66 kilovolts (kV) offshore wind farm. The fluid immersed transformers of type FITformer WIND will support China Huadian Corporation (CHD) to optimize energy supply in the Yangtze River Delta region. The first phase of the […]

  • 11 February 2025
    Business & Finance, Contracts & Tenders, Foundations, Grid Connection, Manufacturing, Offshore Platforms, Supply Chain

    Aker Solutions has signed a contract with Spain’s Dragados Offshore to deliver the steel substructure for the 2 GW BalWin1 converter station in the German North Sea. The contract also includes an option for the BalWin2 steel substructure. The contract is worth between NOK 1.5 billion (approximately EUR 130 million) and NOK 2.5 billion (about […]

  • 26 October 2023
    Collaboration, Outlook & Strategy

    Energinet has awarded Semco Maritime an eight-year framework agreement for the provisioning of technical consultants within the design, supervision, testing, commissioning, and maintenance of onshore and offshore technical facilities. The collaboration commences this month and solidifies Semco Maritime’s position as Energinet’s trusted partner and preferred sub-supplier of technical consultants, according to the company. “We are […]

  • 26 February 2019
    Grid Connection, Wind Farm Update

    The 370MW Norther offshore wind farm has delivered first power to the Belgian grid. The project’s first four MHI Vestas 8.4MW turbines were connected to Stevin, Elia’s new high-voltage station in Zeebrugge today, 26 February. Half of the generated wind energy will be sold to Engie and the remaining half to Eneco, Norther NV said. Van […]

  • 27 August 2019
    Grid Connection

    EDS HV Group has carried out a cable testing campaign for Vattenfall at the Horns Rev 1 offshore wind farm in Denmark after the project had experienced network issues. EDS used Damped AC testing (DAC) to collect partial discharge (PD) and tanδ data to interpret the condition of the inter-array cables and subject the entire system […]

  • 12 December 2018
    Contracts & Tenders, R&D, Technology

    Siemens, Shell, and TenneT have proposed a new tendering model for offshore wind power in Germany which would be used to produce hydrogen.

  • 20 October 2014
    Grid Connection

    Sembmarine SLP Limited (SLP), which is 70% owned by Sembcorp Marine, was awarded a contract to design and build the offshore substation platform for the Dudgeon Offshore Wind Farm. The contract was granted by Siemens Transmission & Distribution Limited, which was awarded the contract for the Electrical System Infrastructure by the wind farm’s developer Dudgeon […]

  • 16 March 2015
    Authorities, Wind Farm Update

    The Danish Energy Agency (DEA) has issued updates on the latest developments in the country’s offshore wind sector.  On Wednesday, March 11, the DEA held a presentation on the Danish tenders at the seminar ‘Experience and Explore Denmark’. Kriegers Flak offshore wind farm status: The contract notice and the results from the last round of dialogue […]

  • 21 June 2013

    Elia requires a contractor to carry out study, construction and maintenance of an artificial island, Alpha, which is to be located approx. 45kms offshore from the port of Zeebrugge on the Lodewijk bank and characterised by a depth of approx. 30m LAT. The primary function of the island is the creation of a permanent and […]

  • 30 April 2013
    Technology

    Siem Offshore has entered into a shipbuilding-contract with Remontowa Shipbuilding S.A. in Poland. The contract has been signed for the construction of a dynamically positioned Cable Lay Vessel (“CLV”) scheduled for delivery in April 2015. The associated gross project cost for the first vessel, ready for operation, is approx. USD 85 million. The CLV has […]

  • 8 April 2014
    Wind Farm Update

    DBR Generatorsets has successfully completed commissioning and start-up of its custom-built auxiliary power package for E.ON’s Amrumbank West wind farm substation. DBR delivered and installed two 1,250kVA diesel generator sets and one 250kVA set. Cofely Fabricom is assembling the topsides at its Hoboken, Belgium yard before installation in the German Bight. “This was a challenging […]

  • 26 August 2022
    Grid Connection, R&D, Technology

    Prysmian Group has developed and tested its first 525 kV extruded subsea full cable system for High Voltage Direct Current (HVDC) applications. The company said that this innovation in cable technology will enable a massive increase of the maximum transmission capacity of bi-pole systems up to more than 2.5 GW, which is more than double […]

  • 23 November 2017
    Ports & Logistics, R&D, Wind Farm Update

    Sif has started the production of monopile foundations and has produced half of the primary steel for the transition pieces (TPs) to be installed on the 370MW Norther offshore wind farm located in the Belgian North Sea.

  • 29 September 2016
    Business & Finance, Grid Connection, Vessels, Wind Farm Update

    Siem Offshore Contractors GmbH (SOC) has chosen the UK-based JDR Cable Systems Ltd.  to design, manufacture and supply inter-array grid cables for the 588MW Beatrice wind farm offshore Scotland. Beatrice comprises 84  Siemens 7MW wind turbines, which will be inter-connected by 91 x 33 kV medium voltage alternating current submarine composite cables. JDR will manufacture around 163km of […]