10000 results found for 'first'

10000 results found for 'first'
Order results by

A list of search results

  • 22 March 2017

    LM Wind Power has started the construction works on its new offshore wind turbine blade factory in Cherbourg, France, the company’s spokesperson confirmed to Offshore WIND.

  • 9 September 2016
    Operations & Maintenance, Vessels

    Today’s opening event for the Dudgeon Offshore Wind Farm Operations Centre will also incorporate the naming of the wind farm’s purpose built 84-metre service operations vessel (SOV), Esvagt Njord. The vessel marks a new approach to operations and maintenance with accommodation for up to 40 wind turbine technicians who will live on the ship and […]

  • 10 August 2016
    Business & Finance, Grid Connection, Wind Farm Update

    Dutch Sif Holding N.V. has been awarded a contract for the production of all tubular components for the jacket of the BorWin gamma platform.  The contract includes the production of legs, bracings, pile sleeves and pin piles for the jacket. The project is being undertaken by Petrofac in consortium with Siemens for the German-Dutch transmission grid operator […]

  • 4 August 2016
    Operations & Maintenance, Technology, Wind Farm Update

    ScottishPower Renewables has awarded SeaRoc Group with a 5-year framework contract to provide Health, Safety and Quality management support to their 714MW East Anglia ONE offshore wind farm. Scope of work includes provision of specialist personnel to provide advice and support to the project during construction, development of management systems, and to deliver training to […]

  • 11 April 2019
    Contracts & Tenders, Wind Farm Update

    Vryhof has selected FMGC (Fonderie et Mécanique Générale Castelbriantaise) to provide its clump weights for the 25MW WindFloat Atlantic floating wind project offshore Portugal. WindFloat Atlantic, owned by Windplus SA, is expected to be fully operational in the second half of 2019 some 20 kilometers from Viana do Castelo in Portugal at a depth of […]

  • 1 April 2019
    Contracts & Tenders

    SeaPlanner Ltd has won a contract to provide its SeaPlanner marine management system and SeaHub communications solutions to support the construction of the 857MW Triton Knoll offshore wind farm. The SeaPlanner will be deployed for use by the construction project team to coordinate all personnel and marine logistics for the 145 kilometre-square site located some 33 […]

  • 23 August 2017

    Lower Saxony’s Minister of Economics, Labour and Transport Olaf Lies has inaugurated a new berthing space and a new ramp at the port of Cuxhaven’s offshore terminal.

  • 6 June 2017
    Grid Connection, Wind Farm Update

    VBMS, a subsidiary of Royal Boskalis Westminster, has been awarded a contract to assist DEME’s subsidiary Tideway with the installation of three nearshore and shallow water sections of export cables for DONG Energy’s 1.2GW Hornsea Project One offshore wind farm.

  • 3 May 2017
    Operations & Maintenance, Wind Farm Update

    Colchester-based offshore services provider CWind has reached the halfway point on a 15-month project to provide a wide range of secondary works at Iberdrola’s 350MW Wikinger offshore wind farm in the German Baltic Sea.

  • 10 July 2017
    Contracts & Tenders, Vessels, Wind Farm Update

    Works on the export cables which will bring ashore the energy generated by the 400MW Rampion offshore wind farm are scheduled to gather pace in the next couple of weeks, according to a notice to mariners.

  • 28 June 2017
    Wind Farm Update

    The rotor for the 27th wind turbine was successfully installed last week at the Nordsee One construction site, marking the halfway point for turbine installation at the 332 MW wind farm.

  • 5 February 2018
    Contracts & Tenders, Grid Connection, Operations & Maintenance, R&D, Wind Farm Update

    Van Oord has contracted Dutch subsea cable logistics specialist WIND to support the cable transfer operations on the Borkum Riffgrund 2 offshore wind project.

  • 22 January 2018
    Contracts & Tenders, Wind Farm Update

    Ørsted has awarded Norway’s Imenco Corrosion Technology AS with a contract to deliver equipment for cathodic corrosion protection of the 1.2GW Hornsea Project One wind farm off the Yorkshire coast in the UK.

  • 17 April 2018
    Ports & Logistics, Vessels

    DEME Group’s advanced cable lay vessel Living Stone has arrived from Santurtzi in Spain to Vlissingen, the Netherlands, where the vessel will undergo final outfittings before completion, DEME’s spokesperson told Offshore WIND.

  • 2 November 2015
    Authorities, Wind Farm Update

    The Scottish Government has granted a marine licence to Statoil for the construction of Hywind Scotland project, the world’s largest floating offshore wind development. The pilot park will comprise five floating 6MW turbines installed approximately 25km off the coast of Peterhead, with a generating capacity of 135GWh of electricity each year. It is expected that the Hywind Scotland […]

  • 14 September 2015
    Wind Farm Update

    The developer of US first offshore wind farm, Deepwater Wind, is making some safety changes after an independent consultant has identified several health and safety issues. ABS Group, a Houston-based firm listed several concerns during the construction of five foundations at the 30MW Block Island offshore wind farm. In the report for Rhode Island Coastal […]

  • 22 December 2015
    Business & Finance, Wind Farm Update

    WindMW, the company behind the Meerwind offshore wind farm, has issued a EUR 978 million in bonds to refinance an existing bank debt for the construction of the 288MW offshore wind project. The bonds were issued on 17 December 2015 to a group of around 20 international institutional investors and benefit from investment grade ratings from the […]

  • 28 October 2014
    Authorities, R&D, Wind Farm Update

    In order to ensure that potential tenderers can offer their views on framework conditions and contribute to making the content of the conditions attractive and flexible for the market, the Danish Energy Agency (DEA) decided to conduct a technical dialogue in May 2013 covering two offshore wind projects, the Horns Rev 3 and Kriegers Flak. […]

  • 16 April 2013

    With guests from politics and industry, AREVA Wind celebrated the pouring of concrete for the foundation intended for the wind turbine prototype M5000-135. The event took place close to the motorway A27 in Bremerhaven. M5000-135 is the new version of the M5000, which has already proven itself at German first offshore wind farm Alpha Ventus. […]

  • 11 June 2013

    This will be the first time that Coastline has attended this event as part of it’s commitment to further develop their activities within the offshore renewable sector. Having been established for over 20 years, Coastline Surveys is one of the few remaining independent marine survey companies operating in the UK and is successfully establishing itself […]

  • 25 June 2014
    Authorities

    RES Offshore announced that applications made on behalf of Argyll Tidal Ltd to Marine Scotland and Argyll & Bute Council have recently been approved. The marine license and planning consent allows for the installation of a single, up to 500kW, demonstration tidal device off the Mull of Kintyre, a project which would have the ability […]

  • 6 June 2014

    The visitors to the annual Seawork International event will not just be able to enjoy the good weather that is promised by some forecasters, when looking at all the new vessels and talking to the exhibitors in Southampton next week. They will also be able to attend all the naming and handing over ceremonies of […]

  • 23 May 2014
    Authorities, Business & Finance, Ports & Logistics

    India’s new Prime Minister Narendra Modi, who will swear into office on May 26, will push the country toward renewable energy production, especially offshore wind and solar power, according to industry officials.   Modi’s government could set up a policy for offshore wind power separately, thus paving the way for developers to erect first Indian […]

  • 6 February 2014

    Forewind chairman Charles Hendry MP has been announced as the Programme Ambassador for RenewableUK’s Global Offshore Wind 2014 conference and exhibition. In this role, Mr Hendry will work to increase the profile of the event with both UK and global audiences to encourage attendees and high-profile speakers. The event will be held from Wednesday 11 […]

  • 9 December 2013
    Business & Finance

    ABS, the leading provider of classification services to the global offshore industry, is establishing an office in Houston’s Energy Corridor near the intersection of Interstate 10 and Highway 6. The new facility will co-locate members from ABS engineering, project management, technology and business management, allowing ABS to better serve its client base in this significant […]

  • 29 April 2014
    R&D, Technology

    The third step of tidal energy testing called Round Robin took place at CNR-INSEAN this month. Comparisons were based on the performance measurements of the device (torque and thrust) in a flow velocity range from 0.6 to 1.2 m/s, as was done in the first and second leg of testing.  The use of the same […]